HomeMy WebLinkAbout3780-1GENERAL. NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF
FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE
STA avo SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK'. ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL. BE THE
LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT
DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE
PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY
REPORT SAID CONFLICT THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE
CITY ENGINEER.
4. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT
SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS.
5. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION
PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL
BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF
ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL
(909) 350-7610.
6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES,
METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA
MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS
OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
7. R SHALL. BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN
BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL
TIMES.
8. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION
OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM
THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
9. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5)
FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE
GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS
OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA.
TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN
THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
10. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC
RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT
PURPOSE
11. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM
AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
THE ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER
PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL
CONTACT UNDERGROUND SERVICE ALERT AT 1--800-227-2600 TWO
WORKING DAYS BEFORE EXCAVATION.
12. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY
COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC,
CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER,
RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS.
ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE
PRIOR TO WORK AROUND THEIR FACILITIES.
13. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR
WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY
FOR VALVE OPERATION AND WATER REQUIREMENTS.
14. STATIONING REFERS TO THE CENTERUNE OF STORM DRAIN EXCEPT
WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE
ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO
THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING
DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS,
MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO THE
CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING
SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE
BY A REGISTERED CML ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS
CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE
MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESPDENTS
AND BUSINESSES AT ALL TIMES, A MINIMUM 12 FOOT LANE SHALL BE
MAINTAINED AT ALL LIMES IN THE CONSTRUCTION AREA FOR RESIDENTS
AND EMERGENCY VEHICLES.
19. THE CONTRACTORS SHALT. PROVIDE AND MAINTAIN AN EFFECTIVE
MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
20. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD,
SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR
WRITTEN APPROVAL
21. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL
OF THE CITY INSPECTOR.
22. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION.
FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING
OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS
OBTAINED.
23. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES
FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE
SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE
SWALES ENTERING OR LEAVING IMPROVEMENTS.
1
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REV.
24. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE,
COLOR AND, FINISH TO MATCH EXISTING CONCRETE.
25. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY
WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER.
26. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL. EXPOSE EXISTING
FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS CITY
APPROVAL OF CONNECTIONS TO EXISTING FACILI71ES DOES NOT IMPLY
CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
27. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE
PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER
AND ALL AFFECTED AGENCIES IMMEDIATELY.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING
STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND
APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT
PAVEMENT PRIOR TO PLACEMENT.
31. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL
BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON
COMPLETION OF PAVING.
32. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE
ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL
DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
33. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO
THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO
THE CITY ENGINEER.
34. MINIMUM D -LOAD FOR ALL RCP IS 1350.
Cm OF FONTANA. tMLff NOnLICARON LIST
CITY OF FONTANA
S.B.C. INC.
ATT: BRIAN WREN
3939 E. CORONADO STREET
8353 SIERRA AVENUE
ANAHEIM, CA 92807
FONTANA, CA 92335
(714) 666-5500
(909) 350-6632
POT HOLE ELEVATION
BC/EC
UNDERGROUND SERVICE ALERT
SO. CALIF. GAS COMPANY
(800) 422-4133
1981 W. LUGONIA AVENUE
RIGHT OF WAY
REDLANDS, CA 92374
CRAWFORD CANYON MUTUAL WATER CO.
(909) 335-7547
ATTN.- BASIL J. FABRIZIO
EMERGENCIES: (800) 427-2200
(909) 463-9580
SO. CAUF. EDISON COMPANY
1 EA
300 N. PEPPER AVENUE
VERIZON (TELEPHONE)
RIALTO, CA 92376
1400 E PHILIPS BLVD.
820-5598 - UNDERGROUND
ONTARIO, CA 91766
1909
909 875-5100 - TRANSMISSION
(800) 483-4000
213 637-1233 - PIPELINES
909 357-6505 - DISTRIBUTION
FONTANA WATER COMPANY
ADELPHIA
1500 S. AUTO CENTER DRIVE
ONTARIO, CA 91761
(909) 481-1115
LEGEND
8440 NUEVO AVENUE
FONTANA CA 92235
(909) 822--2201
FAX: (909) 823-5046
44) INDICATES PROPOSED FIRE HYDRANT
( ) INDICATES EXISTING ELEVATION
12+00.00 ST INDICATES STREET STATIONING
PRPIATE ENGINEER'S NOTla TO CONTRACTOR:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES AND OR STRUCTURES
SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS.
THESE LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR,
SO T14AT ANY NECESSARY ADJUSTMENT CAN BE MADE IN AUGNMENT AND/OR GRADE
OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER
LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, HE WILL BE REQUIRED TO ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND
PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS. CONSTRUCTION CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY
AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE
OF THE DESIGN PROFESSIONAL
UNAUTHORIZED CHANCES AND USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE
FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE
PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARE]? OF THESE PLANS.
REVISION DESCRIPTION
DATE I ENGR.I CITY I DATE
PROPOSED
PAVEMENT
STRUCTURAL
SECTION �----
CONCRETE
BACKFILL --
(560-C-3250)
BEDDING
SHOULD CONSTRUCTION OF REQUIRED
MOVEMENTS NOT COMMENCE WITHIN
TWO YEARS OF THE DATE OF APPROVAL
Fee
SHOWN HEREON AND CARRIED FORTH IN A
DIUGENT MANNER, THE CITY ENaNEER MAY
REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT
TRrtir_u
CITY OF FONTANA
OFFSITE STORM DRAIN
VT4F.-* A C+T lllilll
BASIN
INDEX MAP
sru.E , =80'
SHEEP INDEX
TITLE SHEET SHT 1
LINE 'B" SHT 2
UNE 'C' & LAT 'C-1SHT 3
DETAILS SHT 4
I BARS 0
12' 0. C.
-1' THICK COMPRESSIBLE
MATERIAL
UNDISTURBED SOIL (TYP.)
CONCRETE ENCASEMENT DETAIL 16
SfIlE. MS
LONGITUDINAL
ELM
AVENUE
RANCHO
CUC&WNCA
VICINITY W
N.T.S.
:CT
TION
CONSTRUCTION NOTES ESTIMATE OF QUAMES
• INSTALL 66" RCP (1600-0)
DIRECTION OF FLOW
INSTALL 24" RCP (1500--0)
STREET LIGHTS
- - --
HGL (HYDRAULIC GRADE LINE)
INV
INVERT ELEVATION
PH
POT HOLE ELEVATION
BC/EC
BEGIN CURVE/END CURVE
BOT
BOTTOM
-•-- - --
RIGHT OF WAY
44) INDICATES PROPOSED FIRE HYDRANT
( ) INDICATES EXISTING ELEVATION
12+00.00 ST INDICATES STREET STATIONING
PRPIATE ENGINEER'S NOTla TO CONTRACTOR:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES AND OR STRUCTURES
SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS.
THESE LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR,
SO T14AT ANY NECESSARY ADJUSTMENT CAN BE MADE IN AUGNMENT AND/OR GRADE
OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER
LINES NOT ON RECORD OR NOT SHOWN ON THESE PLANS.
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, HE WILL BE REQUIRED TO ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND
PROPERTY. THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS. CONSTRUCTION CONTRACTOR FURTHER
AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY
AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF
WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE
OF THE DESIGN PROFESSIONAL
UNAUTHORIZED CHANCES AND USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR LIABLE
FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE
PLANS MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARE]? OF THESE PLANS.
REVISION DESCRIPTION
DATE I ENGR.I CITY I DATE
PROPOSED
PAVEMENT
STRUCTURAL
SECTION �----
CONCRETE
BACKFILL --
(560-C-3250)
BEDDING
SHOULD CONSTRUCTION OF REQUIRED
MOVEMENTS NOT COMMENCE WITHIN
TWO YEARS OF THE DATE OF APPROVAL
Fee
SHOWN HEREON AND CARRIED FORTH IN A
DIUGENT MANNER, THE CITY ENaNEER MAY
REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH
CONDITIONS AND STANDARDS IN EFFECT
TRrtir_u
CITY OF FONTANA
OFFSITE STORM DRAIN
VT4F.-* A C+T lllilll
BASIN
INDEX MAP
sru.E , =80'
SHEEP INDEX
TITLE SHEET SHT 1
LINE 'B" SHT 2
UNE 'C' & LAT 'C-1SHT 3
DETAILS SHT 4
I BARS 0
12' 0. C.
-1' THICK COMPRESSIBLE
MATERIAL
UNDISTURBED SOIL (TYP.)
CONCRETE ENCASEMENT DETAIL 16
SfIlE. MS
LONGITUDINAL
ELM
AVENUE
RANCHO
CUC&WNCA
VICINITY W
N.T.S.
:CT
TION
CONSTRUCTION NOTES ESTIMATE OF QUAMES
• INSTALL 66" RCP (1600-0)
610 LF
INSTALL 24" RCP (1500--0)
126 LF
REMOVE EXISTING BRICK AND MORTAR PLUG
1 F -A
JOIN EXISTING PIPE
I EA
CONSTRUCT BRICK AND MORTAR PLUG PER DETAIL HEREON
1 EA
REMOVE & REPLACE EXISTING CURB & GUTTER
15 LF
PROTECT EXISTING CURB & GUTTER
615 LF
PROTECT EXISTING BLOCK WALL
1 EA
EXISTING WATER TO BE ENCASED PER DETAIL ON SHEET 1
2 EA
CONSTRUCT MANHOLE PER A.P.W.A. STD PLAN 320--1
2 EA
CONSTRUCT TRANSITION STRUCTURE PER A R W.A. STD PLAN 340-1
1 EA
CONSTRUCT 50 LB. ROCK 15" THICK WITH FILTER BLANKET 5' X 15' WIDE
1 EA
CONSTRUCT SINGLE PIPE HEADWALL PER CALTRANS STD DWG. D89
1 EA
INSTALL 30' RCP (1500-0)
72 LF
REMOVE EXISTING BLOCK WALL & REPLACE PER DETAIL ON SHEET 4
15 LF
CONSTRUCT CONCRETE ENCASEMENT PER DETAIL HEREON
123 LF
TOP OF STRUCTURAL
PAVEMENT SUBGRADE
1:1 SLOPE OR FLATTER
OR ADEQUATE SHORING
GRANULAR BEDDING FROM SELECTED '
TRENCH SIDE MATERIAL (1' MAX SIZE) �\
sox coMaacTEn w►rn
BACKFILL 6' MAX SIZE
6" MIN. {-
N
-r ...-., . -" -rl ..27- . 777 !
cv w
GRANULAR BEDDING FROM SELECTED •-- z .
LO
CONCRETEENCASEMENT
TRENCH SIDE MATERIAL FOR PIPE 109 OR GREATER IN DEPTH USE 1/2 w 4
SCALE: NTS CRUSHED STONE BEDDING
BASIS OF BEARINGS:
BEARINGS ARE BASED ON THE CENTERLINE OF BEECH AVENUE
BEING NORTH 00'21'45" EAST AS SHOWN ON TRACT 16477, RECORDED IN
MAP BOOK 298, PAGES 59-62, RECORDS OF SAN BERNARDINO COUNTY.
PREPARED FOR:
vw Miura I uc
10370 TRADEMARK STREET
RANCHO CUCAMONGA
CA 91730
TEL 909 291-7600
FAX 909 291-7630
BENCH"K
CITY OF FONTANA BENCHMARK NO. 360
A NAIL IN POLE NO. 1563704E AT THE
SOUTHWEST CORNER OF LIME AVENUE
AND 13ASEUNE AVENUE.
ELEVATION 1376.03
SECTION AwA
�-DOUBLE COURSE
4 X 8 BRICK
AND MORTAR PLUG
BRICK AND MORTAR PLUG
TYPICAL FOR ALL DIAMETERS
NTS
STORM DRAIN
PIPE
Z
m m
BRICK AND
MORTAR PLUG -NOTES.-
1.
NOTES:1. TRENCH WIDTH SHALL BE CONTROLLED
RCP TO TOP OF PIPE ZONE
2. TRENCH DEPTHS OF GREATER THAN 5'
SHALL HAVE ADEQUATE SHORING
3. CLASS 11 AGGREGATE BASE ALL TRENCHES
LESS THAN 100 FEET IN LENGTH
QRof Ess I'
S 11���
co O �� G�
z
DRAWN BY:
No. 43976 m AE
* Exp. 6/30/07 DESIGNED BY:
RC �
C I V I L �<'�P CHECKED BY:
OF CALL F LA ml
NOTE:
COMPACTION SHALL BE 90% IN ALL ZONES
UNLESS OTHERWISE SPECIFIED. TRENCH STABILITY
SHALL CONFORM TO CAL -OSHA REQUIREMENTS
TRENCH DETAIL
x,s
3" MAX. SIZE
NATIVE SOIL
COMPACTED 959:
CITY OF FONTANA, CALIFORNIA
RANCHO FONTANA SPECIFIC PLAN
TRACT N016992 SCALE: AS NOTED
OFFSlT� STORM DRAIN IMPROVEMENT PLANS DATE:
TITL SHEET JULY, 2005
%wpP DRAWING NO.: �
4�P a�-
CI GINEER R.C.E 51152 3%8� 4
Filename: M:\dwg\15928\FlNAI_ DESIGN\STORK DRAIN\OFFSITE\LSD0I.DWC
.I
SECTION AwA
�-DOUBLE COURSE
4 X 8 BRICK
AND MORTAR PLUG
BRICK AND MORTAR PLUG
TYPICAL FOR ALL DIAMETERS
NTS
STORM DRAIN
PIPE
Z
m m
BRICK AND
MORTAR PLUG -NOTES.-
1.
NOTES:1. TRENCH WIDTH SHALL BE CONTROLLED
RCP TO TOP OF PIPE ZONE
2. TRENCH DEPTHS OF GREATER THAN 5'
SHALL HAVE ADEQUATE SHORING
3. CLASS 11 AGGREGATE BASE ALL TRENCHES
LESS THAN 100 FEET IN LENGTH
QRof Ess I'
S 11���
co O �� G�
z
DRAWN BY:
No. 43976 m AE
* Exp. 6/30/07 DESIGNED BY:
RC �
C I V I L �<'�P CHECKED BY:
OF CALL F LA ml
NOTE:
COMPACTION SHALL BE 90% IN ALL ZONES
UNLESS OTHERWISE SPECIFIED. TRENCH STABILITY
SHALL CONFORM TO CAL -OSHA REQUIREMENTS
TRENCH DETAIL
x,s
3" MAX. SIZE
NATIVE SOIL
COMPACTED 959:
CITY OF FONTANA, CALIFORNIA
RANCHO FONTANA SPECIFIC PLAN
TRACT N016992 SCALE: AS NOTED
OFFSlT� STORM DRAIN IMPROVEMENT PLANS DATE:
TITL SHEET JULY, 2005
%wpP DRAWING NO.: �
4�P a�-
CI GINEER R.C.E 51152 3%8� 4
Filename: M:\dwg\15928\FlNAI_ DESIGN\STORK DRAIN\OFFSITE\LSD0I.DWC