Loading...
HomeMy WebLinkAbout3980-1•­ NI[ 11 ` d-iil ILD 0 ■ z E G E 5 / Landscape 3195-B Airport Loop Dr., (949) 644-9370 Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140 & Planning Richard Polhamus, License # 2782 RcooAND AND CityRenuired Notes INSPECTIONS: 1. It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours Prior to desired inspection of an item at (909)350-6633 2. Prior to the release of utilities or maintenance period commencement, the following inspections are required: — Pre -Construction Inspection — Inspection of irrigation system in open trench condition (prior to backfill). — Irrigation coverage tests including initial and final tests. -- Finish grade prior to planting. — Planting materials prior to planting and soil preparation. — Planting, including street trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. — Compliance with approved plans. — Final Inspection. 3. Notify the landscape architect of pending job completion so she/he may complete the "Landscape certification of completion". The community development engineering division landscape inspector will conduct the final landscape inspection. The owner's representative and landscape contractor shall be present at the final landscape inspection. SITESCAPES, INC. HEREBY CERTIFIF�S THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. PROTECT SITE n S E E T I N [1)' E S U B"Ma I T T 'Am L ZA03' JULY 25, 2005 - 1ST. SUBMITTAL T— 1 TITLE SHEET AUGUST 301, 2005 - 2ND. SUBMITTAL L— 1 H.O.A. MAINLINE LAYOUT @ 50 SCALE L— 2 IRRIGATION DETAILS, NOTES &LEGEND L— 3 IRRIGATION DETAILS L— 4 IRRIGATION PLAN (20 SCALE) L— 5 IRRIGATION PLAN (20 SCALE) � Raft,r_—q& PPRUVA I— L— 6 PLANTING DETAILS, NOTES &LEGEND L— 7 PLANTING PLAN TREES & GROUNDCOVER (20 SCALE) L— 8 PLANTING PLAN TREES & GROUNDCOVER (20 SCALE) L— 9 PLANTING PLAN SHRUBS &VINES (20 SCALE) AV L— 10 PLANTING PLAN SHRUBS & VINES (20 SCALE) N.T.S. L— 11 SPECIFICATIONS n