HomeMy WebLinkAbout3776-2EXIST. I" HATER METER, FLOY4 SEWR I I
MASTER VALVE AND R.P. PER APPROVED I I
LMO PLANS NO. 3165. CONTRAGTQI� TO ( I
VEIRIFY LOCATION, SIZE AND I I I
! AVAILABLE PRESSURE PRIOR TO
CON5TRUCiTION. I ( !
I I {
CONTRACTOR TO MAKE P.O.G. I 1
AT EXIST. I-1/2" 56H 40
IRRIGATION MAINLINE I I
PER APPROVED LMD
I
PLANS NO. 3165 I I
! I I I
RUN NEN CONTROL VALVE k0R6 f5TA. -4r-0) TO I I
1 EXIST. NETWORK 6000 CONTR&LER. I I
PER APPROVED LMV PLk6 NO. 3165. I 1
CONTRACTOR TO VERIFY LOC,VON IN FIELD. I I
! I I
I 1 I
I I i
I I I I I I I
I ( I I I I I I
1 I I I I I I
1
I i I I
1 I I I I I I 1
I 1 I ( I I I I
i I I I I I I
I I I I
I I I I
I I I I { I (
I I i 1
I I I I
I I I 1 { I ! I
I I ( { I { I I
IRRIGATION WEVFIGATI9
ALL WORK SHALL BE IN ACCORDANCE WITH THE CITY OF FONTAW5 LANDSCAPE DEVELOPMENT
STANDARD LANDSCAPE SPECIFICATION MANUAL FOR STREETSCAPE3 AND PARKS.
VERIFY ALL CONDITIONS AND DIMENSIONS PRIOR TO COMMENCING ANY WORK, NOTIFY THE
LANDSCAPE ARCHITECT IMMEDIATELY IF ANY DISCREPANCY 15 FOUL. CONTRACTOR SHALL
THOROUGHLY FAMILIARIZE HIMSELF WITH ALL SITE CONDITIONS PRIOR TO BIDDING OR
COMMENCINO WORK.
EXTREME GARS SHALL BE EXERCISED NHEN HOR KINO ADJACENT TO ANY 5TFJXTURE5 OR
UTILITIES. CONTRACTOR SHALL Be RESPON51BLE FOR LOCATING ALL EXI5TING UTILITIES AND
REPAIRING ANY DAMAGES CAUSED BY HIS WORK AT NO COST TO TIt OWNER.
IRRIGATION oMI6015 BASED ON AH AVAILABLE WATER PRESSURE OF 40 P.5.1. ki" A
MAXIMUM 5Y5TEM DEMAND OF III G.P.M. GONTRA6TOR SHALL VERIFY DATA PRIOR TO
COMMEW-40 WORK. kiATER AVA1LABiL1TY INFORMATION WAS OBTAINED FROM FONTANA WATER
COMPANY.
MAKE POINT OF CONNECTION AS SHORN ON THE PLANS AND RUN A
1-1/211 SCFE 40 P.V.C. MAINLINE 16" DEEP TO AREAS. MERE VALVES ARE LOCATED. INSTALL A
LINE SIZED GATE VALVE IN A ROUND PLASTIC BOX AT P.O.C. roR EMERGENCY SHUT -OFF -
THE LANDSCAPE ARCHITECT SHALL BE RESPONSIBLE FOR THE INTERPRETATION OF THE
DRAWIN6,55 SHOULD A QUESTION ARISE.
PIPING SHOWN ON THE PLANS 15 ESSENTIALLY DIAGRAMMATIC, ROUTE PIPING AND LOCATE
VALVES TO AVOID CONFLICT WTH STATIONARY ELEMENTS. "Vt VERTICAL 006TRUOTI01
(FIRE HYDRANTS, LIGHTS, TREES ETC) INTERFERE NTH THE SPRAY PATTERN OF THE HEADS,
THE IRRIGATION CONTRACTOR SHALL FIELD ADJUST THE SPRINKLER SYSTEM AT NO ADDITIONAL
COST TO THE OkftR, BY 1NSTALLINS A QUARTER OR HALF HEAD SPRINKLER ON EA6.H SIDE OF
THE OBSTWCTION 50 AS TO PROVIDE PROPER COVERAGE. LOCATE ALL VALVES AND BACKFLOH
DEVICE IN SHRUB BEDS WHERE POSSIBLE.
FIRING FROM THE CONTROLLER TO THE VALVES SMALL BE DIRECT BURIAL. A.F.W., MINIMUM
14 GAUGE. PROVIDE CONTINUOUS SPARE MIRES TO VALVE(S) FURTHEST FROM THE
CONTROLLER. LOOP WIRE INTO EACH VALVE BOX ALONG THE MAINLINE NTH A MIN. 30"
EXPANSION COIL. SPARE HIRE IS TO BE A DIFFERENT COLOR FROM OTHER CONTROL WIRES.
LABEL WIRE SPARE IN CONTROLLER,
PROVIDE CHECK VALVES AS NEEDED TO ELIMINATE ALL LOW HEAD DRAINAGE.
ALL EQUIPMENT SHALL BE A5 LISTED IN THE LEGEND. SU13STITUTION5 HILL NOT BE
PERMITTED HIT14OUT PRIOR APPROVAL OF THE LANDSCAPE ARCHITECT.
CONTRACTOR SHALL PROVIDE COMPLETE AND ACCURATE- RECORD ORAHIN665 TO THE CITY UPON
COMPLETION OF THE PROJECT. PRANN65 SHALL INDICATE ANY CHA146CO FROM THE ORIGINAL
PLANS AND DIMEWION5 OF VALVES, QUICK. COUP ERS; CONTROLLM AND ALL OTHER
EQUIPMENT FROM STATIONARY POINTS OF REFERENCE.
DESICGN INTENT 15 TO PROVIDE COMPLETE IRRIGATION COVERAGE TO ALL PLANTED AREAS, AS
FIELD CHANCE MAY OCCUR, CONTRACTOR 15 REOVIRED TO PROVIDE I0096 COVERAGE TO ALL
AREAS. IN NO INSTANCE SHALL HEAD SPA61N6 EXCEED 5595 OF MANUFACTURER'S RECOMMENDED
SPACING FOR COVERAGE. CONTRACTOR SHALL NOT KNOY41NOLY INSTALL A SPRINKLER SYSTEM
WITH IMPROPER COVERAGE, FAILURE TO NOTIFY THE LANDSCAPE ARCHITECT SHALL RESULT IN
THE CONTRACTOR REPAIRINO/REPLACINO SAID SYSTEM AT HIS OR HER EXPENSE.
ALL SPRINKLER HEADS INSTALLED ADJACENT TO CURBS AND NALK5 SHALL BE POP-UP TYPE.
IN NO INSTANCE SHALL RISER TYPE SPRINKLERS BE INSTALLED ADJACENT TO PEDESTRIAN
AREAS.
THE CONTRACTOR SHALL FLU544 AND ADJU5T ALL SPRINKLER HEADS FOR OPTIMUM PERFORMANCE
AND TO MINIMIZE OVERSPRAY ONTO KALKgr ROADInIAYS AND/OR. BUILDINGS. TH15 SHALL
INCLUDE 5ELECTINO THE BEST DEGREE OF ARG TO FIT THE EX15TINO 51TE CONDITIONS AND
TO THROTTLE THE FLOH CONTROL AT EACH VALVE TO OBTAIN THE OPTIMUM PRESSURE FOR EACH
SYSTEM.
ALL PIPIN6 AND NIRIN6 UNDER PAVING SHALL BE SLEEVED IN A 5614.40 PVC PIPE, 51ZE
A5 REQUIRED AND WITH. A MIN" COVER TO FINISHED PAVEMENT GRADE OF 2411
.
ALL EQUIPMENT SHALL BE INSTALLED PER DETAILS, IN THE ABSENCE OF DETAILS,
INSTALLATION SHALL BE IN ACCORDANCE NTH THE: STANDARD PRACTICE OF THE TRADE.
CONTRACTOR SHALL GUARANTEE ALL MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE YEAR
FROM DATE OF FINAL ACCEPTANCE BY THE OWNER.
PROVIDE A COLOR COVED LAMINATED CONTROLLER CHART IN THE CONTROLLER SHONIN6 THE
VALVES AND AREAS SERVED BY EACH VALVE.
BEFORE BEGINNING CONSTRUCTION, THE CONTRACTOR MUST OBTAIN ALL NECESSARY PERMITS
FROM THE CITY.
THE IRRIGATION SYSTEM MILL BE TESTED BY THE ONNERS REPRESENTATIVE IN THE FIELD
BEFORE FINAL APPROVAL.
INSTALL ALL COMPONENTS PER CURRENT U.P.G. AND LOCAL CODES.
CONTRACTOR SHALL MAINTAIN A CLEAN AND SAFE NORKING ENVIRONMENT. DAY AND NICHT
BARRICADES MUST BE PROVIDED FOR. ALL OPEN TRENCHES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTAOTING THE UNDERGROUND SERVICE ALERT
AT I$00-422-4133 AT LEAST 48 HOURS PRIOR TO TRENCHING FOR EXACT UNDERGROUND
UTILITY LOCATIONS. THE CONTRACTOR A55UME5 ALL RESPONSIBILITY FOR THE REPAIR OR
REPLACEMENT OF UNDERGROUND UTILITIES OR STRUCTURES hWICH ARE DAMAGED DURING THE
COURSE OF COMPLETING TH15 WORK.
REFER TO SHEET 4 FOR CONSTRUCTION DETAILS
CONTROLLER
FRICTION (PSI L.099) VALVE NO. M Iq 6PM
I" WATER METER 2.0
1-1/4"" I.3ACICFLOH PREVENTER 12.50
ELEVATION CHANGES: -
LATERAL LINES 2.0
MAIN LINE (600 LF) 6.0
PITTIN65 (20% OF MAIN LINE) 1.20
1-1/2" VALVE 2.6
M(SG. 2.0
TOTAL PSI LOSS 28.30
WATER PRESSURE 90 P.S:1.
LESS TOTAL PSI LOSS 28.30
EQUALS
MINIMUM TO FARTHEST HEAD
SPRINKLER OPERATING PRESSURE
RESIDUAL HATER M55URE
6I. -to
30.00
5t."70
NOTE: PRESSURE TO BE REGULATED TO `10 i'.5.1. AFTER RP DEV15E
INFORMATION OBTAINED FROM LIVID DWG. No. 3165
20 0 20 40 60
Scale 1 " = 20'
IRRIOATION EQU I PMENT LEGEND
5YM
®
DE50RIPTION
POP-UP SPRAY SPRINKLER
MANW.
RAIN BIRD
MODEL
1806 5AM-PR5-5Q
PSI OPM RAD.
30 0.10 5'
MOTES
ADJUST AS REQUIRED, SEE DETAIL A SHEET 4
8
POP-UP SPRAY SPRINKLER
RAIN BIRD
1606 -SAM -PRS -5H
30 0.20 5'
ADJUST A5 REQUIRED, 5EE DETAIL A SHEET 4
POP-UP SPRAY SPRINKLER
RAIN BIRD
1812-5AM-PRS-IOQ
30 0.39 10'
ADJUST AS REQUIRED, SEE DETAIL A SHEET 4
El
POP-UP SPRAY SPRINKLER
RAIN BIRD-
1612-5AM-PRS-10H
30 0.19 10'
A0JU5T AS REQUIRED, SEE DETAIL A SHEET 4
e
POP-UP SPRAY SPRINKLER
RAIN BIRD
1812-SAM-PRS-I0VAN
30 VARIES 10'
ADJUST A5 REQUIRED, SEE ,DETAIL A SHEET 4
0
POP-UP SPRAY SPRINKLER
RAIN BIRD
I6I2-SAM-PR5-I555T
30 VARIES 41X301
ADJUST AS REQUIRED{ SEE DETAIL A SHEET 4
�]
ELECTRIC CONTROLLER
TORO
E EX15T1I t TE NITROLLER
EXISTING -PER DWG. No. 3165
®
ELECTRIC METER
EXISTING -PER DWG. No.. 31.65
®
RAIN SHUT-OFF DEVICE
EXISTING -PER DRG. No. 3165
--
GATE VALVE
NIBCO
T -113 -LINE SIZED
SEE DETAIL G SHEET 4
IRRIGATION CONTROL VALVE
SUPERIOR
95OPH SERIES -SIZE A5 SHOWN
SEE DETAIL 13 SHEET 4 AND NOTE BELON
iV
R. P. BACKPLON PREVENTER
HILKINS
-1 - Y�IY STRAI
SL 6ALATOR
SEMS.
T -
SEE
Q
QUICK COUPLER VALVE
RAINBIRD
330RC (3/4")
SEE DETAIL D SHEET 4
MASTER VALVE
SUPERIOR
1-1/2"-3000 SERIES -NORMALLY OPEN
EXISTING -PER DRG. No. 3165
(D
FLOH SEN50R
DATA INDZTRIAL
22OP-1-1/2"
--
EXISTING -PER DWG. No. 3165 - —
Q3
SPARE COMMON AND PILOT kiRE5. COLOR TO DIFFER FROM SITE HIRING- SEE WRITTEN SPECIFICATIONS SHEET 2
®
EXIST. 1" WATER METER
CONFIRM LOCATION IN THE FIELD
�-
SCH. 401:11,/6 PIPEMIRE SLEEVE UNDER ALL PAVING
BURY MIN. 240 -SIZE PER CHART
--
1-1/2" 561440 PYC MAINLINE
BURY MIN. 1.6"
SCH 40 PVC LATERAL LINE
BURY MIN. 12"
3 VALVE NUMBER
.2 VALVE DEMAND GPM)
VALVE SIZE
PIPE SIZELEGEND
_ ........ _..._ ...
- 1 3/41
_m I"
4
NOTE: NO PIPE SIZES SMALLER THAN 3/4"
NOTE: CONTRACTOR TO CONFIRM THE F..XISTANGE OF PRE55URE
REGULATOR AT R.P. DEVICE. IF PRESSURE REGULATOR NA5 NOT
INSTALLEP CONTRACTOR SHALL INSTAL REGULATORS AT CONTROL
VALVES (SUPERIOR MODEL: 950-DWPRS
REFER TO SHEET 4 FOR CONSTRUCTION DETAILS
CONTROLLER
FRICTION (PSI L.099) VALVE NO. M Iq 6PM
I" WATER METER 2.0
1-1/4"" I.3ACICFLOH PREVENTER 12.50
ELEVATION CHANGES: -
LATERAL LINES 2.0
MAIN LINE (600 LF) 6.0
PITTIN65 (20% OF MAIN LINE) 1.20
1-1/2" VALVE 2.6
M(SG. 2.0
TOTAL PSI LOSS 28.30
WATER PRESSURE 90 P.S:1.
LESS TOTAL PSI LOSS 28.30
EQUALS
MINIMUM TO FARTHEST HEAD
SPRINKLER OPERATING PRESSURE
RESIDUAL HATER M55URE
6I. -to
30.00
5t."70
NOTE: PRESSURE TO BE REGULATED TO `10 i'.5.1. AFTER RP DEV15E
INFORMATION OBTAINED FROM LIVID DWG. No. 3165
20 0 20 40 60
Scale 1 " = 20'