Loading...
HomeMy WebLinkAbout3258-8x x x X X n U o W \ to Lf) o- r-) w >- V) m — w w 12� w > 11— w Q 0� 0 W N N Q 0 0 � w 0- cn om m w �o Qw o Jz w �( U— U J cn w Qw = UD U w z w 0 z cn C) n-, z Q w U 11-- 1--- U 1— w 0 � v 0 n Not 'I 0C:) W F -- Q V) Lv Lv w W 0 W z H U I-- 7- ,� I-- L,J L,J SCALE 1:500 ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE SHOWN NOTE: THIS PLAN ACCURATE FOR ELECTRICAL WORK ONLY SEE SHEET 3 FOR LEGEND FOR REDUCED PLANS ORIGINAL 0 20 40 60 80 SCALE IS IN MILLIMETERS I I I I I 1 1 W z H U Q USERNAME=>$USER DGN FILE => $REQUEST tris CONSTRUCTION NOTES DIST COUNTY ROUTE KILOMETER POST SHEET TOTAL TOTAL PROJECT No SHEETS 08 SBd 10 16.22 8 43 Q GESS/0"v REGISTERED CIVIL ENGII`JEER Oo,�-� E CgR�S Fyc� C-)o� , 08/09/02 w�,, P S APPRhV,,AL DATENo. C57886 y_ * Exp. 06/30/06 �l CIVIL p� City of Fontana F OF rNv\ SPONSORING AGENCY Meyer, Mohaddes Associates, h7c. An /teris Company 1515 S. MANCHESTER AVE. ANAHEIM, CA 92802 The State of California or its officers or agents shall not be responsible for the accuracy or completeness of electronic copies of this plan sheet. (THIS SHEET ONLY) 1❑ FURNISH AND INSTALL SIX (6) 1 %2" (38 mm) HIGH DENSITY POLYETHYLENE (HDPE) CONDUITS BY DIRECTIONAL DRILL UNDER PAVEMENT OR SIDEWALK, OR BY TRENCH IN SOIL. SEE SHEET 33, DETAIL A UNLESS OTHERWISE SPECIFIED. FURNISH AND INSTALL LOCKING SPLICE VAULT (P48) WITH SPLIT LID. SPLICE VAULT COVER TO BE INSCRIBED "TRAFFIC". SEE SPLICE VAULT DETAIL ON SHEET 32. [-3]FURNISH AND INSTALL ONE (1) 96—STRAND SMFO CABLE IN ONE (1) OF THE HDPE CONDUITS. WHERE CABLE PASSES THROUGH SPLICE VAULT, COIL 50 FEET (15 m) OF 96 SMFO CABLE IN EACH VAULT. SEE SPECIAL PROVISIONS FOR DETAILS. �4 FURNISH AND INSTALL 12—STRAND SMFO CABLE IN EXISTING COMMUNICATION CONDUIT. ❑5 FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. FURNISH AND INSTALL 12—STRAND SMFO CABLE IN NEW CONDUIT. SEE SHEET 33, DETAIL B. [jj FURNISH AND INSTALL NEW PATCH PANEL IN EXISTING CALTRANS CABINET. TERMINATE ALL STRANDS FROM EACH 12—SMFO CABLE ON PANEL AND COMPLETE CROSS CONNECTS PER FIBER ASSIGNMENT TABLE ON SHEET 38. 21 COIL MINIMUM OF 16—FEET (4.9 m) OF 12—STRAND SMFO CABLE IN EXISTING PULL BOX. FUSION SPLICE FOUR (4) STRANDS OF 96—STRAND SMFO CABLE TO THE APPROPRIATE STRANDS OF 12—STRAND SMFO CABLE USING SPLICE ENCLOSURE PER FIBER ASSIGNMENT TABLE ON SHEET 38. COIL MINIMUM OF 16—FEET (4.9 m) OF 12—STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT. 33 FURNISH AND INSTALL TWO (2) 4" (102 mm) GRS CONDUIT BY TRENCH IN PAVEMENT UP TO BRIDGE ABUTMENT. SEE SHEET 33, DETAIL D. INSTALL GRS CONDUIT THROUGH BRIDGE ACCESS HOLE AND ATTACH GRS CONDUIT TO BOTTOM OF BRIDGE USING GALVANIZED HANGERS SPACED AT 8—FOOT INCREMENTS. SEE SHEET 33, DETAIL E. 34 FURNISH AND INSTALL THREE (3) 1%2" (38 mm) HDPE CONDUITS IN EACH 4" (102 mm) CONDUIT. F4]8 FURNISH AND INSTALL TWO (2) 4" PVC CONDUITS BY TRENCH METHOD IN PAVEMENT UP TO BRIDGE ABUTMENT. SEE SHEET 33, DETAIL D. CONTRACTOR SHALL POT HOLE PAVEMENT TO LOCATE UTILITY DUCT. INSTALL CONDUIT IN EXISTING UTILITY DUCT IN BRIDGE. SEE SHEET 35, DETAIL A. F9] FURNISH AND INSTALL PVC/STEEL CONDUIT ADAPTER. SEE SHEET 35, DETAIL B. 50 COIL AN ADDITIONAL 100—FEET (30.5 m) OF 96—SMFO CABLE. Lef .1s • �.' �= CU 000000 EA 08-924740 o w o Q Ln J 0