Loading...
HomeMy WebLinkAbout3291-43/4" —III,;,III11111►1;,IIf..,cCl� &ATE VALVE 4" DIAMETER STEEL POST CAP SECURE TO PIPE. 2, TIPPING BUCKET BRACKET 1/20B DIA. FLEXIBLE ALL WEATHER ELECTRICAL CONDUIT, CONNECT BOX TO BOX. TIPPING BUCKET RAIN GAUGE, INSTALL PER MANUFACTURERS RECOMMENDATIONS, 4" DIA GALVANIZED STEEL PIPE POST. 6 WEATHER PROOF ELECTRICAL -J-BOX DRILL I" DIA HOLE THROUGH PIPE AND MOUNT BOX TO PIPE. iP . OF FOOTING AWAY li FINISH SURFACE. NATURAL COMPACTED SOIL. 1" DIA ELECTRICAL PVC RIDGED CONDUIT FROM PIPE TO CONTROLLER. PROPOSED CONTROLLER ENCLOSURE STAINLESS STEEL HOSE CLAMPS (2)EACH NOTE: ACID WASH STEEL PIPE POST, STEEL POST CAP AND ELECTRICAL "J" BOX THOROUGHLY. PAINT WITH 1 COAT RUSTOLEUM PRIMER AND 2 COATS OF FOREST GREEN EXTERIOR HIGH GLOSS PAINT. .. . IN SI—i''UT—OFF DEVICE CIONT. BOX TO BE PLACED AT RIGHT ANGLE TO HARDSCAPE EDGE w/ VALVE # ETCHED IN LID 12"X1 B" PLASTIC BOX AND COVER WITH LOCK TOP CURL TYPE EXPANSION LOOP (MIN.24") WATERPROOF WIRE CONNECTION CHRISTY'S LD TAG (STANDARD) SECURE TO SOLENOID PIGTAIL FINISH GRADE. /A,P IMAM " PIA, X 12" P. BOTTOMLE-55-L. PqrN PAR, Y" COVER, DILL NITH PEA CiRAVEL i� i/"VIA X IO` DRI ENN > 1 ROD PER ARTIOLE 250-61 OF 111NEC J20/240 pip 12 CA PANEL EINI E ,%+;%Ii i/•JJ� :Tj 4k(L %dda A q ELECTRICAL 7 ON DRMIN'6/5 B, ELECTRIC C"ONTROLLER WIRE /r PRESSURE REGULATOR IF ME"WON aOa, REQUIRED. SET AS SHOWN ON SITE DRAWING r D REDUCE PRESSURE WIRE M V'2m BACKFLOW PREVENTER STRAINER 40 — B BRASS NIPPLE MESH MO EL VALVES ARE TO BE INSTALLED IN SHRUB AREAS UNLESS OTHERWISE NOTED (4 PLACES) BRASS ELBOW THAN ONE VALVE IS LOCATED IN THE SAME AREA. PROVIDE A SPACE A MIN. OF 3 FT. APART. 3. BRASS ELBOW HARDSCAPE ON ALL THREADED FITTINGS, 4. ONE VALVE PER VALVE BOX BRASS UNION REMOTE E RELIEF PORT' BRASS PIPE BRASS BALL VALVE �, LOOSE Kms, 1 ABB BRASS BALL VALVE HOSE BIB BRASS PIPE LOCK BOX "YY PB 4 REBAR 1 4✓ 4fIIEi� sljB — Paa b FOOTING FOUNDATION 1= `" SOLENOID y . P-1 ss PVC LINE PIPE �- PRESSURE CONC. STABILIZER PRESSURE NON -PRESSURE UPPLY LINE (TRUST BLOCK) FRONT SUPPLI� LINE LINE PITTINf' (INTAKE) (DISCHARGE) "—UNION CONNECTION . PEA GRAVEL (MIN.3 CU. FT.) PVC LINE PIPE PVC SCH, 40 MALE ADAPTOR PVC ELBOW (TYP. 2 PLACES) PVC LINE PIPE COMMON WIRE /r IANWCME MCMTZVr= I;nUL �M , PVC SUPPLY LINE FITTINGS(SXSXS) ME"WON aOa, r D CONTROL WIRE M V'2m CHECKED # NOTES: B 1. VALVES ARE TO BE INSTALLED IN SHRUB AREAS UNLESS OTHERWISE NOTED 2. WHEN MORE THAN ONE VALVE IS LOCATED IN THE SAME AREA. PROVIDE A SPACE A MIN. OF 3 FT. APART. 3. USE TEFLON TAPE ON ALL THREADED FITTINGS, 4. ONE VALVE PER VALVE BOX REMOTE E CLEAN BACK FILL SATURATE AND COMPACT TO 90 HARDS ING m'. NATIVE BACKFILL 2" MINUS F n NON PRESSURE LATERAL LINE W/SLEEVE a ) a PRESSURE SUPPLY LINE W/SUEEVE CONTROL WIRE SLEEVE SAND BACK FILL 2" MIN 6. MIN Nomi. INSTALL CONTROL FIRE SLEEVE ADJACENT TO THE PRESSURE SUPPLY LINE, SIZE PER SPEC. ALL SLEEVES TO BE SCH. 40 PVC AND TO BE 2X THE DIAMETER OF THE LINE TO BE SLEEVED, * INCREASE THIS DISTANCE TO 36" W14EN SLE NG UNDER ROADWAYS AND COMMERCIAL TRAFFIC WAYS WHEN INSTRUCTED BY INSPECTOR, SLEEVES SHALL BE EXTENDED BEYOND HARDSCAPE TO POINTS AS REQUESTED BY INSPECTOR IF SLEEVES ARE TO BE USED AT A LATER DATE, CONTRACTOR SHALL TAPE ENDS AND PROVIDE A VERTICAL MARK AT ENDS OF SLEEVING VISIBLE AT GROUND LEVEL. w I FINISHED GRADE 6" MIN FROM HARDSCAPES VON PRESSURE LATERAL LINE LATERAL LINE PRESSURE SUPPLY LINE CO LL FIRES BACKFILL Am 3/4" GRAVEL . a - r 1 AV - PLAN 12' NOTE BACKFLOW ENCLOSURE,LE MEUR OR EQUAL 24¢8X60"X36" HIGH HINGED AT ONE END SECURE TO 60!X6" FOOTING W/4" J BOLTS END (EQUIPMENT TO BE CENTERED INSIDE HOUSING) LARGER ON ALL LINES, NO y D THIS WILL BE PERMITTED IN THE INITIAL BACKFILL MEASURED SIZE. INCH IN OF PIPE. THE REMAIND y TRENCHOF BEWITHSCREENED ROCK ALL BACK FILL IS TO BE SATURATED AND COMPACTED TO 90% INSTALL ALL PVC PIPE WITH LABEL UP. SNAKE ALL PIPE IN TRENCH. BUNDLE DTAPE ALL +r D • PRESSURE SUPPLY LINE D LOOP 90 DEGREE C14ANGES IN DIRECTION. PRESSURE:BE SSHALL BE P.V,C. MALLER D; 0 CONTRACTOR SHALL PROVIDE OR D D INSTALLATIONMAINLINE IS UNDER ASPHALT OR CONCRETE. PROVIDECONTRACTOR $HALL r OVER PIPE FOUNTAINSERVING A DRINKINGOR PRESSURE MAINLINE DLARGER. PIPE TRENCHING_—_____T_ REV. REVISION DESCRIPTION DATE EN R7 CITY DATE 3RASS UNION RAS BALL JALVE 4 REBAR 10- VALVE BOX MARKED W/ 2- LETTERS "L ERS READING Q.C. W/ LOCKING BOLT LID FINISH GRADE, UICK COUPLER VALVE 12" MIN, FROM HARDSCAPE MATERIALS IL%qtkvdudl ml Il lte; mul 2 ALL PqIT°H TREE AND SHRUB PLANTIN, yy w COMMENCE WITHIN TWO YEARS OF THE DATE HEREON AND CARRIED FORTH IN A DILIGI.NT MANNER, THE CITY NGINEER MAY RMUIRE RDASIONS TO THE PLANS CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. CITY OF N.'A LIFORNIA « IANWCME MCMTZVr= I;nUL �M , CADD ME"WON aOa, r D r., M V'2m CHECKED # B CITY OF N.'A LIFORNIA