Loading...
HomeMy WebLinkAbout3301-1E E L U B . Hous DR V H -'a - r S'i'erra 5 1 -F E 5 G A P E, 1156 N. ® i I I I Mountain 91785 Landscape 19762 Mac Arthur Sivd. (949) 644-9370 Architecture Suite 130 FAX 476-1432 (9tj9) 9856iiiRU9 Irvine, CA 92672 & Planning Richard Polharnus, License # 2782 06;4 a� } Aw. GENERAL NVICINITY MASHEET INDEX SUBMITTALS L- I PLANTING DETAILS, LEGEND co AND NOTES City Required `®"es` �,� RIVERSIDE AVENUE r Inspections: L-2l�!LA T : 1. It is the Landscape Contractor's responsibility to contact the Engineering Division's ��� W TREES p �D ®T T1C®�D c Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350- > (TREES & i� IJ ND RS) 6633, CITY OF CITY 2. Prior to release of utilities or maintenance g eriod commencement the followinFONTANA —3 PLANTGPLAN P b DUNCAN CYN, RD. ❑F UJ inspections are required: W RIALTO ZQ� Pre construction Meeting > w (TREES & GROUNDCOVERS) Inspection of irrigation system in open trench condition (prior to back fill). °C SUMMIT AVENUE APPROVALS Mainline Pressure test @ 150 P.S.I. for a three (3) hour continuous period./f CURTIS PROJECT L—` -r PLAN 11 \ PLAN " r�T Irrigation coverage tests including initial and final tests. W AVE.SITE (SHRUBS p_ VINES) _ S U17 & Finish grade prior to planting. - HIGHLAND AVENUE LJ � Plant materials prior to planting and soil preparation. J ALNUT AVE. L-5 PLANTING LAN Planting, including street trees. Contact the Parks Planning and Landscape (SHRUBS OG VINES) Development Section, Engineering Division, for species and final locations. 0 Compliance with approved plans. LL Final Inspection. 3& 1 T E LOCATION LIRRIGATIONDETAILS, LEGENDS LU 3. The Owner's representative and landscape contractor shall be present at each inspection. AND NOTES - 4 , Maintenance Guidelines: L-7 IRRIG ATION DETAILS ' Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall , include but not be limited to: L-81. GATILAN Cultivation of planted beds at intervals not to exceed ten (10) days. . . . 2. Regularmowing to maintain lawn height not to exceed two (2) inches (will vary" with species). L= 9 GA N LAN E V 13 1 0 U"k NS 3. Regular pruning of plants as necessary to control and direct growth. fVW bam 4.- - Scheduled maintenance o -(.irrigation. controller to assure proper application rate of L— 1 ® I GATIONMAINLINPLAN � � � water necessary for proper plant growth. Drip irrigation may require specialized _ A landscape maintenance care. _Lun AISLO-3 5. Immediate replacement of irrigation materials as needed to maintain good working condition. L- I I S E C I F lu" AT N S 6. Fertilization on a regular schedule as recommended by the manufacturer to provide Q a ' proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. _ Q 9. Stakes, guys and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches.A Ilk 10. Upon completion of three (3) month (90) day contract maintenance period, anSHCC I mt: y inspection shall be made by the Community Development Department Engineering Q Q Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the Ci and schedule the P �' maintenance inspection. SHEET 1 �o�pNDS�Apf � N ap )6 P 0Z qp t R.O.W. @ BOTH �� ''v ti S SIDES009 CITY` OF FONTANAJil ���� � � 2782 s �, DATE{ lF OF CA��6/8/99 E APPRQVEB BY,