Loading...
HomeMy WebLinkAbout3906-1CITY OF FONTANA SIGNING & STRIPING NOTES 1. ALL WORK, MATERIALS AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING SHALL CONFORM TO THESE PLANS AND THE STANDARD SPECIFICATIONS FOR THE CITY OF FONTANA, THE STANDARD PLANS & SPECIFICATIONS OF THE STATE OF CALIFORNIA (DATED JULY 2002), THE 2003 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), AND THE MUTCD 2003 CALIFORNIA SUPPLEMENT. 2. PAVEMENT MARKINGS SHALL MATCH THE CITY OF FONTANA STANDARD STENCILS. 3. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC PER SPECIAL PROVISIONS. 4. TRAFFIC SIGN SIZE SHALL BE STANDARD UNLESS OTHERWISE SHOWN ON THE PLANS. 5. ALL SIGNS SHALL BE MOUNTED ON A GALVANIZED STEEL POST, UNLESS OTHERWISE SHOWN ON PLANS, PER CITY STANDARD DETAIL NO. 139. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, TRAFFIC SIGNS OR OTHER TRAFFIC CONTROLS AT ALL TIMES. 7. CONTROL POINTS OR "CAT -TRACKING" TO BE APPROVED BY THE ENGINEER 2 WORKING DAYS PRIOR TO PAVEMENT STRIPING APPLICATION. 8. CROSS WALKS SHALL HAVE 10' BETWEEN THE CENTER LINES OF 12" STRIPES PER CITY STD. 1006. 9. ALL CONFLICTING STRIPING, MARKINGS TO BE REMOVED BY METHOD AS DESCRIBED IN SPECIAL PROVISIONS, SECTION E. 10. SUBSTITUTE TYPE "C" FOR TYPE "G" MARKERS ON DETAILS 37B & 38 FOR HIGHWAYS WITH RAISED MEDIANS. NOTES: 1. R/W CERTIFICATION SHALL BE PROVIDED PRIOR TO CONSTRUCTION. 2. PLANS ARE APPROVED WITH R/W AND STREET IMPROVEMENTS AS SHOWN. 3. ANY DEVIATION/S FROM THESE - PLANS SHALL REQUIRE A REVISION TO BE APPROVED BY THE CITY TRAFFIC ENGINEER. PRIVATE ENGINEER'S NOTICE TO CONTRACTORS THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY: THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE AGENCY AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE AGENCY OR THE ENGINEER. BENCH MARK: The Bench Mark for this project is: SL -3. Chis. " " on top of curb return of Sierra Avenue and Summit Avenue Elevation =1663.115 BASIS OF BEARINGS: The basis of bearings for this drawing is: The west line of Sec. 20 T1 N, R5W being N00'33'41 "W per R.S. 35/9 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT SIGNING AND STRIPING CONSTRUCTION NOTES U1 APPLY IV 4 EA 2 APPLY LEFT E TiURNNARROW,,TYPEEIV . 8 EA gAPPLY LANE DROP ARROW, TYPE VI .3 EA APPLY 300mm (12") WHITE CROSSWALK MARKING PER CIN STI) 1006. .150 LF 5 APPLY MEDIAN ISLAND, DETAIL 29 .2,650 LF 6 APPLY SOLID WHITE UNE PER DETAIL "A" HEREON. .450 LF 7 APPLY CHANNELIZING UNE, DETAIL 38 .1,150 LF S APPLY 4' V4HIiE LINE. .170 LF INDEX OF SHEETS 9 APPLY LANE UNE, DETAIL 14A .4,800 LF 10 APPLY EDGE UNE, DETAIL 276 .7,230 LF SHEET No. DESCRIPTION 11 APPLY 4' DOUBLE YELLOW CENTERLINE, DETAIL 22 .1,070 LF t TITLE SHEET 12 INSTALL R26 (S)(CA) SIGN &POST _23 EA 2 SIGNING &STRIPING (STA. 118+00.00 TO STA. 140+00.00) 13 PROTECT EXISTING SIGNING &STRIPING. . - EA 3 SIGNING &STRIPING (STA. 140+00.00 TO STA. 160+00.00) is REMOVE EXISTING STRIPING +WORD LEGENDS. . - EA 15 INSTALL SIGN do POST PER CIN OF FONTANA STD. DTL N0. 139 (SIGNAGE AS NOTED ON SHEET) . . 5 EA 4 SIGNING &STRIPING (STA. 160+00.00 TO STA. 176+00.00) 16 APPLY LEGEND AS SHOWN ON PLANS PER STD. PLAN A24D. . 4 EA 5 SIGNING &STRIPING TERRA VISTA DRIVE 17 APPLY LANE DROP PER DETAIL 378 IMiH RPM'S . .700 LF 18 INSTALL TYPE "F' DELINEATORS . . 6 EA SIERRA AVENUE SHEET 2 SHEET 2 SHEET 3 SHEET 3 SHEET 4 SHEET 4 f E A 3 � WZ�+ W Wim, F-4 0t L�+Cn A�; A A � � E-4, SH � �, SHEET 5 _ v > '�� ,, PROJECT SITE w INDEX MAP DUNCAN CANYON ROAD E-1 SCALE: 1"=600' r� REV. I REVISION DESCRIPTION I DATE I ENGR. I CITY I DATE 1 00m (4") WHITE STRIPE TYPE "G" RPM TYPE "G" RPM DIRECTION OR TRAVEL 150mm 15m (49) SECOND MARKER NOT USED AT LIMIT LINES (6") OR CROSSWALK AND BEGIN STRIPE AT LIMIT LINES OR CROSSWALK ...Is• •, DETAIL "A" N.T.S. QRpFESSj�N� Q� PSS H UR c4,p1 � Or Z = No. 31681 zm Exp. 12/31/06 `rq��, CIVIL OF CAI.��� WILSON AVE BEECH AVE Engineering m Surveying s Planning n Landscape Architecture 9130 Anaheim PI., Ste. 120 -Rancho Cucamonga, CA 91730.909-484-9090 PREPARED UNDER THE SUPERVISION OF: , 1 .�. .\. //// (11105.- Q 'SCI TY 15 OF ONTANA �P SUMMIT QG' AVE CV Q ;.r 0� W > Engineering m Surveying s Planning n Landscape Architecture 9130 Anaheim PI., Ste. 120 -Rancho Cucamonga, CA 91730.909-484-9090 PREPARED UNDER THE SUPERVISION OF: , 1 .�. .\. //// (11105.- Q 'SCI TY 15 OF ONTANA �P SUMMIT QG' AVE CV Q O 0� W > J Q W W Q Q ULi OJ O Q � �-. )1- W �-. U W W m 2101 AVE 11 VICINITY MAP Q a Q CITY OF FONTANA, CALIFORNIA SIGNING & STRIPING PLAN DRAM KFS SIERRA AVENUE �`�`"N/A DESIGNED BY: 1TTLr= qHEE7 DAIS: KFS 11-11-05 CHEq(m BY: APPROVED 8Y: DWG. NO.: ' RL8x1z os=6 CITY TRAFFIC ENGINE R.C.. 68819 DATE: / 5 01 3 — v o > LZ O E �Q N 4� ii w o N � F4,: o � o o z � a o� � J