HomeMy WebLinkAbout3305-1c � J
OF FONT f AN.A, CALIFORNIA
Land CompanA
r ffllilM),
,iii;_ " �/FN Mr/�M,*)
LmLocw
Ininnrl ('-A
City Required Notes:
insDec_tjQp,�
1. It is the landscape Contractor's responsibility to contact the
Engineering Division's Landscape inspector
48 hours Prior to desired inspection of an item at (909)350-6633.
2. Prior to release of utilities or, maintenance period commencement
followinginspections are required.
Pre construction meeting
Inspection of irrigation system in open trench condition (prior to backfill).
Mainline pressure test ® 150 p.s.i. for a three (3) hour period.
Irrigation coverage tests including initial and final tests.
Finish grade prior to planting
Plant materials prior to planting.
Planting, including street trees. Contact the Parks Planning and Landscape
Development section Engineering Division, for species and final locations.
3. The- Owner's representative and landscape contractor shall be present at each inspection.
Maitainente Guidelines
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but
not be limited to. -
1.
o:1. cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn _height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants. as necessary to control and direct growth
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for
proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain food working condition.
8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering division Landscape Inspection Staff. The
landscape shall be maintained in accordance with these landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE
QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR'THEREAFTER
:
AS-BT.lT.LT NOTES _
SIF,%RA AVENUE (WEST) CFD No 12
AS—BUILT PLANS HAVE BEEN DRAFTED BY SITESCAPES
BASED ON FIELD INFORMATION FROM TERRA -CAL
PROVIDED TO SITESCAPES VIA WEBB AND ASSOCIATES.
(FIELD PLANS DATED 11/04/1999.)
SITESCAPES DOES NOT TAKE RESPONSIBILITY FOR ACCURATE
► OR OVIlVI MON OF FIELD ITEMS PROVIDED.
AS -BUILT PLANS DRAFTED BY SITESCAPES 02/06/2003
LANDSCAPE CONTRACTOR: TERRA—CAL
CONTACT: GREGG STRUMPF
PHONE: (626) 960-3694
A P E 5-
;000
78 5 Landscape 19762 MacArthur Blvd. (949) 644937091'
Suite 130 FAX 476-1432
Architecture
Irvine, CA 92612
& Planning Richard Polhamus, License # 2782
e
ANK
r r