Loading...
HomeMy WebLinkAbout3412-4,fir . t ,+ i ON PROVIDE A OLNGRETE MON C SHEET 6 AT LIMITS OF WORK I AND PRIVATE' LOTS-TYPIOAL IF NORK I I -I- J Eil TH LMP PLANTINO 5PECIFICATION5 SOILS TEST: QUANTITIES: AFTER ALL ROUGH GRADING HAS BEEN GOMPLETEP BUT PRIOR TO 501L PREPARATION, THE OUANTITIE5 5HONN ARE AN AID ONLY, CONTRACTOR SHALL VERIFY ALL OUANTITIE5 GONTRAGTOR SHALL OBTAIN A 501L TEST FOR AGRICULTURAL SUITABILITY AND PRIOR TO BIDPINO✓GOMMENGING WORK. FERTILITY. TEST SHALL BE PREPARED BY A CALIFORNIA A550GIATION OF AGRICULTURAL LABORATORIES MEMBER. FURNISH ONE COPY OF TEST RESULTS TO THE LAN05GAPE 5U155TITUTION5: %- NO PLANT 5UE5TITUT'ION5 WILL. BE PERMITTED WITHOUT THE PRIOR APPROVAL. OF THE -- -- - i AMENDING SHALL BE PER RECOMMENDATIONS. TEST SHALL INCLUDE THE FOLLONING l 1 I ON PROVIDE A OLNGRETE MON C SHEET 6 AT LIMITS OF WORK I AND PRIVATE' LOTS-TYPIOAL IF NORK I I -I- J Eil TH LMP PLANTINO 5PECIFICATION5 SOILS TEST: QUANTITIES: AFTER ALL ROUGH GRADING HAS BEEN GOMPLETEP BUT PRIOR TO 501L PREPARATION, THE OUANTITIE5 5HONN ARE AN AID ONLY, CONTRACTOR SHALL VERIFY ALL OUANTITIE5 GONTRAGTOR SHALL OBTAIN A 501L TEST FOR AGRICULTURAL SUITABILITY AND PRIOR TO BIDPINO✓GOMMENGING WORK. FERTILITY. TEST SHALL BE PREPARED BY A CALIFORNIA A550GIATION OF AGRICULTURAL LABORATORIES MEMBER. FURNISH ONE COPY OF TEST RESULTS TO THE LAN05GAPE 5U155TITUTION5: ARCHITECT. SOILS TEST REPORT SHALL 5UPER5EPE ALL SPECIFICATIONS. NO PLANT 5UE5TITUT'ION5 WILL. BE PERMITTED WITHOUT THE PRIOR APPROVAL. OF THE 5PEGIFIGATION5 5HOWN ARE FOR BIP PURPOSES ONLY, ALL SOIL CONDITIONING AND LANDSCAPE ARCHITECT. AMENDING SHALL BE PER RECOMMENDATIONS. TEST SHALL INCLUDE THE FOLLONING ITEMS: 501L TYPE (TEXTURE), PH, TOTAL SOLUBLE 5ALT-5 (BY ELECTRICAL IAINTENANGE: CONDUCTIVITY OF THE SOIL SATURATION EXTRACT), BORON LEVEL, EXCHANGEABLE CONTRACTOR SHALL MAINTAIN ALL PLANTED AREAS FOR A PERIOD OF HO PAYS AFTER 50DIUM PERCENTAGE, NUTRIENTS (N.P.K.), MICRO NUTRIENTS (NO5, NH4, P, K, Co, ACCEPTANCE BY THE ONNER✓LAND5GAPE ARCHITECT. SCE CIT` 5TANPARP5 BELOI^d. Mg, No, B, Zn, Fe, Cu, Mn, 5), PERCOLATION, 9lo OF ORGANIC MATTER, CATION EXCHANGE CAPACITY, BASE SATURATION, EXCESS LIME OR GARBONATE5. GUARANTEE:. ONNER SHALL GUARANTEE ALL TREES FOR A PERIOD OF ONE YEAR FROM PATE OF FINAL SOIL AMENDMENTS: ACCEPTANCE BY THE CITY. ALL PLANTER AREA5 SHALL HAVE THE 501L AMENPEP KITH 3 OU YP5. NITROLIZEP 5HAVIN65 AND �5 L135. FERTILIZER ROTOTILLCP INTO THE TOP 6" OF SOIL PER ROOT BARRIERS: EACH 1,000 50. FT. OF AREA. ALI_ TREES PLANTER GL05ER THAN FIVE FEET TO GONGRETE 510EINALKS, GUR55 OR ANY PAVING 514AI-L BE PLANTED IN CENTURY DPN ROOT BARRIERS OR EQUAL PER DETAIL L SHEET 6. GRAPINO: TREE STAKING: FIN15H GRAPE IN ALL PLANTED AREAS SHALL BE I" BELOW ADJACENT NALKS, CURES OR STAKE ALL TREES PER DETAIL K SHEET 6. PAVING AND BE FREE OF ROCKS OVER 1-1✓2 IN 51ZE IN THE TOP 4 OF 5011._. WEEPS: _ E AND SHRUB PLANTt_NG:. REMOVE ALL EXISTING NCCPS FROM THE SITE PRIOR TO PLANTING. AFTER PLANTING BACKFILL MIX FOR TREE5 AND 5HRUB5 SHALL GON515T OF 1096 CLEAN ON-51TE 5011 AND TREAT ALL 5HRIU5 BEDS WITH A PRE-EMEROENT HERBICIPE AS RECOMMENDED BY A 50% NITROLIZEP SHAVINGS. PLANT PER RETAIL..J SHEET 6. LICENSED PEST CONTROL ADVISOR. SEDIMENT CONTROL, STREET TREE5: 1. CONTRACTOR 15 TO CONSULT THE CITY TO VERIFY 5PEGIE5 AND SPACING. THE LANDSCAPE GONTRAGTOR SHALL BE RE-5PONSIBLE FOR GOMPLYIN5 WITH 2. TREES SHALL BE A MINIMUM OF 15 GALLON AND SHALL HAVE A I" TO 1-1/4" ALL CONPITION5 OF THE NPPE5 PHASE I AND PHASE 11 RULES ANP DIAMETER CALIPER 5" ABOVE THE TOP OF THE ROOTBALL. THEY SHALL BE REGUL ATION5 RELATINO TO EROSION, SEDIMENT AND POLLUTANT P15GHARGE A 6 TO V IN HEIGHT WITH A SPREAD OF 2' TO 5' CONTROL. CONTROL. INSPECTION N AND CITY NOTES IMPORTANT NOTICE: INSPECTIONS: 5EGTION 421614211 OF THE GOVERNMENT CODE REaUIRE5 A P15 ALERT IDENTIFICATION NUMBER TO BE 155UEP BEFORE A PERMIT TO EXCAVATE N' LL BE VALID. FOR YOUR PIG AI -ERT NUMBER GALL UNDERGROUND SERVICE ALERT TOLL FREE AT (500) 422-4155 TNO NORKINO PAYS BEFORE YOU PIC. MAINTENANCE OUIPELINE5: LANDSCAPE SHALL BE MAINTAINED IN A NEAT, CLEAN, WEEP FREE AND HEALTHY CONDITION. TH15 SHALL INGLUDE, BUT NOT BE LIMITED TO THE FOLLONINO: 1. CULTIVATION OF'PLANTED 5EP5 AT INTERVALS NOT TO EXCEED TCN (TEN) PAY5. 2. REGULAR MOWING TO MAINTAIN A LAWN HEIGHT NOT TO EXCEED TWO (2) INGHE5 (MILL VARY WITH SPEGIE5). 5. REOULAR PRUNINO OF PLANTS A5 NEGE55ARY TO GONTROL AND PIREGT GR.OINTH. 4. 5GHEPULEP MAINTENANCE OF IR.R15ATION CONTROLLER TO A55URE PROPER APPLICATION RATE OF WATER NEGF-55AR.Y FOR PROPER PLANT OROWTH. DRIP IRRIGATION MAY' REQUIRE SPECIALIZED LANDSCAPE MAINTENANCE CARE. 5. IMMEDIATE REPLACEMENT OF PLANT MATERIAL A5 NEEDED DUE TO DEATH, DISEASE OR LACK OF ORONTH. 6. FERTILIZATION ON A REGULAR SCHEDULE AS RECOMMENDED BY THE MANUFACTURER TO PROVIDE PROPER PLANT GROWTH. 7. IMMEDIATE REPAIR OR REPLACEMENT OF IRRIGATION MATERIALS AS NEEDED TO MAINTAIN GOOD NORKING CONDITION. 5. STAKES, GUYS AND TIES ON TREES SHALL. BE CHECKER REGULARLY FOR CORRECT FUNCTION. TIES ARE TO BE ADJUSTED TO AVOID ABRASIONS OR GIRDLING OF TRUNKS OR BRANCHES. 3. UPON COMPLETION OF THE THREE (5) MONTHS OR ONE (1) YEAR MAINTENANCE PERIOD, AN INSPECTION SHALL BE MADE BY THE COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING PIV151ON LANP5GAPE INSPECTION STAFF. THE LANP5GAPE SHALL BE MAINTAINED IN ACCORDANCE WITH THE LAN05GAPE MAINTENANCE STANDARDS. MAINTENANCE BONDING 51-IALL BE RELEASED AT THE ENP OF THE APPROPRIATE PERIOD IF THE LAND5GAPE 15 MAINTAINED IN ACCORDING TO PLANS AND SaPEGIFIOATION, 10. THE PRINCIPAL BOND HOLDER 15 RESPONSIBLE TO CONTACT THE (, ITY AND SCHEDULE THE MAINTENANCE INSPECTION. VIRGINIA STREET VINE5 5HONN ON INTERIOR OF HALL FOR CLARITY" ONLY'_ I PLANT ON EXTERIOR OF HALL-TYPIOAL [NT Wo 12 L._ PROVIDE A CONCRETE MON CURB PER DETAIL SHEET 6 AT LIMITS OF WORK BETWEEN THE LMP AND PRIVATE LOTS -TYPICAL it I. IT 15 THE LAN050APE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISIONS LANDSCAPE INSaPEGTOR 48� HOURS PRIOR TO PE5IREP INSPECTION OF AN ITEM AT (qOq) 550-664q 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLONINO ARE REOUIREP: PRECONSTRUGTION MEETING INSPECTION OF IRRIGATION SYSTEM IN OPEN TR.ENGH CONDITION (PRIOR TO BAGKFILL). MAINLINE PRE55URE TEST AT 150 PSI FOP, A THREE (5) HOUR CONTINUOUS PERIOD. IRRIGATION COVERAGE TE5T5 INCLUPINC INITIAL AND FINAL. FIN15H GRAPE PRIOR TO PLANTING PLANT MATERIALS PRIOR TO PLANTING AND 501L PREPARATION. PLANTING, INCLUDING STREET -ES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT 5ECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS. COMPLIANCE WITH APPROVED PLANS. FINAL INSPECTION. 5. THE ONNER5 REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL, BE PREESENT AT EACH INSPECTION. SEE SHEET 6 FOR PLANTING CONSTRUCTION DETAILS SEE SHEET 5 FOR PLANTING LEGEND