Loading...
HomeMy WebLinkAbout3982-1a CERRITOS C� SCOTT DR� a Q UUUU LOS CEDROS AV WALNUT AV VICINITY --MAP NTS LANDSCAPE ARCHITECTURAL PLANS FOO R� BOO 3700 NCO ci_ N. r. S. PROJECT LOCA TION ti RSV 0909) g I N5PECT I ON5: 1. IT 15 THE LANDSCAPE CONTRACTOR'S RESPONSI iii LI TY TO CONTACT THE ENGINEERING DIV15ION'5 LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM AT (qOq) 350-6633 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING ARE REQUIRED: PRE-CON5TRUCTION INSPECTION INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL. FIN15H GRADE PRIOR TO PLANTING PLANT MATERIALS PRIOR TO PLANTING AND 501L PREPARATION. PLANTING, INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR 5PECIE5 AND FINAL LOCATIONS. FINAL INSPECTION. APPROVED PLANS. J L u 3. THE OWNCRS REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT EACH INSPECTION. cc�a (D���o 94 = X426 SITE AYOLUT P TOL FREE 1-800--227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. I REVISION DESCRIPTION I DATE I ENGR. I CITY I DATE Vis\� M N.T.S SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH CONDITIONS AND STANDARDS IN EFFECT. 1. 2. 3. 4. 5. 6. N T. gF L 14L 0 exp. date 2725 OF CA- 4 SHEET INDEX TITLE SHEET IRRIGATION PLAN IRRIGATION PLAN PLANTING PLAN PLANTING PLAN CONSTRUCTION DETAILS ,,&ITY OF FONTANA, CALIFORNIA AMHMECM TRACT NO. 16724 CFD AREAS LMOSCAPB ARCCBnZCTM DRAWN BY: SCALE: MEGATION CONSULTANTS CAD TxLE NONE DESIGNED BY: CR § ET H DATE: 10/11/05 15 South 5th Street (909) 0909 07—SM CA Ltc. No. 2725. Lib. No. 486 CHECKED BY: VED DRAWING NO.: � STB CITY EN 1 ER R.C. E. / 3982 5 152 DATE 6