HomeMy WebLinkAbout3362-2GENERAL NOTES:
1. ALL WORK, MATERIALS AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING SHALL CONFORM
TO THESE PLANS, THE CURRENT STANDARD PLANS AND SPECIFICATIONS FOR THE CITY OF FONTANA,
AND THE 2002 STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA DEPARTMENT
OF TRANSPORTATION.
2. PAVEMENT MARKINGS & LEGENDS SHALL CONFORM TO THE CITY OF FONTANA STANDARD STENCILS.
3. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE THERMOPLASTIC.
4, TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS
SIGN SPECIFICATIONS SHEETS, SIGN CODES SHOWN HEREON ARE TO CONFORM TO CALTRANS
SPECIFICATION SHEET CODES, TRAFFIC SIGN SIZE SHALL BE STANDARD UNLESS OTHERWISE
SHOWN ON THE PLANS.
DET 12
—�2 R26(S)
1 DET "B"
1 DET "A" "NO TRK PKG"
3 R28(S)
2 R26(S)
1 DET "A"
1 DET 32
GENERAL NOTES(CONT.),:
5. ALL SIGNS SHALL BE MOUNTED ON A GALVANIZED STEEL POST, UNLESS OTHERWISE SHOWN,
PER CITY STANDARD DETAIL 139.
6. IT SHALL DE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS
OR OTHER TRAFFIC CONTROL AT ALL TIMES (SEE SPECIAL PROVISIONS).
7, CONTROL POINTS OR "CAT—TRACKING" TO BE APPROVED BY THE ENGINEER 24 HOURS PRIOR
TO PAVEMENT STRIPING APPLICATION.
8. CROSSWALKS SHALL HAVE 10' BETWEEN CENTERLINES OF 12" STRIPES PER CITY OF FONTANA
DETAIL 1006.
9. CONFLICTING STRIPING/MARKINGS TO BE REMOVED BY WET SAND BLASTING METHOD.
—I u D ET 12 L 1 l ---J
DET "A" 1
"NO TRKR28(S) 3
R26(S) 8c 2
POST Rs r, (S) 2
3 R28(S)RT
NO TRK PKG"
3
2 W47
R28(S)
+
m-
2 R26(S)
SES T' PACIFIC
.m
DET 12
—�2 R26(S)
1 DET "B"
1 DET "A" "NO TRK PKG"
3 R28(S)
2 R26(S)
1 DET "A"
1 DET 32
GENERAL NOTES(CONT.),:
5. ALL SIGNS SHALL BE MOUNTED ON A GALVANIZED STEEL POST, UNLESS OTHERWISE SHOWN,
PER CITY STANDARD DETAIL 139.
6. IT SHALL DE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS
OR OTHER TRAFFIC CONTROL AT ALL TIMES (SEE SPECIAL PROVISIONS).
7, CONTROL POINTS OR "CAT—TRACKING" TO BE APPROVED BY THE ENGINEER 24 HOURS PRIOR
TO PAVEMENT STRIPING APPLICATION.
8. CROSSWALKS SHALL HAVE 10' BETWEEN CENTERLINES OF 12" STRIPES PER CITY OF FONTANA
DETAIL 1006.
9. CONFLICTING STRIPING/MARKINGS TO BE REMOVED BY WET SAND BLASTING METHOD.
—I u D ET 12 L 1 l ---J
DET "A" 1
"NO TRKR28(S) 3
R26(S) 8c 2
POST Rs r, (S) 2
TYPE IV
—�T CURB OR
15'1 { I �1 f EDGE OF TRAVELED WAY
3 R28(S)RT
NO TRK PKG"
3
2 W47
R28(S)
+
2 R26(S)
SES T' PACIFIC
"A"
1 DET
SIGNING STRIPING
6
26' 26'
1 DET 38
R�cBPQST LT 3
R28(S)RT
1 DET 12
Res s
()
1 TYPE IV
R1 ry
300mm (12")
LU 0
DET "A" 1
0
Loi�
1 TYPE IV
m
`A
82(45)
`Z
R26(S)
WHITE STRIPE
UjUj
^w
i() !
U?
ALL==
^^'
<— 250'
LU
O
04-�_... �e
C -
._..._.....
00
0
TYP,
;—
_ — — — —
— —
'
Lo
— — --------- — —
R28(S)LT
3 m L/2
TYPE IV® POST
R1
„ DET 12 1
1 45
99APT
26 26
DET 22 1
DET 1J
`
1 DET "A"
_C14
"NO TRK PKG"
Uj
DIRECTION
R28(S)RT
`—
4-
SES SHEET 4 FOR PACIFIC
3 R28(S)LT
2 R26(S)
SIGNINGI
OF TRAVEL
Uj
TYPE IV
—�T CURB OR
15'1 { I �1 f EDGE OF TRAVELED WAY
100mm (4")
WHITE STRIPE
TYPE G
MARKER
6
TYP.
DIRECTION 2ND MARKER NOT USED
AT LIMIT LINES OR X—WALKS
OF TRAVEL
40 20 0 40 80 120
49'
DETAIL "A"
N.T.S.
Marlay Striping bt Mulberry and Etiwanda Sheet.dwg 1
N
w
+
I
300mm (12")
LU 0
-LoI
Loi�
`A
`Z
WHITE STRIPE
UjUj
^w
n
LU
— iso
_ — — — —
— —
— _�� — — — — — — 0—
—r
— — --------- — —
`
`mm
_C14
Uj
DIRECTION
`—
4-
`'
OF TRAVEL
Uj
N
N
R26(S)
`
200'
200'
DET 12
1
DETAIL „B y'
N.T.S.
100mm (4")
WHITE STRIPE
TYPE G
MARKER
6
TYP.
DIRECTION 2ND MARKER NOT USED
AT LIMIT LINES OR X—WALKS
OF TRAVEL
40 20 0 40 80 120
49'
DETAIL "A"
N.T.S.
Marlay Striping bt Mulberry and Etiwanda Sheet.dwg 1