Loading...
HomeMy WebLinkAbout3562-1F coNDtjc,rOR TABLE Ilk, /N 2 j - - - ----- --- -c' ... ..... .. 4 - -------- - - --- ...... .... ... .. ...... . . - ---- -------- .... ...... .... . .. ....... uj I lj,A A C v . . ......... - - A il 7rt id cc ..... . ..... . . ... J MOUNTING DETAIL 0Oil .............. 17 c 2�j + -5 m RD LID CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL OFF SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. < F No, 20258 Exp, 9-30.05 0/ V & 0/m CWW'� NMI 0 - I . J k 't I K T I M I 3t -n -tu nurr- CONDUITS AND 4 -SACK ORANGE PEA GRAVEL BACKFILL DUCT INSTALLATION AND TRENCH REPAIR DETAIL Utj�-TALLATIQ�NIN UNPAVED STREET STREET N.T.S. DETAIL "C" POLE k.0CATION DETAIL 70, '7 i� i'll" 71, 1�3 No 7, INSTALLATION ONLY PULL BOXES AS SHOWN SHALL BE INSTALLE;� AT THE END OF A,.`'D:RUN TRAFFIC SIGNAL CONSTRUCTION NOTESi 3. ALL TRAFFIC SIGNAL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 2" RIGID ,'w L METAL UNLESS OTHERWISE SHOWN. ALL INTERCONNECT PULLBOXES SHALL BE i ltv BROOKS TYPE P48 WITH EXTENSIONS (OR APPROVED EQUAL), PER SPECIAL PROVISIONS. TRAFFIC SIGNAL GENERAL NOTESi i,lj N. INTERCONNECT PULLBOX LIDS SHALL BE LABELED "COMMUNICATIONS". 4. ALL VEHICLE INDICATIONS SHALL BE 12. ALL VEHICLE AND PEDESTRIAN HEADS N F 1 TRAFFIC SIGNAL AND LIGHTING SHALL CONFORM TO THE STATE OF CALIFORNIA SHALL BE PER SPECIAL PROVISIONS, Lu 5. STANDARD SPECIFICATIONS SECTION 86 AND STANDARD PLANS (DATED JULY 2002.) > WITH SOUTHERN CALIFORNIA EDISION COMPANY WELL IN ADVANCE OF NEED. Now LvJ FURNISH AND INSTALL 2" CONDUIT WITH PULL ROPE FOR FUT. INTERCONNECT CABLE (6PR. #22). cc 2, LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR 6. EXISTING LIGHTING SHALL REMAIN IN OPERATION UNTIL NEW SIGNAL, AND LIGHTING THE CONDUITS SHALL BE COLOR CODED ORANGE, YELLOW, RED, BLACK, BLUE AND GREEN. SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS IS OPERATIONAL PER SPECIFICATIONS. 0 -- ---- - ON THE JOB SITE, HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTIONS. uj LOCATIONS PRIOR TO FINAL PLACEMENT, PHONE UNDERGROUND SERVICE ALERT AT (800)227-2600, TWO WORKING DAYS INSTALL 3" PVC CONDUIT WITH 1/4" POLY PULL ROPE PER SCE 8. 9 oc BEFORE DIGGING CANERA MILES SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER, RD LID CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL OFF SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. < F No, 20258 Exp, 9-30.05 0/ V & 0/m CWW'� NMI 0 - I . J k 't I K T I M I 3t -n -tu nurr- CONDUITS AND 4 -SACK ORANGE PEA GRAVEL BACKFILL DUCT INSTALLATION AND TRENCH REPAIR DETAIL Utj�-TALLATIQ�NIN UNPAVED STREET STREET N.T.S. DETAIL "C" POLE k.0CATION DETAIL 70, '7 i� i'll" 71, 1�3 No 7, INSTALLATION ONLY PULL BOXES AS SHOWN SHALL BE INSTALLE;� AT THE END OF A,.`'D:RUN TRAFFIC SIGNAL CONSTRUCTION NOTESi 3. ALL TRAFFIC SIGNAL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 2" RIGID L METAL UNLESS OTHERWISE SHOWN. ALL INTERCONNECT PULLBOXES SHALL BE i ltv BROOKS TYPE P48 WITH EXTENSIONS (OR APPROVED EQUAL), PER SPECIAL PROVISIONS. 34 N. INTERCONNECT PULLBOX LIDS SHALL BE LABELED "COMMUNICATIONS". 4. ALL VEHICLE INDICATIONS SHALL BE 12. ALL VEHICLE AND PEDESTRIAN HEADS N F SHALL BE PER SPECIAL PROVISIONS, Lu 5. CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING > WITH SOUTHERN CALIFORNIA EDISION COMPANY WELL IN ADVANCE OF NEED. Now LvJ FURNISH AND INSTALL 2" CONDUIT WITH PULL ROPE FOR FUT. INTERCONNECT CABLE (6PR. #22). cc FURNISH AND 6. EXISTING LIGHTING SHALL REMAIN IN OPERATION UNTIL NEW SIGNAL, AND LIGHTING THE CONDUITS SHALL BE COLOR CODED ORANGE, YELLOW, RED, BLACK, BLUE AND GREEN. IS OPERATIONAL PER SPECIFICATIONS. 0 7. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT uj LOCATIONS PRIOR TO FINAL PLACEMENT, 0 INSTALL 3" PVC CONDUIT WITH 1/4" POLY PULL ROPE PER SCE 8. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND oc CANERA MILES SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER, mi 9. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. MODIFY SPRINKLER SYSTEMS IF NECESSARY, mi no= > 10. CONTRACTOR SHALL REFER TO THE CITY TRAFFIC ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND/OR SPECIFICATIONS FOR THIS PROJECT, SCALE 1"=20' 11. AL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK. 20 10 0 20 40 60 12. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS AND HARDWARE TO CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXECPT AS NOTED TO BE CITY FURNISHED, OR LISTED AS CITY PROVIDED IN THE SPECIAL PROVISIONS. Pry Dr%IT(ZYrW nFQrPTDTTrW DATE FNm CITY DAT RD LID CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL OFF SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. < F No, 20258 Exp, 9-30.05 0/ V & 0/m CWW'� NMI 0 - I . J k 't I K T I M I 3t -n -tu nurr- CONDUITS AND 4 -SACK ORANGE PEA GRAVEL BACKFILL DUCT INSTALLATION AND TRENCH REPAIR DETAIL Utj�-TALLATIQ�NIN UNPAVED STREET STREET N.T.S. DETAIL "C" POLE k.0CATION DETAIL 70, '7 i� i'll" 71, 1�3 No 7, INSTALLATION ONLY PULL BOXES AS SHOWN SHALL BE INSTALLE;� AT THE END OF A,.`'D:RUN TRAFFIC SIGNAL CONSTRUCTION NOTESi L i ltv N. N F j LvJ FURNISH AND INSTALL 2" CONDUIT WITH PULL ROPE FOR FUT. INTERCONNECT CABLE (6PR. #22). FURNISH AND INSTALL 6-1.5" SCHEDULE 40 HDPE CONDUITS WITH PULL ROPES PER DETAIL "C". THE CONDUITS SHALL BE COLOR CODED ORANGE, YELLOW, RED, BLACK, BLUE AND GREEN. CONDUIT SWEEPS SHALL BE INSTALLED WITH A MINIMUM 10 -FOOT RADIUS. FURNISH AND INSTALL 3" PVC CONDUIT WITH 1/4" POLY PULL ROPE PER SCE REQUIREMENTS. COORDINATE SERVICE WITH SCE (DAVID QUEZADA 909-357-6240 & CANERA MILES 909-357-6505). RD LID CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL OFF SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. < F No, 20258 Exp, 9-30.05 0/ V & 0/m CWW'� NMI 0 - I . J k 't I K T I M I 3t -n -tu nurr- CONDUITS AND 4 -SACK ORANGE PEA GRAVEL BACKFILL DUCT INSTALLATION AND TRENCH REPAIR DETAIL Utj�-TALLATIQ�NIN UNPAVED STREET STREET N.T.S. DETAIL "C" POLE k.0CATION DETAIL 70, '7 i� i'll" 71, 1�3 No 7, INSTALLATION ONLY PULL BOXES AS SHOWN SHALL BE INSTALLE;� AT THE END OF A,.`'D:RUN D ) CHECKED BY: R.S. D )