Loading...
HomeMy WebLinkAbout3305-1c � J OF FONT f AN.A, CALIFORNIA Land CompanA r ffllilM), ,iii;_ " �/FN Mr/�M,*) LmLocw Ininnrl ('-A City Required Notes: insDec_tjQp,� 1. It is the landscape Contractor's responsibility to contact the Engineering Division's Landscape inspector 48 hours Prior to desired inspection of an item at (909)350-6633. 2. Prior to release of utilities or, maintenance period commencement followinginspections are required. Pre construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test ® 150 p.s.i. for a three (3) hour period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting Plant materials prior to planting. Planting, including street trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. 3. The- Owner's representative and landscape contractor shall be present at each inspection. Maitainente Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to. - 1. o:1. cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn _height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants. as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain food working condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR'THEREAFTER : AS-BT.lT.LT NOTES _ SIF,%RA AVENUE (WEST) CFD No 12 AS—BUILT PLANS HAVE BEEN DRAFTED BY SITESCAPES BASED ON FIELD INFORMATION FROM TERRA -CAL PROVIDED TO SITESCAPES VIA WEBB AND ASSOCIATES. (FIELD PLANS DATED 11/04/1999.) SITESCAPES DOES NOT TAKE RESPONSIBILITY FOR ACCURATE ► OR OVIlVI MON OF FIELD ITEMS PROVIDED. AS -BUILT PLANS DRAFTED BY SITESCAPES 02/06/2003 LANDSCAPE CONTRACTOR: TERRA—CAL CONTACT: GREGG STRUMPF PHONE: (626) 960-3694 A P E 5- ;000 78 5 Landscape 19762 MacArthur Blvd. (949) 644937091' Suite 130 FAX 476-1432 Architecture Irvine, CA 92612 & Planning Richard Polhamus, License # 2782 e ANK r r