HomeMy WebLinkAbout3758-11
AW
�he;i� .aa0.i,i1 ,::iM,M1ip+i%� r'.ik' r eW. w r n;..F+ .Ixm✓ .�:�� �::d nk+�.
� � 1 1 1 , • � 1
A.
At
C-�s
GENERAL NOTES:
City Required Notes:
Inspections:
1. It is the landscape Contractor`s responsibility to contact the
Engineering Division's Landscape inspector
48 hours Prior to desired inspection of an item at (909)350-6633.
2. Prior to release of utilities or, maintenance period commencement
following inspections are required.
Pre -construction meeting
Inspection of irrigation system in open trench condition (prior to backfill).
Mainline pressure test @ 150 p.s.i. for a three (3) hour period.
Irrigation coverage tests including initial and final tests.
Finish grade prior to planting.
Plant materials prior to planting.
Planting, including street trees. Contact the Parks Planning and Landscape
Development section Engineering Division, for species and final locations.
3. The Owner's representative and landscape contractor shall be present at each inspection.
Maitenance Guidelines
til �
® ®OF 7- C P , " LE
,®
s�0-001 00-10'
Landscape 3195—B Airport Loop Dr., (949) 644-9370
Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140
& Planning Richard Polhamus, License # 2782
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but
not be limited to:
1. cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants as necessary to control and direct growth
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for
proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain food working condition.
8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of t mnk or branches.
9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering division Landscape inspection Staff. The
landscape shall be maintained in accordance with these landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
Underground Service Alert
r
Call: TOLL FREE
a
1-800
422-4133
TWO WORKING DAYS BEFORE YOU MG
1A
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
STANDARDS c.. -%& PES INC.CANNOT GUARANTY THE
ARCH'TECTURAI
QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER.
VICINITY MAP
1�
ZS
\� SUMMIT �
AVENUE
�
W
CURTISQ
J
Q
U
HIGHLAND AVENUE
BASELINE
SHEETS L3, L5 & L9
SHEETS L2, L4 & L8
A VEND,
N. T.S.
PARK
SHEET INDEX
T-1 TITLE SHEET
L-1 CONSTRUCTION PLAN
L- 2 CONSTRUCTION PLAN
L- 3 PLANTING DETAILS, LEGEND &NOTES
L-4 PLANTING PLAN
(TREES & GROUNDCOVER)
L- 5 PLANTING PLAN
(TREES & GRQUNDCOVER)
L- 6 PLANTING PLAN
(SHRUBS & VINES)
L- 7 PLANTING PLAN
(SHRUBS & VINES)
L- 8 IRRIGATION DETAILS
L- 9 IRRIGATION DETAILS, NOTES &LEGEND
L-10 IRRIGATION PLAN
L-11 IRRIGATION PLAN
L-12 IRRIGATION MAINLINE PLAN
L-13 SPECIFICATIONS
Total square footage of landscape area = 31,750 S.F.
I e 1 (0
X 39
CITY OF FONTANA
ii DSCti.rE PLANTS
=AWN IN' CURTIS AVE. / CATAy' BA AVE. / S SHOWN
SIE S ]P WAY 11,,
N. T. S.
/01
CHECKED BY, APPROVED BY, His 1
Cm ENGDiEER R.C.E. e=ft EXP. DATE 3758 1.