Loading...
HomeMy WebLinkAbout3448-1I ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK'). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2 WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3 ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4 ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 5 CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUN17Y DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY 1411THIN THE CITY LIMITS. CALL (909) 350-7610. 6 THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 7 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 8 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 9 THE MIALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT 10 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 11 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 12 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES, 13 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 14 STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED. 15 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16 THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17 REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18 THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES, A MINIMUM 72 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19 THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20 THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL, 21 NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 22 A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 23 CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 24 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 25 NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 26 PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CIT)` APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS. 27 IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY 28 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29 ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 3O APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31 ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 32 UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 33 AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 34 MINIMUM D -LOAD FOR STORM DRAIN PIPE IS 1350. MILLER AVENUE/ BEECH AVENUE STORM DRAIN FROM STA. 10+00.00 TO STA. 4e+91.21 CITY OF FONTANA 1:1 SLOPE OR GREATER OR ADEQUATE SHORING 907. COMPACTED NATIVE BACKFILL 3" MAX. SIZE -' GRANULAR BEDDING FROM SELECTED TRENCH SIDE MATERIAL (1 " MAX. SIZE). i U S9k 5 � r 11N. IAX. 'D' STORM DRAIN PIPE 0.6 - GRANULAR BEDD/NG FROM SELECTED TRENCH .SITE MATERIAL FOR PIPE 10' OR GREATER /N DEPTH USE 1/2 CRUSHED STONE BEDDING. RCP TRENCH DETAIL NOT TO SCALE mtm 1. TRENCH WIDTH SHALL BE CONTROLLED TO TOP OF PIPE ZONE. 2, TRENCH DEPTHS OF GREATER THAN 5' SHALL HAVE ADEQUATE SHORING. 3, CLASS Il AGG. BASE ALL TRENCHES LESS THAN 100' IN LENGTH. N COMPACTION SHALL BE 957. IN ALL ZONES UNLESS OTHERWISE SPECIFIED, TRENCH STABILITY SHALL CONFORM TO CAL -OSHA REQUIREMENTS. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS; TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS, THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS, THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS, THE CONTRACTOR AGREES THAT HE SHALL_ ASSUME SOLE AND COMPLETE RESPONSIBIL17Y FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY; REAL OR ALLEGED IN CONNE-CTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL_ REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF WORK. STORM DRAIN LINE (SEE PLAN FOR PIPE SIZE) (TYP ) DETAIL '"" (TYPICAL WATER/STORM DRAIN UNDERCROSSING DETAIL) NOT TO SCALE wiliff,` o 04 CITY OF FONTANA PACIFIC BELL CO. ATTN: CARLOS NAVARRO ATTN: VIRGINIA BECKER 8353 SIERRA AVENUE 3939 E. CORONADO STREET FONTANA, CA 92335 ANAHEIM, CA 92807 (909) 350-6632 (714) 666-5467 50. CALIFORNIA GAS COMPANY COMCAST (CABLE TV) ATTN, ALAN KESELOFF ATTN: JACK HAYES 16231 VALLEY BLVD, 1205 DUPONT AVENUE FONTANA, FONTANA, CA. 92335 ONTARIO, CA. 91761 (909) .335-7781 (909) 390-4736 EXT 3055 EMERGENCIES: (800) 427-2200 STORM DRAIN SO. CALIFORNIA EDITON COMPANY FONTANA WATER COMPANY ATTN: JAIME AMESZCUA ATTN: AL KROHN (909) 357-6581 8440 NUEVO AVENUE 7951 REDWOOD AVENUE FONTANA, CA 92335 FONTANA, CA. 92335 (909) 822-2201 EXT. 323 (909) 820-5598 UNDERGROUND FAX. (909) 823®-5046 (909) 820-5137 TRANSMISSIONS 141A TER (213) 637-1233 PIPELINES CRAWFORD CANYON MUTUAL WATER CO. (909) 357-6589 DISTRIBUTION ATTN: BILL VANDERKIEFT, JR. (800) 227-2600 (619) 868-6040 UNDERGROUND SERVICE ALERT TELEPHONE (800) 227-2600 EASEMENT REV. REVISION DESCRIPTION DATE ENGR. G(n DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH INA DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE FLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. 'T,P) g VICINITY N. T S. LEGEND.- INSTALL 60" R.C.P., D LOAD PER PROFILE FWC FONTANA WATER COMPANY TC TOP OF CURB FL FLOW LINE (GUTTER) INV INVERT ELEVATION STA STATION MH MANHOLE CB CATCH BASIN R/W RIGHT-OF-WAY CL CENTERLINE SD STORM DRAIN WA WATER SEW SEWER RCP REINFORCED CONCRETE PIPE VCP VITRIFIED CLAY PIPE 13 CENTERLINE -- - -® RIGHT-OF-WAY W 141A TER S SEWER E ELECTRIC G GAS T TELEPHONE ------ EASEMENT NCH K- #360 BASIS OF BEARINGS - C17 -Y OF FONTANA BENCH MARK j 360 THE BEARING OF N 00'22'40" E ALONG THI A NAIL IN POLE j 1563704E CL OF BEECH AVE., AS SHOWN ON TR NO AT SOUTHWEST CORNER OF LIME AVE. 13325-2, FILED IN BK. 216, PG. 13-18, AND BASELINE AVE INCLUSIVE /N MAPS IN THE OFFICE OF THE COUNTY RECORDER OF S.R.C., WAS USED E A 1376.03 AS THE BASIS OF BEARING FOR THIS MAP. INSTALL 60" R.C.P., D LOAD PER PROFILE 482 LF INSTALL 48" R.C.P., D -LOAD PER PROFILE 1,988 LF INSTALL 36" R.C.P., D -LOAD PER PROFILE 1,302 LF INSTALL 3O" R.C.P., D -LOAD PER PROFILE 58 LF INSTALL 24" R.C.P., D --LOAD PER PROFILE 118 LF (� CONST MANHOLE PIPE TO PIPE PER APWA STD. PLAN 322-1 1 EA W1TH A BOLT DOWN LID CONSTT, MANHOLE PIPE TO PIPE PER APWA STD. PLAN 320-1 13 EA CONST JUNCTION STRUCTURE -PIPE TO PIPE APWA STD, 1 EA PLAN 331-2 10 CONST. CONCRETE COLLAR FOR R.C.P. PER APWA STD. 380-2 3 EA 11 PROTECT EXISTING IMPROVEMENT IN PLACE - EA 12 CONST. CURB OPENING CATCH BASIN PER APWA STD. 300-2, 3 EA W=PER PLAN 13 CONST PLUG WITH DOUBLE BRICK & MORTAR AND 1"± CONCRETE 3 EA MORTAR AT THE END OF RCB / PIPE %4 REMOVE EXSITT, STORM DRAIN STRUCTURE AND PIPE 5 EA /600 LF 75 CONST BLANKET PROTECTION PER A. P. W A. STD. PLAN 225-1 5 EA 16 FILL EX. STORM DRAIN PIPE WITH SAND, PLUG WTIH 3 EA DOUBLE BRICK AND MORTAR AND ABANDON 17 SAWCUT, REMOVE AND REPLACE EX. AC PAVEMENT 46,570 SF 19 CONST LOCAL DRESSION PER APWA STD, 313-1 3 EA 20 GRIND 5' WIDE AND OVERLAY 0.1 ' MIN. PER DETAIL ON SHT. 2 5920 SF 21 ADJUST WATER VALVES TO GRADE 3 EA 22 ADJUST MANHOLE TO GRADE 1 EA NCH K- #360 BASIS OF BEARINGS - C17 -Y OF FONTANA BENCH MARK j 360 THE BEARING OF N 00'22'40" E ALONG THI A NAIL IN POLE j 1563704E CL OF BEECH AVE., AS SHOWN ON TR NO AT SOUTHWEST CORNER OF LIME AVE. 13325-2, FILED IN BK. 216, PG. 13-18, AND BASELINE AVE INCLUSIVE /N MAPS IN THE OFFICE OF THE COUNTY RECORDER OF S.R.C., WAS USED E A 1376.03 AS THE BASIS OF BEARING FOR THIS MAP.