HomeMy WebLinkAbout3258-4CONSTRUCTION NOTES (FOR SHEETS 4 THROUGH 21 ONLY) 25 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT FUTURE VIDEO DETECTION SYSTEM BY OTHERS. COMPLETE CONNECTION TO WIC. ❑1 FURNISH AND INSTALL SIX (6) 1 %2" (38 mm) HIGH DENSITY POLYETHYLENE (HDPE) CONDUITS BY DIRECTIONAL DRILL UNDER PAVEMENT OR SIDEWALK, OR BY TRENCH IN SOIL. SEE SHEET 33, DETAIL A kq INSTALL CONDUIT TO A MINIMUM DEPTH OF 36 -INCHES FROM TOP OF CONDUIT. FURNISH AND INSTALL UNLESS OTHERWISE SPECIFIED. ONE (1) 96 -STRAND SMFO CABLE IN ONE (1) OF THE HDPE CONDUITS. WHERE CABLE PASSES THROUGH SPLICE VAULT, COIL 150 FEET (46 m) OF 96 SMFO CABLE IN EACH VAULT. SEE SPECIAL [-2] FURNISH AND INSTALL LOCKING SPLICE VAULT (P48) WITH SPLIT LID. SPLICE VAULT COVER TO BE PROVISIONS FOR DETAILS. INSCRIBED "TRAFFIC". SEE SPLICE VAULT DETAIL ON SHEET 32. 27 FURNISH AND INSTALL TWO (2) 96 -STRAND SMFO CABLE IN ONE OF THE EXISTING HDPE CONDUITS. [3]FURNISH AND INSTALL ONE (1) 96 -STRAND SMFO CABLE IN ONE (1) OF THE HDPE CONDUITS. SEE SPECIAL PROVISIONS FOR DETAILS. EXTEND 96 -STRAND SMFO CABLE 25 -FEET INTO EACH VAULT TO PROVIDE CABLE SLACK IN VAULT. WHERE CABLE PASSES THROUGH SPLICE VAULT, COIL 50 FEET (15 m) OF 96 SMFO CABLE IN EACH VAULT. SEE SPECIAL PROVISIONS FOR DETAILS. FUSION SPLICE FOUR (4) STRANDS OF 96 -STRAND SMFO CABLE TO THE APPROPRIATE STRANDS OF 12 -STRAND SMFO CABLE USING SPLICE ENCLOSURE PER FIBER ASSIGNMENT TABLE ON SHEET 38. ® FURNISH AND INSTALL 12 -STRAND SMFO CABLE IN EXISTING COMMUNICATION CONDUIT. COIL MINIMUM OF 16 -FEET (4.9 m) OF 12 -STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT. ❑5 FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. FURNISH AND INSTALL 12 -STRAND SMFO 29 FURNISH AND INSTALL TWO (2) 12 -STRAND SMFO CABLES IN EXISTING CONDUIT. CABLE IN NEW CONDUIT. SEE SHEET 33, DETAIL B. FUSION SPLICE FOUR (4) STRANDS OF 12-SMFO TO THE APPROPRIATE STRANDS OF THE EXISTING © FURNISH AND INSTALL NEW PULL BOX N0. 6 WITH EXTENSION. COIL MINIMUM OF 16 -FEET (4.9 m) OF CALTRANS FIBER OPTIC CABLE USING SPLICE ENCLOSURE AS DIRECTED BY CALTRANS. COIL MINIMUM 12 -STRAND SMFO CABLE FOR SLACK IN PULL BOX. OF 16 -FEET (4.9 m) OF 12 -STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT. F7]REMOVE EXISTING PULL BOX. FURNISH AND INSTALL NEW PULL BOX NO. 6 WITH EXTENSION. COIL 31 FURNISH AND INSTALL 10" (254 mm) STEEL CASING UNDER SANBAG ROW BY DIRECTIONAL DRILL, AND MINIMUM OF 16 -FEET (4.9 m) OF 12 -STRAND SMFO CABLE FOR SLACK IN PULL BOX. SIX (6) 1 %2" (38 mm) HDPE CONDUITS IN STEEL CASING. SEE SHEET 34, DETAIL B. ® INSTALL CONDUIT INTO EXISTING PULL BOX. COIL MINIMUM OF 16 -FEET (4.9 m) OF 12 -STRAND SMFO CABLE FOR SLACK IN PULL BOX. 32 ❑ EXISTING CALTRANS TYPE 332 CABINET. ALL EQUIPMENT AT THIS LOCATION A N SH LL BE RACK MOUNTED. CONTRACTOR SHALL COORDINATE INSTALLATION WITH CALTRANS AND ENGINEER. [9]INSTALL CONDUIT INTO EXISTING SPLICE VAULT OR PULL BOX. 3 0 FURNISH AND INSTALL TWO 2 4" 102 m ( ) ( m) GRS CONDUIT BY TRENCH IN PAVEMENT UP TO BRIDGE flO FURNISH AND INSTALL WALL INTERCONNECT CENTER (WIC) IN EXISTING TRAFFIC CABINET WITH LINE ABUTMENT. SEE SHEET 33, DETAIL D. INSTALL GRS CONDUIT THROUGH BRIDGE ACCESS HOLE AND CONDITIONER/SURGE SUPPRESSOR, IF REQUIRED AS DIRECTED BY THE ENGINEER. INSTALL AND ATTACH GRS CONDUIT TO BOTTOM OF BRIDGE USING GALVANIZED HANGERS SPACED AT 8 -FOOT TERMINATE 12 -STRAND SMFO CABLE USING WIC IN EXISTING CABINET. INCREMENTS. SEE SHEET 33, DETAIL E. Ffl] FURNISH AND INSTALL FIBER OPTIC TERMINAL CABINET TO OUTSIDE OF EXISTING TRAFFIC CABINET. ® FURNISH AND INSTALL THREE (3) 1Y2" (38 mm) HDPE CONDUITS IN EACH 4" (102 mm) CONDUIT. SEE SHEET 40 AND SPECIAL PROVISIONS FOR DETAILS. FURNISH AND INSTALL WIC IN NEW TERMINAL 35 TRAFFIC SIGNAL CONTROLLER TO BE ABANDONED BY OTHERS. CABINET WITH LINE CONDITIONER/SURGE SUPPRESSOR, IF REQUIRED AS DIRECTED BY THE ENGINEER. INSTALL AND TERMINATE 12 -STRAND SMFO CABLE USING WIC IN NEW TERMINAL CABINET. MODIFY n,36 COIL AN ADDITIONAL 100 -FEET OF 96 -STRAND SMFO CABLE AND PROTECT/CAP END OF THE CABLE. EXISTING TRAFFIC CABINET TO PROVIDE 3 -INCH (76 mm) ACCESS HOLE FROM TERMINAL CABINET INTO EXISTING TRAFFIC CABINET. 37 FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. SEE SHEET 33, DETAIL B. 38 FURNISH AND INSTALL 10" (254 mm) STEEL CASING BY DIRECTIONAL DRILL UNDER TRACKS, AND SIX 12 REMOVE DETECTOR INTERFACE PANEL IN EXISTING TRAFFIC CABINET TO ACCOMMODATE WIC AS Y2" DIRECTED BY ENGINEER. (6) 1 (38 mm) HDPE CONDUITS IN CASING. SEE SHEET 34, DETAIL A. fl,3 FUSION SPLICE FIVE (5) STRANDS OF 96 -STRAND SMFO CABLE TO THE APPROPRIATE STRANDS OF 39 REMOVE EXISTING PULL BOX. FURNISH AND INSTALL NEW PULL BOX NO. 5. 12 -STRAND SMFO CABLE USING SPLICE ENCLOSURE PER FIBER ASSIGNMENT TABLE ON SHEET 38. ® FURNISH AND INSTALL FIBER OPTIC TRANSCEIVER TO SUPPORT FUTURE CCTV CAMERA BY OTHERS. COIL MINIMUM OF 16 -FEET (4.9 m) OF 12 -STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT. COMPLETE CONNECTION TO WIC. COORDINATE SPLICING WITH CCTV DETAILS AND AS NOTED IN FIBER ASSIGNMENT TABLE ON SHEET 38. 41 FURNISH AND INSTALL DOME CCTV CAMERA SYSTEM, ON EXISTING SIGNAL POLE USING CCTV 14 FUSION SPLICE SIX (6) STRANDS OF 96 -STRAND SMFO CABLE TO THE APPROPRIATE STRANDS OF MOUNTING EQUIPMENT. SEE SPECIAL PROVISIONS FOR DETAILS. FOR MOUNTING, USE 12 -STRAND SMFO CABLE USING SPLICE ENCLOSURE PER FIBER ASSIGNMENT SCHEDULE ON SHEET 38. MANUFACTURER'S MOUNTING STANDARDS. COIL MINIMUM OF 16 -FEET (4.9 m) OF 12 -STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT. 42 FURNSIH AND INSTALL FIBER OPTIC TRANSCEIVER (1) IN EXISTING CABINET WITH LINE COORDINATE SPLICING WITH CCTV DETAILS AND AS NOTED IN FIBER ASSIGNMENT TABLE ON SHEET 38. CONDITIONER/SURGE SUPPRESSOR (IF REQUIRED). COMPLETE CONNECTION TO WIC. 15 FURNISH AND INSTALL SIX (6) 1 1/2" HDPE CONDUITS IN EXISTING UTILITY DUCT. FURNISH AND fl,3 MAINTAIN EXISTING CONDUCTOR WIRE AND POWER FROM EXISTING CCTV DOME CAMERA. INSTALL ONE (1) #10 GREEN STRANDED IN EACH CONDUIT. CONTRACTOR SHALL POT -HOLE TO IDENTIFY LOCATION OF UTILITY DUCT. 44 FURNISH AND INSTALL AND TERMINATE CCTV CAMERA DATA CABLE AND COAX CABLE ON FIBER OPTIC TRANSCEIVER. [16] RELOCATE ALL CONDUCTOR WIRES TO ONE OF THE EXISTING CONDUITS. FURNISH AND INSTALL 45 FURNISH AND INSTALL 20 -AMP BREAKER IN EXISTING CABINET FOR CCTV CAMERA SERVICE. 12 -STRAND SMFO IN EXISTING CONDUIT THAT DOES NOT CONTAIN CONDUCTOR WIRES. COMPLETE CONNECTIONS IN SERVICE CABINET AND TRAFFIC CABINET TO PROVIDE SERVICE FOR CCTV 17 FURNISH AND INSTALL FIBER OPTIC MODEM TO SUPPORT TRAFFIC SIGNAL CONTROLLER. COMPLETE CAMERA. CONNECTION TO THE EXISTING TRAFFIC SIGNAL CONTROLLER AND WIC. 46 REMOVE AND SALVAGE EXISTING CCTV CAMERA AND WIRELESS COMMUNICATION EQUIPMENT, AND RETURN HARDWARE TO ENGINEER IN WORKING CONDITION. 18 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT VIDEO DETECTION SYSTEM. COMPLETE 47 FURNISH AND INSTALL NEW SERVICE CABINET PER CITY STANDARDS. FURNISH AND INSTALL NEW CONNECTION TO THE VIDEO DETECTION UNIT AND WIC. 20 -AMP BREAKER FOR CCTV CAMERA SERVICE AND 20 -AMP BREAKER FOR TRAFFIC SIGNAL 19 FURNISH AND INSTALL NEW PATCH PANEL IN EXISTING CALTRANS CABINET. TERMINATE ALL STRANDS CONTROLLER. CONTRACTOR TO COORDINATE WITH SCE FOR POWER TO NEW SERVICE CABINET. OF 12-SMFO CABLE ON PANEL AND COMPLETE CROSS CONNECTS TO CALTRANS FIBER PER FIBER FF8] FURNISH AND INSTALL TWO (2) 4" PVC CONDUITS BY TRENCH METHOD IN PAVEMENT UP TO BRIDGE ASSIGNMENT TABLE ON SHEET 38. ABUTMENT. SEE SHEET 33, DETAIL D. CONTRACTOR SHALL POT HOLE PAVEMENT TO LOCATE UTILITY DUCT. SAW CUT PAVEMENT PRIOR TO EXCAVATION. REPLACE STRUCTURAL SECTION IN KIND. 20 NEW FIBER OPTIC TERMINAL CABINET REPLACES EXISTING ENCLOSURE FOR PHONE SERVICE. INSTALL CONDUIT IN EXISTING UTILITY DUCT IN BRIDGE. SEE SHEET 35, DETAIL A. CONTRACTOR SHALL MAINTAIN PHONE SERVICE DURING CONSTRUCTION. 49 FURNISH AND INSTALL PVC/STEEL CONDUIT ADAPTER. SEE SHEET 35, DETAIL B. 21 COIL MINIMUM OF 16 OF 12 SMFO CABLE IN EXISTING PULL BOX. -FEET (4.9 m) -STRAND 50 COIL AN ADDITIONAL 100 -FEET (30.5 m) OF 96-SMFO CABLE. [Z2] REMOVE DEBRIS FROM PULL BOX AND REPLACE SLURRY BOTTOM PER SHEET 31. 23 F51] FURNISH AND INSTALL TWO (2) 4" PVC CONDUITS BY TRENCH METHOD IN PAVEMENT UP TO BRIDGE FURNISH AND INSTALL ONE (1) 2" (51 mm) GRS CONDUIT. INSTALL CONDUIT INTO FIBER OPTIC ABUTMENT. SEE SHEET 33, DETAIL D. CONTRACTOR SHALL POT HOLE PAVEMENT TO LOCATE UTILITY TERMINAL CABINET. FURNISH AND INSTALL 12 -STRAND SMFO CABLE IN NEW CONDUIT. SEE SHEET DUCT. SAW CUT PAVEMENT PRIOR TO EXCAVATION. REPLACE STRUCTURAL SECTION IN KIND. 33, DETAIL F. INSTALL CONDUIT IN EXISTING UTILITY DUCT IN BRIDGE. SEE SHEET 35, DETAIL C. [Z41 FURNISH AND INSTALL TWO (2) 96 -STRAND SMFO CABLE IN EXISTING CONDUIT (APPROXIMATELY 125 FEET). COIL MINIMUM OF 25 -FEET OF EACH 96 -STRAND CABLE IN EXISTING SPLICE VAULT. FURNISH AND INSTALL FDU IN TMC COMMUNICATION CLOSET. TERMINATE THE TWO (2) 96 -STRAND SMFO CABLE ON FDU.