HomeMy WebLinkAbout3549-1VICINITY MAP
NOT TO SCALE
THOMAS GUIDE PAGE AND GRID: 574—F4
Z
60'
30'__ _ ____ _____________30' ----4
0.5' ---- --- 18'---- --- 18' ---- 7.5'----10.5'1
. � —�q 7.5 _ 11 ' ' I — 4'
1 I —a--"- 1.5A� i1.5f.`f;) — �1.5_IIV� 2
r•• `
1
SAWCUT AND 29 PROP. CONCRETE SIDEWALK
JOIN I STANDARD DRAWING NO. 1015
CONSTRUCT 4.5" A.C. PAVEMENT OVER
12" MIN. OF 957 COMPACTED NATIVE SUBGRAOE
CONSTRUCT CONCRETE CURB
AND GUTTER
BASIS OF BEARING
S O' 09' E FOR CENTERLINE OF
ALMERIA AVE. PER TRACT NO. 3348
M.B. 47-15 SAN BERNARDINO COUNTY
RECORDS.
TYPICAL SECTION
NOT TO SCALE
Underground Service Alert
of Southern California
CALLBEFORE YOU DIG
CALL:
TOLL FREE
1-800-422-4133
Two Working Days Before You Dig
STREET IMPROVEMENT PLANS GENERAL NOTES
1 ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS
OTHERWISE NOTED.
2 WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE
RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL
IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3 ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4 CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT
DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION
SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC
RIGHT—OF—WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5 THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES
DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON—METRIC EDITION
UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER
TRAFFIC CONTROL DEVICES AT ALL TIMES.
7 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5
FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8 THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY
SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE
DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL
ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A
SEPARATE PERMIT FOR THAT PURPOSE.
10 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO.
THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS
BEFORE EXCAVATION.
11 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION,
DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY
COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE
AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR
VALVE OPERATION AND WATER REQUIREMENTS.
13 CURVE DATA REFERS TO THE FACE OF CURB.
14 STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR
TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16 THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17 REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT
TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
PRIVATE ENGINEERING NOTE MARK REVISIONS APPRoVALING DATE �P[�vAL DATE
NOT REQUIRED BY GOVERNING AGENCY)
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH
GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION
CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE
RESPONSABILITY FOR JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THE PROJECT. INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE
MADE TO APPLY CONTINOUSLY AND NOT TO BE LIMITED TO
NORMAL WORKING HOURS, AND
CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND,
INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY
AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY
ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. MARK REVISIONS pENGRo,,T'NG DATE AMcoVAL DATE
13¢F -SS/
140. CO256FA f
e
18 THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A
MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIDIES IN THE CONSTRUCTION AREA FOR RESIDENTS
AND EMERGENCY VEHICLES.
19 THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING
ADEQUATE WATERING, AT ALL TIMES.
20 ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES
PER HOUR.
21 THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED
ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT
PRIOR WRITTEN APPROVAL.
22 NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23 A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE
REQUIRED DENSITY SHALL REQUIRE RE—WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY IS OBTAINED.
24 CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY
NON—ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25 THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF
CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
26 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE.
27 THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER
LATERAL.
28 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED
AND APPROVED.
29 ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
30 APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31 PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE
CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32 ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS
SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR
APPROVAL UPON COMPLETION OF ROUGH GRADING.
33 ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
34 UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES,
AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35 CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY
THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
36 AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL
PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
CONSTRUCTION NOTES: QUANTITIES
1D CONSTRUCT 8" CURB AND GUTTER PER CITY OF FONTANA STANDARD PLAN NO. 1003 60.7' L.F.
O2 CONSTRUCT DRIVEWAY APPROACH PER CITY STANDARD PLAN NO. 1005 1 E.A.
16' WIDE, X=4'
O3 CONSTRUCT CONCRETE SIDEWALK PER CITY OF FONTANA STANDARD PLAN NO. 1015 237 SQ.FT.
® CONSTRUCT MIN. 4.5" A.C. PAVEMENT OVER 12" MIN. OF 957. COMPACTED 379 SQ.FT.
NATIVE SUBGRADE
O
SAWCUT
AND JOIN EXISTING A.C.
PAVEMENT. 72 L.F.
O6
EXISTING
SEWER HOUSE LATERAL
CONNECTION PER DWG. NO. 2104 (STA 22+61).
PREPARED UNDER THE DIRECTION OF: VILLARRUEL AND ASSOCIATES
CIVIL ENGINEERING AND LAND SURVEYORS
!,l(p 7340 FLORENCE AVENUE, SUITE 218
ABLO B. SANCHEZ R.C.E. 029664 DOWNEY, CA 90240
�,
Xp, 3-31-07 Date: 4& (562) 928-6006 TEL. JOB NO. VA003-092
BENCHMARK: FOUND R.R. SPIKE IN POLE OPP. LOS CEDROS
INTERSECTION OF CITRUS AVE. AND LOS CEDROS AVE.
Date: B.M. NO.615 MARCH -1983 ELEV. 1467.59
CITY OF FONTANA, CALIFORNIA
STREET IMPROVEMENT PLAN
Drawn by: 6599 ALMERIA AVE�UE Scale:
A.V. AS SHOWN
Designed by: LOT 374, TRACT NO, 33 Date:
A.V. STA 2+14 50 TO ST& ;6( 4 10-04
by: Approved:
E.V.
l •S . No. ISheet
51152 3549 11 OF 2