HomeMy WebLinkAbout3246-1CONSTRUCTION NOTES: O1 CONST. 36' RCP (15001)) 02 CONST. 30' RCP (1500D) O3 CONST. 24' RCP (20000) ® CONST. JUNCTION STRUCTURE PER APWA STD. 321-1 AND PER DETAIL SHOWN ON SHEET 4 Q MODIFY EXIST. JUNCTION STRUCTURE AS NECESSARY TO JOIN TO THE SATISFACTION OF THE INSPECTOR © CONST. CONC. C.B. PER APWA STD. PLAN 300-2 AND PER DETAIL SHOWN ON SHEET 3. Q INSTALL CONCRETE COLLAR PER APWA STD 380-3 AND PER DETAIL SHOWN ON SHEET 4 ® SAWCUT AND REMOVE EXISTING 24' RCP AS NECESSARY GRANULAR BEDDING FROM SELECTED TRENCH SIDE MATERIAL (1' MAX. SIZE). W a a NOTES. 1. TRENCH WIDTH SHALL BE CONTROLLED TO TOP OF PIPE ZONE. 2. TRENCH DEPTHS OF GREATER THAN 5' SHALL HAVE ADEQUATE SHORING. 3. CLASS II AGG. BASE ALL TRENCHES LESS THAN 100' IN LENGTH. COMPACTION SHALL BE 90% IN ALL ZONES UNLESS OTHERWISE SPECIFIED. TRENCH STABILITY SHALL CONFORM TO CAL -OSHA REQUIREMENTS. STORM DRAIN 0 QUANTITIES: 166 L.F. 276 L.F. 104 L.F. 2 EA. 1 E.A. 5 EA. 1 EA. I L.S. a -GRANULAR BEDDING FROM SELECTED TRENCH SIDE MATERIAL FOR PIPE 10' OR GREATER IN DEPTH USE 1/2 CRUSHED STONE BEDDING. TRENCH DETAIL NO SCALE PREPARED BY QRa F E S SioN q FIRM: raab engineering, Inc. ��``�P�.'� ' #417 Fy/ ADDRESS: 310 S. MAPLE ST., STE. 0 w NO. 29616 CORONA, CA 92880 TELEPHONE:0 ) 27.,. -1072 FAX: ( 909) 272-0166 � Exp. 3/31/03 4 29616 lot A t 9o r vi V SIGNATURE RCE DATE lF OF CA%-\FQ <c HENILOCK ELEj\/1EjN_fr/\RY SCHOOL 11 II jl VA Cr/ JNI r II 228-3-52-05 37 RM INDEX MAP XDENOTES SEE SHEET NO. 4 TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT TRACT NO. 13219 BASIS OF BEARING THE BEARING OF N89'54'23"W FOR THE CENTERLINE OF MILLER AVENUE, AS SHOWN ON A RECORD OF SURVEY FILED IN BOOK 59 PAGES 52 THROUGH 62, INCLUSIVE, WAS USED AS THE BASIS OF BEARINGS FOR THIS MAP. BENCH MARK= NO. 360 CITY OF FONTANA BENCHMARK 1360 - A NAIL IN POLE 111563704E AT THE SOUTHWEST CORNER OF LIME AVENUE AND BASELINE AVE. ELEV: 1376.03 ■iv 11 1 101 9 56 VACANT 228-251-27 VACANT GENERAL NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK'. ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK, THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SJIALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 5. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 8. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 9. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 10. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 11. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD. THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227- 2600 TWO WORKING DAYS BEFORE EXCAVATION. 12. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 13. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 14. STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLM GRADES. THE CONTRACTOR SMALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT. DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION 1 TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 21. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 22. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTON OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 23. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCOES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS, 24. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. LEGEND 10+00.00 SEWER STATION 32. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. r MH MANHOLE 25. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. SEWER LINE BC BEGIN CURVE 26. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. 0 ATTN: CARLOS NAVARRO 8353 SIERRA AVENUE ATTN: VIRGINIA BECKER 3939 E. CORONADO STREET HANDICAPPED ACCESS RAMP R/W RIGHT OF WAY 34. MINIMUM D -LOAD FOR ALL RCP IS 1350. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON -' SEWER LINE PER EC END CURVE T.C. TOP OF CURB THE PLANS. OTHER SHEET (909) 350-6632 (714) 666-5467 - -EX S-- - EXIST. SEWER LINE CL CENTERLINE 27, IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE STORM DRAIN LINE F.L. FLOWLINE GUTTER (ELEV) EXISTING ELEVATION ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. WATER LINE F.S. FINISHED SURFACE 28, NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. - -_EX W- - EXIST. WATER LINE 56 VACANT 228-251-27 VACANT GENERAL NOTES: 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK'. ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK, THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SJIALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 5. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 8. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 9. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 10. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 11. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD. THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227- 2600 TWO WORKING DAYS BEFORE EXCAVATION. 12. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 13. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 14. STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLM GRADES. THE CONTRACTOR SMALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT. DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION 1 TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 21. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 22. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTON OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 23. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCOES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS, 24. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. LEGEND 10+00.00 SEWER STATION 32. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. ♦- FIRE HYDRANT MH MANHOLE 25. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. SEWER LINE BC BEGIN CURVE 26. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. ATTN: CARLOS NAVARRO 8353 SIERRA AVENUE ATTN: VIRGINIA BECKER 3939 E. CORONADO STREET HANDICAPPED ACCESS RAMP R/W RIGHT OF WAY 34. MINIMUM D -LOAD FOR ALL RCP IS 1350. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON -' SEWER LINE PER EC END CURVE T.C. TOP OF CURB THE PLANS. OTHER SHEET (909) 350-6632 (714) 666-5467 - -EX S-- - EXIST. SEWER LINE CL CENTERLINE 27, IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE STORM DRAIN LINE F.L. FLOWLINE GUTTER (ELEV) EXISTING ELEVATION ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. WATER LINE F.S. FINISHED SURFACE 28, NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. - -_EX W- - EXIST. WATER LINE F. FINISHED DIRT SEWER MANHOLEEX (909) 335-7547 EMERGENCIES: (800) 427-2200 ATTN. JACK HAYES 1205 DUPJNT AVE. 29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. SITE EXISTING BASELINE �- DIRECTION OF FLOW S SEWERLINE 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. - - PROPOSED/ FUTURE R/W SO STORM DRAIN LINE 31. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR /i ,/i EDGE OF PAVEMENT W WATERLINE ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE UPON COMPLETION OF PAVING. ---- CENTERLINE ST STREET STATION THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO UTILITY NOTIFICATIONS �+ WATER VALVE 10+00.00 SEWER STATION 32. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. ♦- FIRE HYDRANT MH MANHOLE STREET LIGHT INT. INTERSECTION 33. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS CITY OF FONTANA PACIFIC BELL CO. TO THE CITY ENGINEER. ATTN: CARLOS NAVARRO 8353 SIERRA AVENUE ATTN: VIRGINIA BECKER 3939 E. CORONADO STREET HANDICAPPED ACCESS RAMP R/W RIGHT OF WAY 34. MINIMUM D -LOAD FOR ALL RCP IS 1350. FONTANA. CA 92335 ANAHEIM, CA 92807 T.C. TOP OF CURB (909) 350-6632 (714) 666-5467 REMOVE EXIST. AC PAVEMENT ELEV. PROPOSED ELEVATION SOUTHERN CALIFORNIA GAS COMPANY UNDERGROUND SERVICE ALERT (ELEV) EXISTING ELEVATION ATTN: DENNIS FREEMAN 1981 W. LUGONIA AVE. (800) 422-4133 NOR1N REDLANDS, CA. 92374 COMCAST (CABLE TV) GRIND EXIST. PAVEMENT PROJECT (909) 335-7547 EMERGENCIES: (800) 427-2200 ATTN. JACK HAYES 1205 DUPJNT AVE. PRIVATE ENGINEER'S NOTES TO CONTRACTOR SITE ONTARIO, CA 91761 CONCRETE IMPROVEMENTS BASELINE AVE SOUTHERN CALIFORNIA EDISON COMPANY (909) 390-4738 300 N. PEPPER STREET THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES CONDUITS OR ANY STRUCTURES SHOWN � a W RIALTO, CA 92376 GENERAL TELEPHONE CO. PROPOSED RETAINING WALL ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE 909820-5598 -- UNDERGROUND ATTN: STEVE HOCK THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO a we 909 875-5100 -- TRANSMISSION 1400 E. PHILLIPS BLVD. TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE 213 637-1233 -- PIPELINES ONTARIO, CA 91766 PROPOSED LOT UNE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR (800) 422-4133 STRUCTURES NOT SHOWN ON THESE DRAWINGS. PROPOSED/FUTURE CURB -1 CRAWFORD CANYON MUTUAL WATER CO. FONTANA WATER COMPANY CONTRACTOR AGREES THAT HE/ SHE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE FOOTHILL AVE ATTN: BILL VANDERKIEFT, JR. (619) 868-6040 ICH ATTN: MICHAEL PROPOSED 2:1 SLOPE (MAX) CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS 8440 N AVE.J.MCGRAW _ - _ E AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL FONTANA. CA 92235 WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY, THE OWNER VICINITY MAP F ) ENGINEERHARMLESS LIABILITY,D ALL O ALLEGED, NOT SCALE AX (909) 8235046 TO PERFORMANCEOF WORO ONTHSPROJECT.� EXCEPTING FOR LIABILITYARISING FROM ROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT Qrepflre de e-Supery siora..O ;• CITY OF FONTANA, CALIFORNIA COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, DRAWN BY: SCALE: STORM DRAIN PLAN -TRACT 16216 I' = IOT THE CITY ENGINEER MAY REOUIRE REVISIONS TO THE PLANS TO DESIGNED BY: DATE: TI 27 AUG 2002 BRING THEM INTO CONFORMANCE WITH CONDITIONS ANDD Date ; CHECKED BY: APP 01A ate �A DRAWING NO.: 1 STANDARDS IN EFFECT.' 3246 4 CIT ENGINEER R.C.E. 51152 DATE: