HomeMy WebLinkAbout3258-30CONDUCTOR
TYPE
FUNCTION
RUN
t
2
3
4
5
8
RG -59/U QUAD SHEILD COAX
CCTV VIDEO
1
F9]
1
CONDUIT INTO EXISTING SPLICE VAULT OR PULL BOX.
1
1
3PR 24AWG CONDO OR CABLE
CCTV DATA
1
CABINET
1
AS
1
1
110
CCTV POWER
2
2
DETECTOR INTERFACE PANEL IN EXISTING TRAFFIC CABINET
TO
ACCOMMODATE WIC AS DIRECTED BY ENGINEER.
#12
CCTV SERVICE
2
12-SMFO
DROP CABLE
1
1
CONDUIT SIZE
E
E
E
E
2"
2"
NOTE: ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS
OTHERWISE SPECIFIED:
(E) EXISTING
CONSTRUCTION NOTES (THIS SHEET ONLY
F5]FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. FURNISH AND
14 FUSION SPLICE SIX (6) STRANDS OF 96—STRAND SMFO CABLE TO THE
APPROPRIATE STRANDS OF 12—STRAND SMFO CABLE USING SPLICE ENCLOSURE
PER FIBER ASSIGNMENT SCHEDULE ON SHEET 38. COIL MINIMUM OF 16—FEET
(4.9 m) OF 12—STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT.
COORDINATE SPLICING WITH CCTV DETAILS AND AS NOTED IN FIBER
ASSIGNMENT TABLE ON SHEET 38.
17 FURNISH AND INSTALL FIBER OPTIC MODEM TO SUPPORT TRAFFIC SIGNAL
CONTROLLER. COMPLETE CONNECTION TO THE EXISTING TRAFFIC SIGNAL
CONTROLLER AND WIC.
18 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT VIDEO DETECTION
SYSTEM. COMPLETE CONNECTION TO THE VIDEO DETECTION UNIT AND WIC.
25 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT FUTURE VIDEO
DETECTION SYSTEM BY OTHERS. COMPLETE CONNECTION TO WIC.
37 FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. SEE SHEET 33,
DETAIL B.
41 FURNISH AND INSTALL DOME CCTV CAMERA SYSTEM, ON EXISTING SIGNAL POLE
USING CCTV MOUNTING EQUIPMENT. SEE SPECIAL PROVISIONS FOR DETAILS.
FOR MOUNTING, USE MANUFACTURER'S MOUNTING STANDARDS.
42 FURNSIH AND INSTALL FIBER OPTIC TRANSCEIVER (1) IN EXISTING CABINET WITH
LINE CONDITIONER/SURGE SUPPRESSOR (IF REQUIRED). COMPLETE CONNECTION
TO WI C.
F4] FURNISH AND INSTALL AND TERMINATE CCTV CAMERA DATA CABLE AND COAX FC
CABLE ON FIBER OPTIC TRANSCEIVER.
4� FURNISH AND INSTALL 20—AMP BREAKER IN EXISTING CABINET FOR CCTV
CAMERA SERVICE. COMPLETE CONNECTIONS IN SERVICE CABINET AND TRAFFIC
CABINET TO PROVIDE SERVICE FOR CCTV CAMERA.
GENERAL NOTE (THIS SHEET ONLY
1. CONTRACTOR SHALL PROVIDE ALL NECESSARY PATCH CORDS WITH APPLICABLE
CONNECTORS (ST, FCPC) AT BOTH ENDS.
2. CONTRACTOR SHALL FIELD VERIFY ELECTRICAL SERVICE LOCATION AND PROVIDE
ALL NECESSARY ACCESSORIES FOR INSTALLING CCTV SERVICE.
3. CONTRACTOR SHALL COORDINATE WORK DONE ON CCTV LOCATION SHEETS WITH
WORK DONE ON COMMUNICATION SHEETS.
4. TO ATTACH CAMERA BRACKET TO POLE, CONTRACTOR SHALL UTILIZE STAINLESS
STEEL STRAP; AS DIRECTED BY ENGINEER.
5. SIGNALIZED INTERSECTION PLANNED FOR UPGRADES BY OTHERS. CONTRACTOR
SHALL FIELD VERIFY BEFORE CONSTRUCTION AND COORDINATE WITH OTHERS AS
DIRECTED BY ENGINEER.
--j I t-�
J
Al
1 1/2 0 1 2
3 inches on original drawing
SCALE:1 "=20'
ik
INICATION
INSTALL
12—STRAND SMFO CABLE IN NEW CONDUIT. SEE SHEET 33,
DETAIL B.
6
❑
FURNISH
AND INSTALL NEW PULL BOX N0. 6 WITH EXTENSION. COIL
MINIMUM OF
16—FEET
(4.9 m) OF 12—STRAND SMFO CABLE FOR SLACK IN PULL
80X.
F9]
INSTALL
CONDUIT INTO EXISTING SPLICE VAULT OR PULL BOX.
10
FURNISH
AND INSTALL WALL INTERCONNECT CENTER (WIC) IN EXISTING TRAFFIC
CABINET
WITH LINE CONDITIONER/SURGE SUPPRESSOR, IF REQUIRED
AS
DIRECTED BY THE ENGINEER. INSTALL AND TERMINATE 12—STRAND SMFO CABLE
USING WIC IN EXISTING CABINET.
12
REMOVE
DETECTOR INTERFACE PANEL IN EXISTING TRAFFIC CABINET
TO
ACCOMMODATE WIC AS DIRECTED BY ENGINEER.
14 FUSION SPLICE SIX (6) STRANDS OF 96—STRAND SMFO CABLE TO THE
APPROPRIATE STRANDS OF 12—STRAND SMFO CABLE USING SPLICE ENCLOSURE
PER FIBER ASSIGNMENT SCHEDULE ON SHEET 38. COIL MINIMUM OF 16—FEET
(4.9 m) OF 12—STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT.
COORDINATE SPLICING WITH CCTV DETAILS AND AS NOTED IN FIBER
ASSIGNMENT TABLE ON SHEET 38.
17 FURNISH AND INSTALL FIBER OPTIC MODEM TO SUPPORT TRAFFIC SIGNAL
CONTROLLER. COMPLETE CONNECTION TO THE EXISTING TRAFFIC SIGNAL
CONTROLLER AND WIC.
18 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT VIDEO DETECTION
SYSTEM. COMPLETE CONNECTION TO THE VIDEO DETECTION UNIT AND WIC.
25 FURNISH AND INSTALL FIBER MULTIPLEXER TO SUPPORT FUTURE VIDEO
DETECTION SYSTEM BY OTHERS. COMPLETE CONNECTION TO WIC.
37 FURNISH AND INSTALL ONE (1) 2" (51 mm) HDPE CONDUIT. SEE SHEET 33,
DETAIL B.
41 FURNISH AND INSTALL DOME CCTV CAMERA SYSTEM, ON EXISTING SIGNAL POLE
USING CCTV MOUNTING EQUIPMENT. SEE SPECIAL PROVISIONS FOR DETAILS.
FOR MOUNTING, USE MANUFACTURER'S MOUNTING STANDARDS.
42 FURNSIH AND INSTALL FIBER OPTIC TRANSCEIVER (1) IN EXISTING CABINET WITH
LINE CONDITIONER/SURGE SUPPRESSOR (IF REQUIRED). COMPLETE CONNECTION
TO WI C.
F4] FURNISH AND INSTALL AND TERMINATE CCTV CAMERA DATA CABLE AND COAX FC
CABLE ON FIBER OPTIC TRANSCEIVER.
4� FURNISH AND INSTALL 20—AMP BREAKER IN EXISTING CABINET FOR CCTV
CAMERA SERVICE. COMPLETE CONNECTIONS IN SERVICE CABINET AND TRAFFIC
CABINET TO PROVIDE SERVICE FOR CCTV CAMERA.
GENERAL NOTE (THIS SHEET ONLY
1. CONTRACTOR SHALL PROVIDE ALL NECESSARY PATCH CORDS WITH APPLICABLE
CONNECTORS (ST, FCPC) AT BOTH ENDS.
2. CONTRACTOR SHALL FIELD VERIFY ELECTRICAL SERVICE LOCATION AND PROVIDE
ALL NECESSARY ACCESSORIES FOR INSTALLING CCTV SERVICE.
3. CONTRACTOR SHALL COORDINATE WORK DONE ON CCTV LOCATION SHEETS WITH
WORK DONE ON COMMUNICATION SHEETS.
4. TO ATTACH CAMERA BRACKET TO POLE, CONTRACTOR SHALL UTILIZE STAINLESS
STEEL STRAP; AS DIRECTED BY ENGINEER.
5. SIGNALIZED INTERSECTION PLANNED FOR UPGRADES BY OTHERS. CONTRACTOR
SHALL FIELD VERIFY BEFORE CONSTRUCTION AND COORDINATE WITH OTHERS AS
DIRECTED BY ENGINEER.
--j I t-�
J
Al
1 1/2 0 1 2
3 inches on original drawing
SCALE:1 "=20'
ik
INICATION