HomeMy WebLinkAbout3923-1VICINITY MAP
N.T.S.
GENERAL NOTES
CITY
STREET
O� MONTANA
IMPROVEMENT PROJECT
�RILL AVENUE
AND
DESCRIPTION
CATAWBA
R.
NO.
16898.
65
0.5'-
PROPOSED GRADE-,- 0.5'
PROPOSED SIDEWALK
4" THICK PER CITY SM. 1015 -
PROPOSED 8" CF
CURB & GUTTERJPROPOSED 6THK/ I `SAWCUTO TO REMAIN•`."",,.." .,.".....`".".
PER CITY STD. 1003 .5" . &JOIN 9
A.C. PAVEMENT) `MIN. 1.67x
PER CITY STD. 1000 MAX. 2.55%
PROPOSED WORK OF MERRILL AVENUE
STREET
DEDICATION
16'
S'LY R/W. EX. R/W N'LY R/W.
92'-
-46 46'
I 34 ( MIN. 1.87X)
6' S' 5 I
6 1 MAX. (2.73X) I
EXISTING A C PAVEMENT
1. ALL WORK SHALL BE IN ACCORDANCE NTH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION (" GREEK BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST
EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXISTS IN THE CONTRACT DOCUMENTS THAT CAN NOT BE
RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEK BOOK", THE CONTRACTOR SHALL
IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL NOT BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY
DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION
COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN
PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES
DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION
UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR
OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OF TRENCH WORK FOR TRENCHES
5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE
GUARDED BY SHORING , SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE
REQUIREMENTS OF THE DIVISION OF THE INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS
THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A
SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF THE UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION,
HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE
LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO
AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT
1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION,
DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY
COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT
APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER
COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
SHEET INDEX
STREET NAME
TITLE SHEET
MERRILL AVE.
& CATAWBA AVE.
MERRILL AVENUE
CATAWBA AVENUE
CATAWBA AVENUE
SHT.
1
DESCRIPTION
VICINITY MAP, LOCATION MAP & INDEX MAP,
SHEET INDEX
2 MERRILL AVE. FROM STA. 0+00.00 TO 3+37.02
3 CATAWBA AVENUE FROM STA. 0+00 TO 3+43.31
4 DETAILS
9L1 R/W NOT TO SACLE
T.I. = 9
AVENUE
STREET
DEDICATION
4'
EX. R/W
E'LY R/W. I
34'
�12' -22'
0.5 ,
5'
0.50---I-.--• 1.
2% 9
CENTERLINE
OF MERRIL AVENUE
CATAWBA AVENUE 46' (MERRIL AVENUE)
34' (CATAWBA AVENUE
32.5' (MERRIL AVENUE) • 5,
20.5 (CATAWBA AVENUE)
8.33%
NEW A. C.
PVMT.
PER G d n,. ,/
",.8" PCC DRIVEWAY RAMP
560-C-3250
#4 RE -BAR
VCUMPACTEU NATIVE ®12" 0. C. EACHWAY
SUBGRADE
TYPICAL DRIVEWAY SECTION
ALONG MERRIL AVENUE AND CATAWBA AVENUE
(NOT TO SCALE)
WLY R/W.
34'
MIN. (1.56%)
MAX. (3.46%)
vp
LEVEL LINE
PROPOSED SIDEWALK : 8 .F _ - -
4" THICK PER CITY STD. 1015 �" •f+.
PROPOSED 8" CF SAWCUj� v
CURB & GUTTER " & JOINV
PER CITY STD. 1003 PROPOSED 4.5 THK.
A.C. PAVEMENT MIN. 1.74% EXISTING A.C. PAVEMENT
PER CITY STD. 1000 MAX. 3.20% TO REMAIN
PROPOSED WORK OF CATAWBA AVENUE
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENT, MONUMENT TIES OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS,
MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND
SURVEYOR, SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE
REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THE
TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A
MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS
AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING
ADEQUATE WATERING, AT ALL TIMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25
MILES PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIALS, MUD, SILT OR DEBRIS TO BE
DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION
WITHOUT PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PROR APPROVAL PF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE
REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES AND SWALES FROM UNDERMINING STREET
NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME
OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE
SEWER LATERAL.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED,
INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF
STREETS.
30. APPROVED SOIL STER(LANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF
THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF A.A. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET
SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF
FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE
BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING,
BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED
BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO
SALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
68'R/W NOT TO SACLE
T. 1. = 6.5
CONSTRUCTION NOTES & QUANTITIES
ITEM
DESCRIPTION
QUANTITY
UNIT
O
CONSTRUCT 4.5" MIN. A.C. PAVEMENT OVER 12" MIN. OF 95X
65
TON
COMPACTED NATIVE SUBGRADE
0
CONSTRUCT 8" CURB & 18" GUTTER PER CITY OF FONTANA STD. 1003
735
LF
O
CONSTRUCT 6.5" MIN. A.C. PAVEMENT OVER 12" MIN. OF 95X
197
TON
AVE
COMPACTED NATIVE SUBGRADE
a
O
CONSTRUCT DRIVE APPROACH PER CITY OF FONTANA STD. 1005A
912
SF
0
CONSTRUCT SIDEWALK PER CITY OF FONTANA STD. 1015
4,100
SF
0
CONSTRUCT CURB RETURN ACCESS RAMP PER CITY OF FONTANA STD.
1
EA
1006
OINSTALL
STREET LIGHT PER CITY STD. 1016 PER ST. LGT. PLAN, STREET
6
EA
LIGHTS TO BE PAID FOR AND COORDINATED BY DEVELOPER AND
SAN BER
INSTALLED BY SCE.
0 A
O
CONSTRUCT 4'-6" PARKWAY DRAIN PER APWA STD. 151-1
1
EA
DETAIL ON SHEET 4
O
SAWCUT AND A. C. OVERLAY PER DETAIL ON SHEET 1
3,075
SF
t 0
RELOCATE EX. POWER POLE
2
EA
UTILITY CONTACT LIST
CITY OF FONTANA
ATTN: BRIAN WREN
8353 SIERRA AVENUE
FONTANA, CA 92335
(909) 350-6632
THE GAS COMPANY
ATTN: GREG GASPAR
FONTANA., CA 92335
EMERGENCIES: (800) 427-2200
SO. CALIFORNIA EDISON COMPANY
7951 REDWOOD AVE.
FONTANA, CA 92335
(909) 820-5598- UNDERGROUND
(909) 875-5100- TRANSMISSIONS
(213) 637-1233- PIPELINES
(909) 357-6233- DISTRIBUTION
CRAWFORD CANYON MUTUAL WATER CO.
ATTN: BASIL J. FABRIZIO
(909) 463-9580
UNDERGROUND SERVICE ALERT
(800) 422-4133
METROPOLITAN WATER DISTRICT
WATER SYSTEM OPERATION GROUP
ATTN: JOE MIRONE
(909) 776-2664
PACIFIC BELL CO.
ATTN: NORMA GUILLOT
1265 N. VAN BUREN STREET
SUITE 180
ANAHEIM, CA 92807
(714) 666-5401
C. PAVEMENT
urt_mrt_ AVE
MERRIL
AVE
111*1
TE �
RANDAL
AVE
a
Q
a o
� a
�
Q
cwon
SAN BER
ARDI
0 A
_ �Q�
ape
a
a
Q
;2S
VALL
Y AVE
U
FT"nw
LOIR
A
NOT TO SCALE LOCATION MAP
BENCH MARK:
SBCO SURVEYOR MONUMENT: SURVEY DISK STAMPING: 700-15 1968
SPECIFIC SETTING: BR. DISK ON CONC POST. ELEV = 1,225.801'
AT CATAWBA AVE & AT & SF RR, 13 FT. E CATAWBA, 49 FT.
S OF S RAIL OF MAIN LINE TRACKS, 10 FT. N OF N ROW
EUCALYPTUS TREE, 2.5 FT. W & 1.5 FT. S OF FENCE CORNER,
2 POLES E OF MILEPOST 90, 0.8 FT. ABOVE GROUND, IN A 6 IN.
SQUARE CONC. MONUMENT.
BASIS OF BEARING:
CENTERLINE OF MERRILL AVENUE SHOWN AS N89'45'00"E PER PARCEL
MAP NO. 113059 M.B. 129/24-25, RECORDS OF SAN BERNARDINO
COUNTY.
GRIND 0.1 'MIN.
EX. PVMT. AND
OVERLAY 0.1 ' MIN.
SAWCUT &JOIN
i` � S�JI'fr
PAVEMENT
NEW PAVEMENT
SAWCUT DETAILO
NTS
SHT. 2
MBTM =A f IN
r
4.�
Awl I I 11
■ 1 �
00
SHT. 3 INDEX MAP
COMCAST (CABLE TV)
ATTN: JACK HAYES 1205
1400 E. PHILLIPS BLVD.
DUPONT AVENUE ONTARIO, CA.91761
(909) 390-4738
VERIZON
ATTN: STEVE HOOK
POMONA, CA 91766
(909) 469-6327
FONTANA WATER COMPANY
ATTN: MICHAEL
J. MCGRAW 8440 NUEVO
AVENUE FONTANA, CA 92335
PH: (909) 822-2201 FAX: (909) 823-5046
WEST VALLEY WATER DISTRICT
ATTN: LON TSAI
855 W. BASELINE ROAD
RIALTO, CA 92377
SEWER: CITY OF FONTANA
ATTN: BRIAN WREN
(909) 350-7610
8353 SIERRA AVENUE
FONTANA, CA 92335
OWNER
VICTOR LIANG
16015 PHOENIX
CITY OF INDUSTRY, CA 91745
PH: 626-255-5833
AUTOCAD mumme street.dwg