Loading...
HomeMy WebLinkAbout3397-1GENERAL NOTES: 1) ALL WORK SHOWN HEREON SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE "STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION", ("GREEN BOOK"), INCLUDING ALL SUPPLEMENTS AS WRITTEN AND PROMULGATED BY THE JOINT COOPERATIVE, COMMITTEE OF THE SOUTHERN CALIFORNIA CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION AND THE SOUTHERN CALIFORNIA DISTRICT OF THE ASSOCIATED GENERAL CONTRACTORS OF CALIFORNIA, WITH THE CITY OF FONTANA STANDARDS AND SPECIFICATIONS, AND APPENDIX CHAPTER 33 OF U.B.C. 1997 EDITION. 2) PRIOR TO THE START OF GRADING, ALL EXISTING VEGETATION AND DEBRIS, INCLUDING EXISTING STRUCTURES, FOOTINGS, FOUNDATIONS, RUBBLE, TREES, AND ROOT SYSTEMS SHALL BE REMOVED FROM THE SITE TO THE SATISFACTION OF THE GEOTECHNICAL ENGINEER. 3) AFTER REMOVAL OF DEBRIS, ANY EXISTING FILL OR DISTURBED NATURAL SOILS SHALL BE EXCAVATED TO THE SATISFACTION OF THE GEOTECHNICAL ENGINEER. 4) THE EXPOSED SOILS SHALL THEN BE INSPECTED BY THE SOILS ENGINEER AND ANY ADDITIONAL OVER–EXCAVATION SHALL THEN BE MADE IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS AND AS CONTAINED IN THE GEOTECHNICAL REPORT. 5) THE EXPOSED SOILS SHOULD THEN BE SCARIFIED TO A MINIMUM DEPTH OF 6 INCHES, BROUGHT TO PROPER MOISTURE CONTENT AND COMPACTED TO AT LEAST 909 OF THE MAXIMUM DENSITY AS DETERMINED BY U.B.C. STANDARD OR EQUIVALENT COMPACTION SHALL BE OBTAINED BY METHODS SPECIFIED BY THE GEOTECHNICAL ENGINEER. 6) IF ANY UNKNOWN SUB–SURFACE STRUCTURES ARE ENCOUNTERED DURING CONSTRUCTION, THEY SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE GEOTECHNICAL ENGINEER BEFORE PROCEEDING FURTHER. 7) PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR SO AS NOT TO CAUSE ANY MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR ADJACENT PROPERTY AT ALL TIMES DURING CONSTRUCTION. ANY MUD OR DEBRIS ON PUBLIC PROPERTY SHALL BE REMOVED IMMEDIATELY. DUST SHALL BE CONTROLLED BY WATERING OR OTHER APPROVED METHOD THROUGHOUT THE GRADING AND BUILDING CONSTRUCTION OPERATIONS. 8) PRIOR TO THE START OF ANY BUILDING CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE CITY WITH CERTIFICATIONS FROM THE CIVIL ENGINEER AND GEOTECHNICAL ENGINEER THAT BUILDING PAD SUBGRADES ARE WITHIN 0.10 FOOT OF THE APPROVED PLANS AND THAT THE PROPER COMPACTION AND PREPARATION HAS BEEN OBTAINED. 9) NO GRADING SHALL COMMENCE WITHOUT OBTAINING GRADING PERMIT AND NOTIFYING GRADING INSPECTOR 24–HOURS PRIOR TO THE START OF WORK. 10) GRADING INSPECTION DURING INSTALLATION IS REQUIRED FOR ALL DRAINAGE DEVICES. FILL TERRACE BENCHES AND FILL SLOPES MUST BE APPROVED BY THE SOILS ENGINEERS AND CITY BUILDING OFFICIAL PRIOR TO TERRACE PAVING. 11) THE GEOTECHNICAL ENGINEER SHALL ALSO BE RESPONSIBLE TO VERIFY AND REPORT THAT PROPER COMPACTION HAS BEEN OBTAINED BY SUBCONTRACTORS AND AGENCIES CONCERNING UTILITY LINE BACKFILL INCLUDING, BUT NOT LIMITED TO SEWERS, WATER LINES, ELECTRICAL LINES, GAS AND LANDSCAPE IRRIGATION LINES. 12) AN AS–GRADED GRADING PLAN AND CERTIFICATION OF COMPLIANCE WITH SAID GRADING PLAN IS TO BE SUBMITTED TO THE BUILDING AND SAFETY DIVISION PRIOR TO RELEASE OF GRADING BOND AND PRIOR TO FINAL GRADING INSPECTION. 13) ALL SLOPES EXCEEDING 5 FEET IN VERTICAL HEIGHT AND EXCEEDING 5:1 SLOPE ARE TO BE PLANTED WITH APPROVED PLANT MATERIAL AND PROVIDED WITH APPROVED WATERING SYSTEM. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS AND CONTRACT SPECIFICATIONS, AS PER SOILS REPORT PREPARED BY RMA GROUP AND ANY AMENDMENTS THERETO, ARE HEREBY MADE A PART HEREOF. (SEE NOTE 32 BELOW) 14) SANITARY FACILITIES SHALL BE MAINTAINED ON THE SITE FROM THE BEGINNING TO COMPLETION OF GRADING OPERATIONS. 15) IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY ALL AGENCIES CONCERNED BEFORE CONSTRUCTION BEGINS. 16) ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. 17) ALL UTILITY COMPANIES SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO BEGINNING WORK AROUND THEIR FACILITIES. 18) ALL MATERIALS AND METHODS TO BE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 19) ALL WORK SHALL CONFORM WITH THE REQUIREMENTS OF APPENDIX CHAPTER 33 OF U.B.C. 1997 EDITION. 20) WATER SHALL BE APPLIED TO THE SITE TWICE DAILY IN COMPLIANCE WITH SCAQMD RULE 403 (FUGITIVE DUST EMISSIONS) TO MITIGATE THE IMPACT OF CONSTRUCTION GENERATED DUST PARTICULATES. 21) THE APPLICANT MUST SUBMIT A FUGITIVE DUST CONTROL PLAN TO THE CITY CONCURRENTLY WITH THE PRELIMINARY GRADING PLAN TO REDUCE THE AMOUNT OF DUST GENERATED DURING GRADING AND COMPACTION. THE PLAN MUST BE APPROVED BY THE ENGINEERING DIVISION. 22) NO GRADING SHALL TAKE PLACE ONSITE WHEN WIND VELOCITY ONSITE EXCEEDS 15 MILES PER HOUR WITHOUT ADEQUATE WATERING. THE CITY'S CODE ENFORCEMENT DIVISION SHALL ENFORCE COMPLIANCE. 23) THE OWNER/DEVELOPER IS REQUIRED TO SUBMIT TO THE STATE WATER RESOURCES CONTROL BOARD, A "NOTICE OF INTENT" (NOI), TO COMPLY WITH THE TERMS OF THE GENERAL CONSTRUCTION ACTIVITY STORM WATER PERMIT, TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION ACTIVITY. THIS INCLUDES CLEARING, GRADING, OR EXCAVATION THAT RESULTS IN THE DISTURBANCE OF AT LEAST FIVE ACRES OF TOTAL LAND AREA 24) SHOULD THE GRADING WORK BE DISCONTINUED PRIOR TO COMPLETION, APPLICANT SHALL BE RESPONSIBLE FOR STABILIZING SOIL WITH A HYDROSEED MIX. 25) FILL AREAS SHALL BE CLEARED OF ALL VEGETATION AND DEBRIS, SCARIFIED, INSPECTED AND APPROVED BY THE GRADING INSPECTOR PRIOR TO PLACING FILL. 26) THE PERMITTEE SHALL NOTIFY THE ENGINEERING DIVISION AND THE BUILDING & SAFETY DIVISION WHEN THE GRADING OPERATION IS READY FOR ROUGH GRADE INSPECTION WHEN ALL WORK INCLUDING INSTALLATION OF ALL DRAINAGE STRUCTURES AND PROTECTIVE DEVICES HAVE BEEN COMPLETED AND REQUIRED REPORTS HAVE BEEN SUBMITTED. 27) ALL FILLS SHALL BE COMPACTED TO 90% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY A.S.T.M. METHOD D 1557-78 OR APPROVED EQUIVALENT METHOD. CERTIFICATES FROM AN APPROVED SOIL TESTING. AGENCY SHOWING THE DEGREE OF COMPACTION SHALL BE PROVIDED TO THE CITY OF FONTANA BUILDING SUPERINTENDENT, TOGETHER WITH A TABULATION OF THE PERCENT COMPACTION OBTAINED IN THEIR VARIOUS TESTS AND A PLAN SHOWING THE LOCATION OF THE TESTS AND A STATEMENT AS TO THE OVERALL STABILITY OF THE GRADING FOR ITS. INTENDED USE. 28) EXISTING UTILITIES ARE SHOWN FROM ALL AVAILABLE INFORMATION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY FOR THE LOCATION, PROTECTION, REMOVAL OR RELOCATION OF ALL UTILITIES ABOVE OR BELOW GROUND WITHIN THE LIMITS OF GRADING AND ALONG ANY ROUTE OF TRAVEL OF EQUIPMENT. 29) APPROVED PROTECTIVE MEASURES AND TEMPORARY DRAINAGE PROVISIONS MUST BE USED TO PROTECT ADJOINING PROPERTIES DURING THE GRADING PROJECT. 30) CUT AND FILL SLOPES SHALL NOT EXCEED A STEEPNESS OF 2:1, UNLESS OTHERWISE SPECIFIED, ON THE PLAN AND VERIFIED BY SOILS ENGINEER. BENCHMARK: ELEVATION THE BENCH MARK FOR THIS PROJECT IS CALTRANS BM #8-17. IT IS DESCRIBED AS A BRASS CAP IN THE CONCRETE BASE OF THE SOUTH LEG OF AN SCE TOWER 343' NORTH OF HIGHLAND, 0.2 MI WEST OF SAN SEVAINE RD., 2.65 MI WEST OF SIERRA AVE. ELEVATION IS 1428.609 FEET. 31) CUT AND FILL SLOPES AND ALL BRUSHED AREAS SHALL BE PLANTED WITH APPROVED PLANTING AND AN IRRIGATION SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH PROPOSED LANDSCAPE AND IRRIGATION PLANS INCLUDING LOTS ADJACENT TO_CANYONS. 32) SOILS BEARING SPARSE GRASSES MAY BE THOROUGHLY MIXED WITH TEN PARTS CLEAN SOIL. NO ROCK OR SIMILAR IRREDUCIBLE MATERIAL WITH A MAX. DIMENSION GREATER THAN 12 INCHES (12") SHALL BE BURIED OR PLACED WITHIN THREE (3) FEET OF FINISHED GRADE. ALL PLACEMENT OF MATERIALS IN EXCESS OF 12 INCHES SHALL BE PLACED IN ACCORDANCE WITH THE METHOD DESCRIBED IN REPORT "GEOTECHNICAL INVESTIGATION SUMMIT HEIGHTS PROJECT TENTATIVE TRACTS 15839 THROUGH 15844 AND PARCEL 1 OF PARCEL MAP 15269, FONTANA, CA" DATED DECEMBER 8, 1998 BY RMA GROUP. 33) ALL CUT SLOPES SHALL BE INVESTIGATED BOTH DURING AND AFTER GRADING BY AN ENGINEERING GEOLOGIST TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. SHOULD EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS OR POTENTIAL GEOLOGICAL HAZARDS, THE ENGINEERING GEOLOGIST SHALL RECOMMEND NECESSARY TREATMENT TO THE CITY FOR APPROVAL. 34) SUPPORT OR BUTTRESSING OF CUT AND NATURAL SLOPES SHALL BE DETERMINED IN THE FIELD BY THE ENGINEERING GEOLOGIST AND SOILS ENGINEER WHO RECOMMENDED THE TYPE, DESIGN, AND THE LOCATION. 35) THE ENGINEERING GEOLOGIST AND SOILS ENGINEER WILL SUPERVISE THE CONSTRUCTION OF THE BUTTRESSING AND CERTIFY TO THE STABILITY OF THE SLOPE AND ADJACENT STRUCTURES UPON COMPLETION. 36) SPRINGS OR NATURALLY OCCURRING SUBSURFACE WATER FLOWS ENCOUNTERED DURING EXCAVATION WORK SHALL BE PROVIDED WITH DRAINS OR PROTECTED AS REQUIRED TO THE SATISFACTION OF THE CITY BUILDING OFFICIAL. 37) THE ENGINEERING GEOLOGIST AND SOIL ENGINEER SHALL AFTER CLEARING AND PRIOR TO THE PLACEMENT OF FILL IN CANYONS INSPECT EACH CANYON FOR AREAS OF ADVERSE STABILITY AND DETERMINE THE PRESENCE OR ABSENCE OF SUBSURFACE WATER OR SPRING FLOW. 38) BUILDING PERMITS CAN NOT BE ISSUED UNTIL THE FOLLOWING ITEMS ARE COMPLETED TO THE SATISFACTION OF THE CITY BUILDING & SAFETY DIVISION. A PRECISE GRADING PLANS. B GRADING INSPECTION BY A BUILDING AND SAFETY INSPECTOR. C FINAL COMPACTION REPORT/CERTIFICATION FROM THE SOIL ENGINEER. D GRADE VERIFICATION BY THE CIVIL ENGINEER. 39) A UNIFORM BLANKET OF COMPACTED FILL SHALL BE CREATED FOR SUPPORT OF STRUCTURAL FOOTINGS FOR TRANSITION BUILDING PADS CREATED BY PROPOSED CUT AND FILL, OR A TRANSITION LINE CREATED BY THE BOUNDARY OF THE EXISTING FILL. THE FILL CAP SHOULD EXTEND TO AT LEAST TWO FEET BELOW THE BASE OF PROPOSED FOOTINGS AND FIVE FEET BEYOND THEIR PERIMETER. 40) HATCHED AREAS INDICATE THE LIMITS OF PREVIOUSLY PLACED ENGINEERED FILL. 41) BUILDING PAD ELEVATIONS AT OR BELOW EXISTING GRADE IN THE HATCHED AREAS DO NOT REQUIRE ANY REMEDIAL GRADING. 42) AREAS THAT CONTAIN PREVIOUSLY PLACED ENGINEERED FILL AND ARE TO RECEIVE FILL SHALL BE SCARIFIED A MINIMUM OF 12 INCHES. WATERED OR AIR DRIED TO NEAR OPTIMUM MOISTURE CONTENT AND COMPACTED TO A MINIMUM OF 90 PERCENT OF THE MATERIAL'S MAXIMUM DENSITY. 43) ALL COMPRESSIBLE SURFACE SOILS WHICH EXIST OUTSIDE THE CROSS HATCHED AREAS THAT ARE TO RECEIVE FILL SHOULD BE RECOMPACTED TO A DEPTH OF 24 TO 36 INCHES. OUR EXPERIENCE IN THE SUPERPAD GRADING HAS SHOWN THAT THIS CAN BE ACCOMPLISHED BY DEEP SCARIFICATION. WATERED OR AIR DRIED TO NEAR THE OPTIMUM MOISTURE CONTENT AND COMPACTED TO A MINIMUM OF 90 PERCENT OF THE MATERIAL'S MAXIMUM DENSITY. 44) BUILDING PADS WHOSE PROPOSED ELEVATION IS GREATER THAN 36 INCHES BELOW THE EXISTING GROUND SURFACE (OR WHERE DENSE GRAVELY ALLUVIUM IS ENCOUNTERED) DO NOT REQUIRE ADDITIONAL OVEREXCAVATION FOR RESIDENTIAL FOUNDATION SUPPORT. 45) AREAS THAT ARE TO BE PAVED SHOULD BE SCARIFIED TO AT LEAST 12 INCHES BELOW THE EXISTING OR FINISHED GRADE (WHICHEVER IS DEEPER). BROUGHT TO NEAR THE MATERIALS OPTIMUM MOISTURE AND COMPACTED TO AT LEAST 95 PERCENT RELATIVE COMPACTION. 46) THE LOCATION AND PROTECTION OF ALL UTILITIES IS THE RESPONSIBILITY OF THE PERMITTEE. 47) A SOIL ENGINEER APPROVED BY THE CITY AT DEVELOPER'S EXPENSE SHALL SUPERVISE ALL GRADING OPERATIONS. THIS SUPERVISION SHALL BE SUCH THAT THE SOIL ENGINEER CAN DETERMINE THE NATURE OF THE EXCAVATIONS AND FILLS AND KEEP THE WORK UNDER CONTROL. THE ENGINEERING GEOLOGIST SHALL MAINTAIN PERIODIC INSPECTION AND SUBMIT A COMPLETE REPORT UPON COMPLETION OF THE ROUGH GRADING. 48) THE ENGINEERING GEOLOGIST, AT THE COMPLETION OF GRADING, SHALL SUBMIT TO THE CITY OFFICIAL A CERTIFIED REPORT OF HIS/HER FINAL INSPECTION ALONG WITH A STATEMENT TO THE EFFECT THAT HE/SHE HAS INSPECTED ALL FILLS. 49) APPROVED EROSION PREVENTATIVE DEVICES SHALL BE INSTALLED PRIOR TO NOVEMBER 1st AND SHALL BE MAINTAINED ON THE SITE THROUGH APRIL 15th OF THE YEAR FOLLOWING. 50) GRADE LEVEL AREAS TO DRAIN AWAY FROM THE TOP EDGE OF SLOPES. 51) EROSION DUE TO WIND OR WATER SHOULD BE CONTROLLED BY SAND BAGGING AS SHOWN ON THE EROSION CONTROL PLANS, CONTINUOUS WATERING DURING THE GRADING OPERATION, AND OTHER METHODS AS DICTATED BY WIND CONDITIONS. 52) GRADING SHALL CEASE WHEN WINDS EXCEED 25 MPH. 3.00' 1.50' 1.50' �3/8" LIP Y�••"� A", �' . . • d. 6" PCC 6" x 6" 1.4 x 1.4 WWM 4 36 " WIDE PCC `�V" GUTTER DETAIL NTS o: 2 CURB ONLY DETAIL NTS BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS DRAWING IS THE LINE BETWEEN THE NW COR. SEC. 25, R6W, T1 N (PT. 61) AND THE NORTHERLY QUARTER COR. OF SAID SEC. 25 (PT 84). SAID BEARING IS N89'44'05"E AS SHOWN ON RS 30/58-60. 3/8"LIP > " ' • a• , 1 "RAD. cr- p `� y -4-1:-, 1b 2'-2 1/2- 3 CURB AND GUTTER DETAIL NTS GROSS ACREAGE 165,250sq ft / 3.8 Acres '.S. LOT 15842 PAROK SITE oil O ° C ----------------- _....._...._. _tea .. _......_._.. A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT INDEX MAP 1 "= 200' REV. I REVISION DESCRIPTION DATE I ENGR. I CITY I DATE PARKI BASKETBALL COURT NDERGROUND UTILITIES & STRUCTUR SECTION "A— A" SCALE: 1 =10 18' AND VAR. 10' R/W EXIST. TR. 16137 EX. WALL 2.0% SECTION "B—B" SCALE: 1 =10 P/L 1- 14,5' AN 0.5' 1.0' 1.0' til MAC At IERO VAR. 46 DRAIN PER PLAN SECTION "C— C" SCALE: 1 =10 THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN IN THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN, AND IS RESPONSIBLE FOR THE PROTECTION OF, AND ANY DAMAGE TO THESE LINES OR STRUCTURES. "CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES OR USES OF THESE PLANS. ALL REQUESTED CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS." PRIVATE ENGINEER'S NOTICE TO CONTRACTORS THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY: THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILTY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. /QROFESS/pN� ,`4�`�Op PRSHUR �q�F2 r Z No. 31681 z * Exp. 12/31/04 \`rix C/ Iv F OF CAL AVE SUMMIT AVE. CITY 5, 15 OF G` ,FONTANA SUMMIT BF G� -9LFC' PROJECT F y SI TE ti Y w w U w rj � v r w Li J mQ 10 HIGHLAND AVE. tea' COUNTY OF SAN BERNARDINO VICINITY MAP NTS fll 1 BEECH AVE LEGEND: ESMT EASEMENT TC TOP OF CURB ELEVATION FS FINISHED SURFACE ELEVATION FL FLOW LINE ELEVATION FG FINISHED GROUND ELEVATION — - - — DAYLIGHT LINE ATTN: CARLOS NAVARRO TRACT BOUNDARY / PROPERTY LINE C N 0 PAD ELEVATION OWNER/DEVELOPER HIGH POINT ELEVATION 0'0 DIRECTION OF FLOW AND GRADE RATE 2280 WARDLOW CIRCLE SUITE 150 EXISTING SPOT ELEVATION R---- RIDGE LINE GB GRADE BREAK TW TOP OF WALL TF TOP OF FOOTING TRW TOP OF RETAINING WALL YY INDICATES PROPOSED SLOPE ® INDICATES RETAINING WALL 80 PROPOSED FINISHED GRADE CONTOUR CONTACT: JACK HAYES EXISTING CONTOUR NTS NOT TO SCALE PACIFIC BELL TRACT BOUNDARY L.L. LEVEL LINE TYP TYPICAL LP LOW POINT PUE PUBLIC UTILITY EASEMENT TS TOP OF STEP TW TOP OF WALL TF TOP OF FOOTING FF FINISH FLOOR PE PAD ELEVATION TG TOP OF GRATE UTILITY NOTES ELECTRICITY SEWER SOUTHERN CALIFORNIA EDISON CO. CITY OF FONTANA 300 N. PEPPER AVE. 8353 SIERRA AVENUE RIALTO, CA 92376 P.O. BOX 518 UNDERGROUND: (909) 357-6233 FONTANA, CA 92335 TRANSMISSIONS: (909) 875-5100 (909) 350-6632 PIPELINES: (213) 657-1233 ATTN: CARLOS NAVARRO DISTRIBUTION: (909) 357-6233 C N 0 SAS OWNER/DEVELOPER SOUTHERN CALIFORNIA GAS CENTEX HOMES/LENNAR COMPANY 2280 WARDLOW CIRCLE SUITE 150 P.O. BOX 3003, SC8031 CORONA, CA 92880 REDLANDS, CA 92373-0306 (909) 279-4000 ATTN: RICKEY REYES CONTACT: LANCE CLEMENTS (909) 335-7508 Cl CN (909) 335 7527 (FAX) COMCAST CABLEVISION EMERGENCIES: (800) 427-2200 1205 DUPONT AVE 08-26-02 ONTARIO, CA 91761 WATER (909) 390-4738 SAN GABRIEL VALLEY WATER CO. CONTACT: JACK HAYES P.O. BOX 2010 o EL MONTE, CA. 91734-2010 PACIFIC BELL 626 448-6183, EXT. 306 3939 EAST CORONADO ST 626 582-1575 FAX SECOND FLOOR ATTN: JACK SWE ANAHEIM, CA. 92807 WATER(714) 666-5500 3 FONTANA WATER COMPANY (714) 666-8806 FAX a� AM: SIGNAIGO LARRY 0- A I IN: AL KROHN 8440 NUEVO AVENUE FONTANA, CA 92235 822-2201 FAX:) (909) 823-5046 • •• .1 SUMMIT HEIGHTS 11 PRECISE GRADNG TITLE SHEET • , co N O I s O a_ C N 0 o> I� 0 ALE: o 0 AS NOTED Cl CN o TE. 08-26-02 "G NO.: o '31 T 4