Loading...
HomeMy WebLinkAbout3258-30CONDUCTOR TYPE FUNCTION RUN t 2 3 4 5 8 RG -59/U QUAD SHEILD COAX CCTV VIDEO 1 F9] 1 CONDUIT INTO EXISTING SPLICE VAULT OR PULL BOX. 1 1 3PR 24AWG CONDO OR CABLE CCTV DATA 1 CABINET 1 AS 1 1 110 CCTV POWER 2 2 DETECTOR INTERFACE PANEL IN EXISTING TRAFFIC CABINET TO ACCOMMODATE WIC AS DIRECTED BY ENGINEER. #12 CCTV SERVICE 2 12-SMFO DROP CABLE 1 1 CONDUIT SIZE E E E E 2" 2" NOTE: ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE SPECIFIED: (E) EXISTING CONSTRUCTION NOTES (THIS SHEET ONLY F5]FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. FURNISH AND 14 FUSION SPLICE SIX (6) STRANDS OF 96—STRAND SMFO CABLE TO THE APPROPRIATE STRANDS OF 12—STRAND SMFO CABLE USING SPLICE ENCLOSURE PER FIBER ASSIGNMENT SCHEDULE ON SHEET 38. COIL MINIMUM OF 16—FEET (4.9 m) OF 12—STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT. COORDINATE SPLICING WITH CCTV DETAILS AND AS NOTED IN FIBER ASSIGNMENT TABLE ON SHEET 38. 17 FURNISH AND INSTALL FIBER OPTIC MODEM TO SUPPORT TRAFFIC SIGNAL CONTROLLER. COMPLETE CONNECTION TO THE EXISTING TRAFFIC SIGNAL CONTROLLER AND WIC. 18 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT VIDEO DETECTION SYSTEM. COMPLETE CONNECTION TO THE VIDEO DETECTION UNIT AND WIC. 25 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT FUTURE VIDEO DETECTION SYSTEM BY OTHERS. COMPLETE CONNECTION TO WIC. 37 FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. SEE SHEET 33, DETAIL B. 41 FURNISH AND INSTALL DOME CCTV CAMERA SYSTEM, ON EXISTING SIGNAL POLE USING CCTV MOUNTING EQUIPMENT. SEE SPECIAL PROVISIONS FOR DETAILS. FOR MOUNTING, USE MANUFACTURER'S MOUNTING STANDARDS. 42 FURNSIH AND INSTALL FIBER OPTIC TRANSCEIVER (1) IN EXISTING CABINET WITH LINE CONDITIONER/SURGE SUPPRESSOR (IF REQUIRED). COMPLETE CONNECTION TO WI C. F4] FURNISH AND INSTALL AND TERMINATE CCTV CAMERA DATA CABLE AND COAX FC CABLE ON FIBER OPTIC TRANSCEIVER. 4� FURNISH AND INSTALL 20—AMP BREAKER IN EXISTING CABINET FOR CCTV CAMERA SERVICE. COMPLETE CONNECTIONS IN SERVICE CABINET AND TRAFFIC CABINET TO PROVIDE SERVICE FOR CCTV CAMERA. GENERAL NOTE (THIS SHEET ONLY 1. CONTRACTOR SHALL PROVIDE ALL NECESSARY PATCH CORDS WITH APPLICABLE CONNECTORS (ST, FCPC) AT BOTH ENDS. 2. CONTRACTOR SHALL FIELD VERIFY ELECTRICAL SERVICE LOCATION AND PROVIDE ALL NECESSARY ACCESSORIES FOR INSTALLING CCTV SERVICE. 3. CONTRACTOR SHALL COORDINATE WORK DONE ON CCTV LOCATION SHEETS WITH WORK DONE ON COMMUNICATION SHEETS. 4. TO ATTACH CAMERA BRACKET TO POLE, CONTRACTOR SHALL UTILIZE STAINLESS STEEL STRAP; AS DIRECTED BY ENGINEER. 5. SIGNALIZED INTERSECTION PLANNED FOR UPGRADES BY OTHERS. CONTRACTOR SHALL FIELD VERIFY BEFORE CONSTRUCTION AND COORDINATE WITH OTHERS AS DIRECTED BY ENGINEER. --j I t-� J Al 1 1/2 0 1 2 3 inches on original drawing SCALE:1 "=20' ik INICATION INSTALL 12—STRAND SMFO CABLE IN NEW CONDUIT. SEE SHEET 33, DETAIL B. 6 ❑ FURNISH AND INSTALL NEW PULL BOX N0. 6 WITH EXTENSION. COIL MINIMUM OF 16—FEET (4.9 m) OF 12—STRAND SMFO CABLE FOR SLACK IN PULL 80X. F9] INSTALL CONDUIT INTO EXISTING SPLICE VAULT OR PULL BOX. 10 FURNISH AND INSTALL WALL INTERCONNECT CENTER (WIC) IN EXISTING TRAFFIC CABINET WITH LINE CONDITIONER/SURGE SUPPRESSOR, IF REQUIRED AS DIRECTED BY THE ENGINEER. INSTALL AND TERMINATE 12—STRAND SMFO CABLE USING WIC IN EXISTING CABINET. 12 REMOVE DETECTOR INTERFACE PANEL IN EXISTING TRAFFIC CABINET TO ACCOMMODATE WIC AS DIRECTED BY ENGINEER. 14 FUSION SPLICE SIX (6) STRANDS OF 96—STRAND SMFO CABLE TO THE APPROPRIATE STRANDS OF 12—STRAND SMFO CABLE USING SPLICE ENCLOSURE PER FIBER ASSIGNMENT SCHEDULE ON SHEET 38. COIL MINIMUM OF 16—FEET (4.9 m) OF 12—STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT. COORDINATE SPLICING WITH CCTV DETAILS AND AS NOTED IN FIBER ASSIGNMENT TABLE ON SHEET 38. 17 FURNISH AND INSTALL FIBER OPTIC MODEM TO SUPPORT TRAFFIC SIGNAL CONTROLLER. COMPLETE CONNECTION TO THE EXISTING TRAFFIC SIGNAL CONTROLLER AND WIC. 18 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT VIDEO DETECTION SYSTEM. COMPLETE CONNECTION TO THE VIDEO DETECTION UNIT AND WIC. 25 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT FUTURE VIDEO DETECTION SYSTEM BY OTHERS. COMPLETE CONNECTION TO WIC. 37 FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. SEE SHEET 33, DETAIL B. 41 FURNISH AND INSTALL DOME CCTV CAMERA SYSTEM, ON EXISTING SIGNAL POLE USING CCTV MOUNTING EQUIPMENT. SEE SPECIAL PROVISIONS FOR DETAILS. FOR MOUNTING, USE MANUFACTURER'S MOUNTING STANDARDS. 42 FURNSIH AND INSTALL FIBER OPTIC TRANSCEIVER (1) IN EXISTING CABINET WITH LINE CONDITIONER/SURGE SUPPRESSOR (IF REQUIRED). COMPLETE CONNECTION TO WI C. F4] FURNISH AND INSTALL AND TERMINATE CCTV CAMERA DATA CABLE AND COAX FC CABLE ON FIBER OPTIC TRANSCEIVER. 4� FURNISH AND INSTALL 20—AMP BREAKER IN EXISTING CABINET FOR CCTV CAMERA SERVICE. COMPLETE CONNECTIONS IN SERVICE CABINET AND TRAFFIC CABINET TO PROVIDE SERVICE FOR CCTV CAMERA. GENERAL NOTE (THIS SHEET ONLY 1. CONTRACTOR SHALL PROVIDE ALL NECESSARY PATCH CORDS WITH APPLICABLE CONNECTORS (ST, FCPC) AT BOTH ENDS. 2. CONTRACTOR SHALL FIELD VERIFY ELECTRICAL SERVICE LOCATION AND PROVIDE ALL NECESSARY ACCESSORIES FOR INSTALLING CCTV SERVICE. 3. CONTRACTOR SHALL COORDINATE WORK DONE ON CCTV LOCATION SHEETS WITH WORK DONE ON COMMUNICATION SHEETS. 4. TO ATTACH CAMERA BRACKET TO POLE, CONTRACTOR SHALL UTILIZE STAINLESS STEEL STRAP; AS DIRECTED BY ENGINEER. 5. SIGNALIZED INTERSECTION PLANNED FOR UPGRADES BY OTHERS. CONTRACTOR SHALL FIELD VERIFY BEFORE CONSTRUCTION AND COORDINATE WITH OTHERS AS DIRECTED BY ENGINEER. --j I t-� J Al 1 1/2 0 1 2 3 inches on original drawing SCALE:1 "=20' ik INICATION