Loading...
HomeMy WebLinkAbout3564-1PHASE DIAGRAM kW P" A 'rOACC19% 010%-UAN 0%-Mffdl=OAI 1 TRAFFIC SIGNAL AND LIGHTING SHALL CONFORM TO THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 AND STANDARD PLANS (DATED JULY 2002). 2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE, THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800)227-2600, TWO WORKING DAYS BEFORE: DIGGING, 3. ALL TRAFFIC SIGNAL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 2" RIGID METAL UNLESS OTHERWISE SHOWN. ALL INTERCONNECT PULLBOXES SHALL BE BROOKS TYPE P48 WITH EXTENSIONS (OR APPROVED EQUAL), PER SPECIAL PROVISIONS. INTERCONNECT PULLBOX LIDS SHALL BE LABELED "COMMUNICATIONS". 4. ALL VEHICLE INDICATIONS SHALL BE 12", ALL VEHICLE AND PEDESTRIAN HEADS SHALL BE PER SPECIAL PROVISIONS. 5, CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING WITH SOUTHERN CALIFORNIA EDISION COMPANY WELL IN ADVANCE OF NEED. 6. EXISTING LIGHTING SHALL REMAIN IN OPERATION UNTIL NEW SIGNAL AND LIGHTING IS OPERATIONAL PER SPECIFICATIONS, 7. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT, 8. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER, 9, CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. MODIFY SPRINKLER SYSTEMS IF NECESSARY, 10. CONTRACTOR SHALL REFER TO THE CITY TRAFFIC ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND/OR SPECIFICATIONS FOR THIS PROJECT. 11. AL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK. 12. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS AND HARDWARE TO CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXECPT AS NOTED TO BE CITY FURNISHED, OR LISTED AS CITY PROVIDED IN THE SPECIAL PROVISIONS. 0 m m mirr- CONDUITS AND 4 -SACK ORANGE PEA GRAVEL BACKFILL DUCT INSTALLATION AND TRENCH REPAIR DETAIL INSTALLATION IN UNPAVC[ =El� N.T.S. DETAIL "C" ---------F—T REVISION DESCRIPTION DATE ENGRCITY p �r C*43,1. E 1- 0 C A 710 N D ET A I L CHECKED BY: mm FURNISH AND INSTALL 2 CONDUIT WITH PULL ROPE FOR FUT. INTERCONNECT CABLE (6PR. #22), FURNISH AND INSTALL 6-1.5" SCHEDULE 40 HDPE CONDUITS WITH PULL ROPES PER DETAIL "C". THE CONDUITS SHALL BE COLOR CODED ORANGE, YELLOW, RED, BLACK, BLUE AND GREEN, CONDUIT SWEEPS SHALL BE INSTALLED WITH A MINIMUM 1O --FOOT RADIUS. CC' A FURNISH AND INSTALL 3" PVC CONDUIT WITH 1/4" POLY PULL ROPE PER SCE REQUIREMENTS. COORDINATE SERVICE WITH SCE (DAVID QUEZADA 909-357-6240 & CANERA MILES 909-357-6505). C*43,1. E 1- 0 C A 710 N D ET A I L CHECKED BY: mm