Loading...
HomeMy WebLinkAbout3526-6PLANTING NOTES 1. GENERAL - ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CITY AND COUNTY CODES; AND THESE PLANS. THE CONTRACTOR SHALL APPLY FOR ALL PERMITS AND PAY FOR SAME. A. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON THE PLANS AT THE SITE PRIOR TO COMMENCMENT OF ANY WORK UNDER THIS CONTRACT. B. THE CONTRACTOR SHALL CARRY ALL WORKER'S COMPENSATION, PUBLIC LIABILITY AND PROPERTY DAk4AGE INSURANCE. AS REQUIRED RY THE OWNER - C. THE CONTRACTOR SHALL APPLY FOR ALL PERMITS AND PAY FOR SAME. ALL IRRIGATION WORK SHALL HAVE RECOMMENDED APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING ANY GROUNDCOVER PLANTING WORK. Ex THE OWNER'S SUPERINTENDENT AND THE LANDSCAPE ARCHITECT WILL REVIEW THE PLANTING WORK. PRIOR TO STARTING WORK, THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT AND COORDINATE ALL REVIEWS. E. THE QUALITY OF WORKMANSHIP AND MATERIALS SHALL BE OF THE HIGHEST STANDARDS. COOPERATION AND FLEXIBILITY IS EXPECTED OF THE CONTRACTOR TOWARD WORKING WITH THE OWNER/LANDSCAPE ARCHITECT IN PRODUCING THE BEST POSSIBLE PRODUCT. F. UPON COMPLETION OF EACH PHASE OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE SITE OF ALL ACCUMULATED RUBBISH, DEBRIS, AND OTHER EXTRANEOUS MATERIAL. 2. SCOPE OF WORK - FURNISH ALL MATERIAL, LABOR, TRANSPORTATION, EQUIPMENT AND PROPERTY TO COMPLETE THE LANDSCAPING OF THE PLANTING AREAS SHOWN ON THE DRAWINGS, OR REASONABLY IMPLIE TO COMPLETE THE CONSTRUCTION. INCLUDED AS A PART OF THE WORK, BUT NOT NECESSARILY LIMITED BY 11, ARE THE FOLLOWING ITEMS: FINE GRADING OF ALL PLANTING AREAS, PREPARATION OF ALL PLANTING AND TREE HOLES, FURNISHING AND INSTALLATION OF ALL REQUIRED PLANTING BACKFILL MATERIALS, TREE STAKE AND MISCELLANEOUS MATERIALS, FURNISHING AND INSTALLATION OF ALL PLANT MATERIALS, PROVIDING MAINTENANCE THROUGHOUT THE SPECIFIED PERIOD, CLEAN-UP AND WEEDING OF ALL LANDSCAPE AREAS, GUARANTEE OF ALL PLANT MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE YEAR 3. THE CONTRACTOR SHALL REMOVE ALL WEEDS, ROCKS OVER 2' DIAMETER, DEBRIS AND OTHER EXTRANEOUS MATERIAL FROM THE JOB SITE IN A LEGAL MANNER PRIOR TO PROCEEDING WITH ANY WORK UNDER THIS CONTRACT. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADE, INCLUDING ANY IMPORT SOIL ADJUSTMENTS TO EARTH BERMS. PROVIDE FINISH GRADE IN PLANTING AREAS 1 % MINIMUM FLOW. FINISH GRADES SHALL BE 2" BELOW ADJACENT WALKS, CURBS, DRIVEWAYS, ETC. IN GROUND COVER AREAS. 5. ALL TREES AND SHRUBS SHALL BE PLANTED PER THESE NOTES AND AS DETAILED. ALL PLANT MATERIAL SHALL BE OF THE HIGHEST QUALITY AND LARGEST REASONABLE SIZE AVAILABLE FOR THE SPECIFIED CONTAINER SIZE (WITHOUT BEING ROOT BOUND). SHRUB MATERIALS SHALL BE VIGOROUSLY GROWING, HEALTHY PLANT MATERIAL, FULL AND BUSHY, OF HINES WHOLESALE NURSERY/MONROVIA NURSERY COMPANY QUALITY, OR EQUAL. THE LANDSCAPE ARCHITECT WILL REVIEW ALL PLANT MATERIAL WHEN SPOTTED FOR PLANTING, AND WILL NOT HESITATE TO REJECT ANY MATERIAL OF QUESTIONABLE QUALITY, OR OF LESS THAN THE LARGEST REASONABLE SIZE MATERIAL AVAILABLE. 6. NO PLANT SUBSTITUTIONS ARE TO BE MADE WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT. 7. ALL GROUNDCOVER AS NOTED IN THE LEGEND SHALL BE ROOTED TIP CUTTINGS FROM FLATS AND SHALL BE PLANTED IN STAGGERED ROWS CONTINUOUSLY UNDER ALL TREES AND SHRUBS IN THE AREAS AS DESIGNATED ON THE PLANS AND AT THE SPACING INDICATED IN THE LEGEND. GROUNDCOVER SHALL BE INSTALLED NO CLOSER THAN 1/2 THE ON CENTER SPACING AS INDICATED ON PLANS. 8. TO ALL NEW PLANTING AREAS (SHRUB AND GROUNDCOVER) ROTOTILL THE FOLLOWING AMENDMENTS 4'-6" DEEP AND IRRIGATE THOROUGHLY: 200 LBS. OF GRO-POWER/1000 S.F. 3 CU. YDS. NITROGEN STABILIZED ORGANIC AMENDMENT/1000 S.F. 9. AFTER EARTHWORK, INSTALLATION OF IRRIGATION SYSTEM, AND SOIL PREPARATION, BUT PRIOR TO PLANTING, PERFORM WEED ABATEMENT PROGRAM TO ALL PLANTING AREAS AS FOLLOWS: TO ALL PLANTING AREAS ALLOW A WEEK MIN. FOR WEED ABATEMENT PROCESS A. APPLY SULFATE OF AMMONIA AT THE RATE OF 5 LBS. PER 1,000 SQ. FT. TO ALL AREAS TO BE PLANTED. B. KEEP AREA MOIST BY REGULAR IRRIGATIONS FOR A PERIOD OF TWO (2) WEEKS TO GERMINATE EXISTING WEED SEEDS. C. AT THE END OF TWO WEEKS, APPLY "ROUND -UP" OR EQUAL SYSTEMIC HERBICIDE. DO NOT IRRIGATE WITH -IN SIX (6) HOURS AFTER APPLICATION. HERBICIDE SHALL BE APPLIED BY AN INDIVIDUAL WITH THE PROPER LICENSE. REFER TO MFG. SPECIFICATIONS FOR PERIOD OF TIME REQUIRED FROM TIME OF APPLICATION TO TIME IMPLEMENTING PLANTING. AFTER COMPLETE WEED KILL, REMOVE ALL WEED RESIDUE AND TOP GROWTH AND DISPOSE OF IN A LEGAL MANNER. NOTE: ALTERNATE METHODS OF WEED KILL FOR ITEM'C' MAY BE VAPAM OR METHYL BROMIDE APPLIED PER LICENSED HERBICIDE AGENCY AND SPECIFICATIONS. D. REPEAT STEPS A,B & C. 10. ALL PLANTING AND BARE SOIL AREAS (EXCEPT AREAS TO RECEIVE HYDROSEED) ARE TO BE TREATED WITH A PRE -EMERGENT CHEMICAL (SUBJECT TO APPROVAL BY LANDSCAPE ARCHITECT PRIOR TO APPLICATION). CHEMICALS ARE TO BE APPLIED BY A LICENSED PEST CONTROL AGENT AT THE RATES RECOMMENDED BY THE MANUFACTURER. THIS TREATMENT SHALL BE APPLIED AT THE FOLLOWING TIMES DURING THE CONTRACT: A) AT THE BEGINNING OF PLANT ESTABLISHMENT PERIOD AND B) AT THE END OF THE PLANT ESTABLISHMENT PERIOD.(IF IT EXCEEDS 90DAYS) NO CHEMICALS SHALL BE APPLIED OTHER THAN IN THE PRESENCE OF THE INSPECTOR. 11.BACKFILL MIX FOR TREES AND SHRUBS SHALL BE AS FOLLOWS: - 6 PARTS BY VOLUME NATIVE ON-SITE SOIL - 4 PARTS BY VOLUME NITROLIZED FIR SHAVINGS - 18 LBS OF GRO-POWER PER CU./YD. OF MIX - 2 LBS. OF IR❑N SULFATES PER CU./YD OF MIX - GRO-POWER PLANTING TABLETS FOR EXTENDED FEEDING/SOIL CONDITIONING. SEE TREE AND SHRUB PLANTING DETAILS FOR PLACEMENT AND QUANTITIES. THE ABOVE SHOULD BE THOROUGHLY BLENDED PRIOR TO USE FOR BACKFILL PURPOSES. THE IRON SULFATE SHOULD NOT CONTACT CEMENT SURFACES SINCE SEVERE STAINING COULD OCCUR. 12. MAINTENANCE PERIOD - THE MAINTENANCE PERIOD SHALL COMMENCE UPON THE OWNER'S AND THE LANDSCAPE ARCHITECT'S WRITTEN RECOMMENDED APPROVAL OF ALL PHASES OF PLANTING INSTALLATION AND SHALL BE FOR NINETY (90) CONTINUOUS CALENDAR DAYS. 13. MAINTENANCE PROCEDURES - THE GENERAL CARE AND MAINTENANCE OF ALL AREAS SHALL CONSIST OF PROPER WATERING, FERTILIZATION, WEEDING, CLEAN-UP, AND AS FOLLOWS: A. CULTIVATE AND WEED AT LESS THAN TEN (10) WORKING DAY INTERVALS. B. APPROXIMATELY 30 DAYS AFTER INITIAL PLANTING, APPLY 25 LBS. OF GRO-POWER PER 1,000 SQ. FT. AND IRRIGATE THOROUGHLY. THE SECOND APPLICATION USING THE ABOVE PRODUCT AT THE SAME RATE SHALL BE APPLIED IN ANOTHER 60 DAYS OR JUST BEFORE THE MAINTENANCE PERIOD ENDS. C. CONTRACTOR SHALL MAINTAIN THE IRRIGATION SYSTEMS IN A LIKE NEW, OPERATING CONDITION, ADJUSTING HEAD HEIGHTS, THROW AND SPRAY ARCS AS NECESSARY. THE CONTRACTOR IS RESPONSIBLE FOR PROPER WATERING OF ALL PLANTING AREAS, AND SHALL REPLACE ANY MATERIAL DAMAGED DUE TO IMPROPER MOISTURE. D. ANY CONCENTRATED DEVELOPMENT OF WEED GROWTH THAT MAY APPEAR IN PLANTING AREAS DURING MAINTENANCE PERIOD SHALL BE REMOVED AT TEN (10) DAY INTERVALS. THE CONTRACTOR MAY ELECT TO REMOVE SUCH CONCENTRATIONS OF WEEDS MANUALLY OR BY AN APPROVED HERBICIDE PROGRAM. E. DURING THE COURSE OF THE MAINTENANCE WORK, THE CONTRACTORSHALL REMOVE SURPLUS MATERIALS AND DEBRIS FROM THE SITE AND SHALL KEEP THE PREMISES IN A NEAT AND CLEAN CONDITION AT ALL TIMES. F. DURING THE MAINTENANCE PERIOD, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ADEQUATE PROTECTION FOR ALL PLANTING AREAS. ANY DAMAGED AREAS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. 14. ITEMS 8, 11 & 13B ARE FOR BID PURPOSES ONLY. CONTRACTOR SHALL SUBMIT SOIL SAMPLE TO SOIL & PLANT LAB, P.O. BOX 6566 ORANGE, CA 92613 (714-282-8777). CONTRACTOR SHALL SUBMIT TEST RESULTS AND LAB RECOMMENDATIONS TO L.A. FOR REVIEW. CONTRACTOR SHALL AMEND SOIL, PREPARE BACKFILL & FERTILIZER PER TEST RESULTS, OWNER SHALL PAY FOR WHOLESALE COST OF MATERIALS ONLY SHOULD TEST RESULTS REQUIRE ADDITIONAL MATERIALS BEYOND BID SPECIFICATION. OWNER / DEVELOPER: NEW WEST HOME 369 SAN MIGUEL DRIVE, SUITE 375—A NEWPORT BEACH, CA 92660 (949) 640-6420 * FAX: (949) 640-6484 I IW 251M Elle. 12/31/01 avm Is z .n 1$" APPROVED BY: _/ `" CITY (ENGINEER DATE: ROBERT W. WEDDLE 77MOTHY RASTEDT . DRAWN BY: DATE OF LAST REVISION: SHINGLE NAIL LODGE POLE TREE TRUNK CINCH TIE (DO NOT TWIST) REVAILING WIND DIRECTION -2` DIA LOOGEPOLE PINE TREE STAKE COPPER NAPTHENATE TREATED AND DRIVEN IN GROUND TO 2FT. MIN. DEPTH. 2 REO'D =CINCH TIE' (4) RE080 -ARBOR GUARD IN TURF AREAS PREPARED BACKFILL MIX. SEE SPECIFICATIONS 3" HIGH WATER BASIN. AT TIME OF PLANTING FINISH GRADE AGRIFORM TABLETS TO BE ADDED PER MFG. RECOM DS. CITY OF FONTANA TREE STAKING STD. PIAN NO. 531 SHT. 1 OF1 6,. RADIUS EDGES 1/212 FINISH GRADE 4 �r(TURF SIDE) #3 REBAR, CONTINUOUS NATIVE SOIL 90% COMPACTED APPROVED BY: CITY ENGINEER DATE: ROBERT W. WEDDLE DRAWN BY: TIMOTHY RASTEOT DATE OF LAST REVISION: BENCHMARK: B.M. N0. 361 ELEV.= 1365.00 NAIL IN POLE #1536697E S.W. CORNER SULTANA & BASELINE CITY OF FONTANA CONCRETE MOW CURB STD. PLAN NO.544 I SHT. 10171 MARK I BY ( DATE ENGINEER [NIP PERMANENT BASIN 1 1/2"X MIN. ROOT13ALL OEPTH - 2X THE WIDTH OF ROOTBALL PUDDLE AND SETTLE BACKFIL - PRIOR TO PLACEMENT OF SHRUB QpOfESSIp�� APPROVED BY: I& 25126 CITY ENGINEER DATE: ROBERT W. WIEDDLE DRAVYN BY: TIMOTHY RASTIRDT. ?! ON t tsDATE OF LAST REVISION: PERMANENT BASIN EXisnNG SLOPE i 1 1/2"X MIN. ROOTBALL DEPTH 2X THE WIDTH OF ROOT13ALL PUODLE AND SETTLE BACKnL PRIOR TO PLACEMENT OF SHRUB CITY OF FONTANA SHRUB PLAN-nNG STD. PLAN NO. 535 SHT. 1 OF1 TAPER 1:1 MAX. CUT SLOPE O PLANT PIT 1.55z:::FERTIUZER TABLETS (SEE SPECS.) FUR APPROVED APPROVED BY: fi IIx 251:6 CITY ENGINEER DATE: ROBERT WI. WEDDLE EI. 12/31/01 * DRAWN BY TIMOTHY RA5TEDT . OWL IF !x n1lE`, DATE OF LAST REVISION: IPPR. DATE COUNTY �-p'NDSCq'c�' W � n ee S/ql£ a e OF CA�- ROOTBALL BACKIFILI. MIX. (SEE SPECS. CITY OF FONTANA SHRUB ON SLOPE STD. PLAN NO. 536 1 SHT. 1 OF1 3612 MISSION /NN AVE R/VERS/OE, CALIF. 92501 LIC. }x1512 ►aasr::ora PH. (909) 781-1930 FAX (909) 686-8091 PREPARED BY: DATE: For a simple formula to determine the quontity of panels required for a Linear application use: Estimated Diameter of the Tree Canopy at Maturity + 2' (61cm) = Length of Barrier per Side. As little as one side of the tree may For One Sde of Tree need barrier for root direction as Eqiftlml Tres Linear Style Planting with DeepRoot Barriers Universal there may be no hardscape else- Determine the correct number of panels to be used. D. Next place the barrier in the trench with the vertical ribs Linear Bawler tt W inwhere Depending upon the actual planting plan and the number of facing toward the tree and oNn in a straight fashion. It is (LB 12 or LB 18) trees involved the length of linear barrier will vary, but as a helpful to place the barrier against the hardscape. Use the Note: Linear Barriers (LB 12-2 and LB 12' 3.6m general rule of thumb take the anticipated mature canopy hardscape as a guide and backfill against the barriers to +2' 61cm = 14' 4.2m diameter of the tree and add 2 feet (61cm). This will be the promote a clean smooth fit to the hardscope. Be sure to 7 Panels 18-2) are packaged in 2' (61cm) long number of feet necessary for a Linear style planting keep the barrier's double top edge at least 1/2' (13mm) Diameter +2' 61cm application. (See chart below.) above grade to ensure roots do not grow over the top. 10 Panels A Choose the barrier that best suits the application. Generally E Plant the tree(s). The Linear style offers a more expansive 24' 7.3m Diameter if a sidewalk, patio or driveway is to be protected. 18' rooting growth area, however adverse soil and drainage = 26' 7.9m 46cm) (LB 18-2) is sufficient depth with 12' (30cm) conditions may exist in the actual planting area. Take steps LB 12-2) as an alternate choice for non-aggressive, deeper to ensure healthy growth of the tree at planting. Consult with rooting trees. However for curb and gutter protection or more a local Arborist for planting tips and recommendations. egressive roots 24" (61cm) (UB 24-2) is generally the better choice. F. If the tree(s) will be subject to maintenance work such as lawn mowing or weed trimming we strongly recommend the B. Dig the trench to the depth based upon the particular installation of ArborGord+ Tree Trunk Protectors which is 30 BERM TO FORM barrier chosen. placed around the base of young trees to protect them from WATER BASIN damage by weed trimmers, lawn mowers and small rodents. G Install the barrier. When using DeepRoot Linear Barriers simply pull the appropriate number of panels out of the box For additional information please consult the 16 page FERTILIZER TABLETS (they come preassembled) and separate the joiner at the DeepRoot Product Selection and Installation Guidelines. • correct length. When installing DeepRoot Universal Barriers in a t linear fashion you will need to join the appropriate number of For information regarding distributors please call: 1 800 ILY panels together. ROOT (458.7668). For help with difficult drainage or other ROOTBALL difficult installation questions please call DeepRoot Technical - BACKFILL MIX. Support at: 1 800 ROOT TEK (766.8835). QpOfESSIp�� APPROVED BY: I& 25126 CITY ENGINEER DATE: ROBERT W. WIEDDLE DRAVYN BY: TIMOTHY RASTIRDT. ?! ON t tsDATE OF LAST REVISION: PERMANENT BASIN EXisnNG SLOPE i 1 1/2"X MIN. ROOTBALL DEPTH 2X THE WIDTH OF ROOT13ALL PUODLE AND SETTLE BACKnL PRIOR TO PLACEMENT OF SHRUB CITY OF FONTANA SHRUB PLAN-nNG STD. PLAN NO. 535 SHT. 1 OF1 TAPER 1:1 MAX. CUT SLOPE O PLANT PIT 1.55z:::FERTIUZER TABLETS (SEE SPECS.) FUR APPROVED APPROVED BY: fi IIx 251:6 CITY ENGINEER DATE: ROBERT WI. WEDDLE EI. 12/31/01 * DRAWN BY TIMOTHY RA5TEDT . OWL IF !x n1lE`, DATE OF LAST REVISION: IPPR. DATE COUNTY �-p'NDSCq'c�' W � n ee S/ql£ a e OF CA�- ROOTBALL BACKIFILI. MIX. (SEE SPECS. CITY OF FONTANA SHRUB ON SLOPE STD. PLAN NO. 536 1 SHT. 1 OF1 3612 MISSION /NN AVE R/VERS/OE, CALIF. 92501 LIC. }x1512 ►aasr::ora PH. (909) 781-1930 FAX (909) 686-8091 PREPARED BY: DATE: For a simple formula to determine the quontity of panels required for a Linear application use: Estimated Diameter of the Tree Canopy at Maturity + 2' (61cm) = Length of Barrier per Side. As little as one side of the tree may For One Sde of Tree need barrier for root direction as Eqiftlml Tres Nkurlber of Fid ofOPS Universal there may be no hardscape else- Canopy at ► Linear Bawler tt W inwhere requiring protection. (LB 12 or LB 18) number of Panels Note: Linear Barriers (LB 12-2 and LB 12' 3.6m Diameter +2' 61cm = 14' 4.2m 7 Panels 18-2) are packaged in 2' (61cm) long 18' 5.5m Diameter +2' 61cm m = 20' ImJ 10 Panels panels with re -attached flexible Pa P 24' 7.3m Diameter +2' 61cm = 26' 7.9m 13 Panels boners reody to pull out of the carton and install in one continuous line of up DeepRoot LB 12-2, LB 18-2 or UB 24-2 to: LB 12-2 W (24 m) per Carton LB 18-2 52 16 m) per Carton Line can be separated at any two foot interval S Sidewalk 0 _ _ o Ground Locks Sidewalk TO BE 24" DEEP ON ALL SIDES r0 1ALt i �1 6h A PLANT SPACING A$ PER PLAN PLANT SPACING A$ PER PLAN PREPARE BED AS PER PLANTING NOTES pl AN VIF=111 .C. CIN -L_ G CITY OF FONTANA, CALIFORNIA v.PUBLIC WORKS DEPARTMENT DRAWN BY: PARKWAY LANDSCAPE PLAN SCALE: PB FOR 1 "=30'-0" DESIGNED BY: TRACT 1 6 DATE: JE LANT j DEC. 17,2003 CHECKED BY APPROVE BY , DWG. NO. SHEET E E : DO SANDOVAL. R.G.E. 51152 6 � 6