Loading...
HomeMy WebLinkAbout3180-1lip 'tt4ll'7llll� 0 F q all THE STRATHAM GROUP 2201 DUPONT DR., SUITE 3000 IRVINE, CA 92612 Project Site VICINITY MAF n.t,5. 'T"T 7�7''�11177 k"577' .ate I . . . .. ..... Em FONTAN,CAA I. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6633. 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED: PRE CONSTRUC-TION MEETING INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PR,SSU RETEST G& 1. 50 P.S.I. FOR A THREE (3) HOUR CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. FINISH GRADE PRIOR TO PLANTING. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION. PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS. COMPLIANCE WITH A-PPROVED PLANS. FINAL INSPECTION. 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION. ...... . ............. liq 40 YOPE 1'c -A-6 0 L is sd za U -J MJ 0 L con U -J J013 NO.: 01-27 KEV1510N5: 5HEET NUM13EK: I Of: 9 "1 11