Loading...
HomeMy WebLinkAbout3527-2MATGHLINE 'A' _ I STA. 24+50 I co 10 I I I I I I I I ! I I I� I 1 I I I 1 I I I 8 1-1 f 216 1 7 ! I 1 I I I I MATGHLINE '6' 5TA. 26+00 { MATCHLINE `B' I STA. 26+00 I I ! I I ( ! I 6 1' 9 I I I I I ! I I I ! I I I c IRRIGATION SPECIFICATIONS ALL NORK SHALL BE IN ACCORDANCE WITH THE CITY OF FONTANA'5 LANDSCAPE DEVELOPMENT DESIGN INTENT 15 TO PROVIDE COMPLETE IRRIGATION COVERAGE TO ALL PLANTED AREAS, A5 STANDARD LANDSCAPE SPECIFICATION MANUAL FOR STREETSCAPES AND PARKS. FIELD CHANGE MAY OCCUR, CONTRACTOR 15 REQUIRED TO PROVIDE 100% COVERAGE TO ALL 5"(M AREAS. IN NO INSTANCE SHALL HEAD 5PACIN6 EXCEED 55% OF MANUFACTURER'S RECOMMENDED VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO COMMEWVN6 ANY WORK, NOTIFY THE SPADING FOR COVERAGE. CONTRACTOR SHALL NOT KNOWINGLY INSTALL A SPRINKLER SYSTEM LANDSCAPE ARCHITECT IMMEDIATELY IF ANY DISCREPANCY 15 FOUND. CONTRACTOR SHALL WITH IMPROPER COVERAGE, FAILURE TO NOTIFY THE LANDSCAPE ARCHITECT SHALL RESULT IN THOROUGHLY FAMILIARIZE HIMSELF KITH ALL 51TE CONDITIONS PRIOR TO BIDDING OR THE CONTRACTOR REPAIRING/REPLACING SAID SYSTEM AT H15 OR HER EXPENSE. COMMENCING WORK. TORO 51OZ-6P-0OM-5H-PC 30 ALL SPRINKLER HEADS INSTALLED ADJACENT TO CURBS AND NALK5 SHALL BE POP-UP TYPE. EXTREME CARE SHALL BE EXER015ED WHEN NORKING ADJACENT TO ANY STRUCTURES OR IN NO INSTANCE SHALL R15ER TYPE 5PRINKLER5 BE IN5TALLED ADJACENT TO PEDE5TRIAN UTILITIES. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES AND AREAS. REPAIRING ANY DAMAGES CAU5E0 BY HIS WORK AT NO C05T TO THE ONNER. 5"lOZ-I2P-COM-STVAN 30 VARIES THE CONTRACTOR SHALL FLUSH AND ADJUST ALL SPRINKLER HEADS FOR OPTIMUM PERFORMANCE IRRIGATION DESIGN 15 BASED ON AN AVAILABLE WATER PRE55URE OF 'i5 P.5.1. WITH A AND TO MINIMIZE OVER5PRAY ONTO WALK5, ROADWAY5 AND/OR BUILDINGS. TH15 SHALL. MAXIMUM SYSTEM DEMAND OF 26 G.P.M. CONTRACTOR SHALL VERIFY DATA PRIOR TO INCLUDE 5ELECTING THE BEST DEGREE OF ARG TO FIT THE EXISTING 5fTE CONDITIONS AND COMMENCING WORK. NATER AVAILABILITY INFORMATION WAS OBTAINED FROM FONTANA NATER TO THROTTLE THE FLON CONTROL AT EACH VALVE TO OBTAIN THE OPTIMUM FRE55URE FOR EACH COMPANY. SYSTEM. 'I !V1 ! y I ' ! I I I-1i26l IRRIGATION EQUIPMENT SHORN IN I HARDSCAPE FOR GRAPHIC CLARITY ONLY. --� ACTUAL MAINLINE AND EQUIPMENT TO BE 3 PLACED IN SHRUB AREA. TYPICAL V m • • 20 40 .• 201 MAKE POINT OF CONNECTION AT THE NATER METER A5 SHOWN ON THE PLANS AND RUN GL -315 P.V.G. MAINLINE 16" DEEP TO AREAS WHERE VALVES ARE LOCATED. INSTALL A LINE SIZED GATE VALVE IN A ROUND PLASTIC BOX AT P.O.G. FOR EMERGENCY SHUT-OFF. THE LANDSCAPE ARCHITECT SHALL BE RESPONSIBLE FOR THE INTERPRETATION OF THE DRAHING5 SHOULD A QUE5TiON ARISE. PIPING SHONN ON THE PLANS 6 E55ENTIALLY DIAGRAMMATIC, ROUTE PIPING AND LOCATE VALVES TO AVOID CONFLICT WITH STATIONARY ELEMENTS. WHEN VERTICAL OBSTRUCTIONS (FIRE HYDRANTS, LIGHTS, TREES ETC) INTERFERE W1TH THE SPRAY PATTERN OF THE HEADS, THE IRRIGATION CONTRACTOR SHALL FIELD ADJUST THE SPRINKLER SYSTEM AT NO ADDITIONAL COST TO THE OWNER, BY INSTALLING A QUARTER OR HALF HEAD SPRINKLER ON EACH 51DE OF THE OBSTRUCTION SO AS TO PROVIDE PROPER COVERAGE. LOCATE ALL VALVES AND BACKFLOW DEVICE IN SHRUB BEDS WHERE POSSIBLE. WIRING FROM THE CONTROLLER TO THE VALVES SHALL BE DIRECT BURIAL A.F.N., MINIMUM 14 GAUGE. PROVIDE CONTINUOUS SPARE WIRE5 TO VALVE(5) FURTHEST FROM THE CONTROLLER. LOOP HIRE INTO EACH VALVE BOX ALONG THE MAINLINE KITH A MIN, 30" EXPAN51ON COIL. SPARE WIRE 15 TO BE A DIFFERENT COLOR FROM OTHER CONTROL WIRE5. LABEL WIRE SPARE IN CONTROLLER. ALL PIPING AND WIRING UNDER PAVING SHALL BE SLEEVED IN A SDH. 40 PVC, PIPE, SIZE AS REQUIRED AND KITH A MINIMUM COVER TO FINISHED PAVEMENT GRADE OF 24". ALL EQUIPMENT SHALL BE INSTALLED PER DETAILS, IN THE ABSENCE OF DETAILS, INSTALLATION SHALL BE IN ACCORDANCE HIT4 THE STANDARD PRACTICE OF THE TRADE. CONTRACTOR SHALL GUARANTEE ALL MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE BY THE ONNER. PROVIDE A COLOR CODED LAMINATED CONTROLLER CHART IN THE CONTROLLER SHONING THE VALVES AND AREAS SERVED BY EACH VALVE. BEFORE BEGINNING CONSTRUCTION, THE CONTRACTOR MUST OBTAIN ALL NECESSARY PERMITS FROM THE CITY. THE IRRIGATION SYSTEM WILL BE TESTED BY THE ONNER5 REPRESENTATIVE IN THE FIELD BEFORE FINAL APPROVAL. INSTALL ALL COMPONENTS PER CURRENT U.P.G. AND LOCAL CODES. PROVIDE CHECK VALVES AS NEEDED TO ELIMINATE ALL LOW HEAD DRAINAGE. CONTRACTOR SHALL MAINTAIN A GLEAN AND SAFE NORKING ENVIRONMENT. DAY AND NIGHT ALL EQUIPMENT SHALL BE AS LISTED IN THE LEGEND. SUBSTITUTIONS HILL NOT BE BARRICADES MUST BE PROVIDED FOR ALL OPEN TRENCHES. PERMITTED WITHOUT PRIOR APPROVAL OF THE LAN05CAPE ARCHITECT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTINO THE UNDERGROUND SERVICE ALERT CONTRACTOR SHALL PROVIDE COMPLETE AND ACCURATE RECORD PRAAIN65 TO THE CITY UPON AT I-800-422-4133 AT LEAST 48 HOURS PRIOR TO TRENCHING FOR EXACT UNDERGROUND COMPLETION OF THE PROJECT. DRAWINGS SHALL INDICATE ANY CHANGES FROM THE ORIGINAL UTILITY LOCATIONS. THE CONTRACTOR A55UME5 ALL RESPONSIBILITY FOR THE REPAIR OR PLANS AND DIMENSIONS OF VALVES, QUICK COUPLER5, CONTROLLERS AND ALL OTHER REPLACEMENT OF UNDERGROUND UTILITIES OR 5TR ICTURE5 MICH ARE DAMAGED DURING THE EQUIPMENT FROM STATIONARY POINTS OF REFERENCE. COURSE OF COMPLETING TH15 WORK. SPECIFICATIONS FOUND IN THE CITY OF FONTANA STANDARD LANDSCAPE SPECIFICATIONS SHALL TAKE PRECEDENCE AND SHALL BE FOLLOWED FOR THE INSTALLATION OF THE LANDSCAPE AND IRRIGATION SYSTEM. REFER TO SHEET 6 FOR IRRIGATION CONSTRUCTION DETAILS INDEX MAP N.T.S. I Rini OAT) ON ECRU I PMENT L EOEND 5"(M PE50RIPTION MANUF. MODEL P51 OPM RAD. NOTES E) POP-UP SPRAY SPRINKLER TORO 51OZ-6P-0OM-5H-PC 30 0.20 5' ADJUST AS REQUIRED, SEE DETAIL A SHEET 6 O POP-UP SPRAY SPRINKLER TORO 5"lOZ-I2P-COM-STVAN 30 VARIES 6' ADJUST A5 REQUIRED, SEE DETAIL A SHEET 6 O POP-UP SPRAY SPRINKLER TORO 51OZ-12P-GOM-SQ-PG 30 0.22 8' ADJUST A5 REQUIRED, SEE DETAIL A SHEET 6 ® POP-UP SPRAY SPRINKLER TORO 5"70Z-I2P-COM-95H-P0 30 0.44 8' ADJUST AS REQUIRED, SEE DETAIL A SHEET 6 4 POP-UP SPRAY SPRINKLER TORO 5lOZ-{2P-COM-IoQ-PG 30 0.3"1 10' ADJUST A5 REQUIRED, SEE DETAfL A SHEET 6 B POP-UP SPRAY SPRINKLER TORO 51OZ-12P-COM-IOH-PC 30 0.15 10' ADJUST A5 REQUIRED, SEE DETAIL A SHEET 6 0 POP-UP SPRAY SPRINKLER TORO 51OZ-12P-COM-TVAN-10 30 VARIES 10' ADJUST A5 REQUIRED, SEE DETAIL A SHEET 6 EB POP-UP SPRAY SPRINKLER TORO 51OZ-12P-COM-iOF-PG 30 1.44 10' ADJUST AS REQUIRED, SEE DETAIL A SHEET 6 ® POP-UP SPRAY SPRINKLER TORO 51OZ-bP-COM-I2H-PC 30 0.46 12' ADJUST AS REQUIRED, SEE DETAIL A 5HEET 6 POP-UP SPRAY SPRINKLER TORO 51OZ-12P-COM-I5Q-PC 30 0.85 15' ADJUST A5 REQUIRED, SEE DETAIL A SHEET 6 POP-UP 5PRAY SPRINKLER TORO 51OZ-I2P-COM-I5H-P6 30 1,50 15' ADJUST A5 REQUIRED, SEE DETAIL A SHEET 6 a POP-UP SPRAY SPRINKLER TORO 5702-i2P-COM-TVAN-15 30 VARIES 15' ADJUST AS REQUIRED, SEE DETAIL A SHEET 6 ® POP-UP ROTOR HUNTER PGH -ADV -03, 06 30 2.2, 0.4 30-56 ADJUST AS REQUIRED, SEE DETAIL A SHEET 6 ® ELECTRIC CONTROLLER TORO NETWORK 8000 #1324-6-0S SEE DETAIL B SHEET 6 03 SPARE COMMON AND PILOT AIRES. COLOR TO DIFFER FROM SITE WIRING- SEE WRITTEN SPECIFICATIONS SHEET 2 ►- GATE VALVE NIBCO T -113 -LINE SIZED SEE DETAIL 6 SHEET 6 O IRRIGATION CONTROL VALVE SUPERIOR g50DW SERIES -SIZE AS SHONN SEE DETAIL D SHEET 6 ® ELECTRIC METER BY OTHERS INSTALLED IN CONTROLLER ENCLOSURE PROVIDED BY OWNER R. P. BACKFLOW PREVENTER AILKINS 475XLN/ NYE STRAINER A55EMB - SIZE PER PLAN SEE DETAIL E SHEET 6 (� QUICK COUPLER VALVE RAINBIRD 330RC (3/4") INSTALL IN LOKINO PLA6TICV X -a MASTER VALVE SUPERIOR 2"-3000 SERIES -NORMALLY OL05ED INSTALL PER MANUF. RECOMMENDATIONS (D FLOW SENSOR DATA INDUSTRIAL 22OP-1-1/2" INSTALL PER MANUF. RECOMMENDATIONS ® PROP05EV 1-1/2" WATER METER BY OTHERS CONFIRM LOCATION IN THE FIELD r — SDH. 40 FVC, PIPE/HIRE 5LEEVE UNDER ALL PAVING BURY MIN. 24"- SIZE PER CHART v ®�' 5CH 40 2" PVG MAINLINE- 2" MAINLINE PER CITY MAINTENANCE BURY MIN. 16" SCH 40 PVC LATERAL LINE BURY MIN. 12" 3 VALVE NUMBER 1-1 26 VALVE DEMAND GPM) VALVE 51ZE —� —Hil— -fUll -HH11-- PIPE SIZE LEGEND 3/4' 111 1-1/4" NOTE: NO PIPE SIZES SMALLER THAN 3/4" 1-1/2" 2" REFER TO SHEET 6 FOR IRRIGATION CONSTRUCTION DETAILS INDEX MAP N.T.S.