Loading...
HomeMy WebLinkAbout3162-1AF DE LANDSCAPE ARCHITECTURAL CONSTRUCTION DOCUMENTS FOR 1�7edians SOUTH HERITAGE CIRLE TO CHERRY AVENUE City of Fontana, California CITY REQUIRED NOTES: INSPECTIONS: 1 • It is the Landscape Contractor's responsibility to contact the Engineering Division's Lar�decape Inspscicr 40 hours prior to deeirrod Inspsobo i of an Iw at 3604= 2 Prior to release of utilities or maintenanoe period oommencarnent, the following ir►spsotions are nKWiffl* Pre -Construction Meeting of irrigation system in open lrerwh oondilion (prior to W. blair�it�s pressure test b 1 s0 P.S. I. for a three (3) hex continuous period. i Igatbn ooruerap taft ince mW and final iris. Flrnsh grade prior to planting. Plant materials prior to planting and soil preparation. Ptantll 1g, tnchxitng street trees. Contact the Partes P 9 LarKfsoif e Dawk0parrr! Section, Engineenng Division, for species and final locations. Cornpltar�oe wilh approver plana. 3. FlnalInspection. The Owner's and landscape contractor shall be present at each inspecrtion. MAINTENANCE Cit TIDE iN Q, Landscape shalt be maintained In a neat, aeon, weed -free and heap" =Wm This s� include bjA riot he limited to: 1. Cu�ivalion of pIn d beds at iniervab not to wowed ion (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (wild vary with species). 3. Regular pnmirig of plants as necessary to oortrol and direct growth. 4. "ed'uted maintenance of k6gatlon controller to assure proper applfcatton rate of water necessary for proper plant growth. Drip irrigation malt req specialized landscape maintenance care. S. �nenedisN rop�snt of irriplion rnMerimb as needed to mairtin working o good worl�oradf o w. e. FertTzation on a regular schedule as recommended by the manufacturer to provide proper PIA" growth. 7. Immediate r air or leplaceri of irrigation materials as needed to maintain good workkv s. Stakes, guys & ties on trees shah be checked regularly for correct function. Ties we to be adWded to avioid abrasions or girdling of tnxrk or branches. 9. Yponcompletion of three (3) month (90 day) contract maintenance period, an inspection hall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be ------ ainad in accordance adth these Iaruiscape maintenance standards. 10. The L?ewl- a is nspansbis to oorrlaat the Cly and schaduls the nwAintenarrca inspection. H. P. High Point W/ With Hgt. Height W/0 Without I. D. Inside 0hura ter W.S. Wates S Inv. Invert VICINITY MAP: L-1 L-2 L-3 L-4 L-5 L-6 L-7 L-8 TITLE SHEET CONSTRUCTION PLAN CONSTRUCTION DETAILS IRRIGATION PLAN PLANTING PLAN IRRIGATION AND PLANTING DETAILS CONSTRUCTION SPECIFICATIONS IRRIGATION AND PLANTING SPECIFICATIONS Underground Service Alert CaU: TOLL FREE 1=800 422-4133 TWO WORKING DAYS BEFORE YOU DIG IIIII • • • • „• - 1, �� ♦ ♦ ♦ • Now • • APPHOVALS: #O % D iREfl OF TME REQU IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CWORMANCE WITH CONDITION AND ST IN EFFECT. �* o : c A P r ± o �� . urn w,ka +��y 4V f" CIA 7si o * `rr2 rE OF C �`�� Q A. B. Anchor Boit Int. Integral BASELINE AVENUE MEDIANS SOl1TH HERITAGE CIRCLE TO C AVENUE Sic". WA A.C. Asphaltic Concrete J. Box Junction Box M No. 62 � a Adj. Adjacent Jts. Joints Alt. Alternate L. A. Landscape Architect Arch. Architect Lic. Licensed Auto. Automatic L. P. Low Point Bldg. Building Max. Maximum Blk. Black M. B. Machine Bolt B.M. Bench Mark Mech. Mechanical B.S. Bottom of Steps Med. Medium C. B. Catch Basin Min. Minimum C. F. Cubic Foot M. H. Manhole C.I. Cast Iron Multi. Multi -branched C. I. P. Cast Iron Pipe Nat. Natural . C.J. Cold Joint N.I.C. Not in Coreraot C. L. Center Line 0. C. On Center W CA r. Clearance 0. D. Outside Diameter pq n LZ C. 0. C.M.P. Clean Out Corrugated Metal Pipe P. A. Perf. Planting Area Perforated W BASELINE AVE. Comp. Compacted P.O.C. Point of Connection Q Con. Concrete P. S. 1. Pounds Per Square -- - — r-- -- _ _ _ ._ _ �_ _ _ _ _ _ _ Cond. Condition P.T. Pressure Treated W IW W I } Cont. Continuous P.V.C. Poly Vinyl Chloride Ct. Center R. Radius Q ;(� Ctr. Sink Counter Sink R.C.P. Reinforced Concrete D. D. Deck Drain Rebar Reinforcing Bar a 1 D.F. Douglas Fir Rein. Reinforcing D.G. Decomposed Granits Req'd. Required Dia. Diameter Ret. Retardant Dim. Dimension Rgh. Rough Dd. Detail R. S. Rough Sawn Ea. Each R.S.R. Rough Sawn Rsdw�ood Q E.J. Expansion Joint Rwd. Redwood Elec. Electric Sch. Schedule Elev. Elevation S. F. Square Foot Eng. Engineer Sht. Sheet Esp. Espalier Sht. Md. Sheet Metal Eq. Equal Sim. Similar E.W. Each Way S. L. Scoreline E. W. W. M. Electric Wetted Wire Nte Smth. Smooth Ex. Existing Specs. Specificatixs Exp. Exposed Sq. Square .F. F. Finish Floor Elevation StI. Steel F. G. Finish Grade T, A. D. Top of Area Drain F. H. Fire Hydrant T & B Top and Bottom Fin, Finish T. B. Top of Berm F.L. Flow Line T.C. Top of Curb Flt. Flat Tex. Textured F.S. Finish Surface T. G. Top of Grate Ftg. Footing T. G. D. Top of Grate Drain Ftn. Fountain Thk. Thick Ga. Gauge T. P. Top of Paving Gals. Galvanized T. P. C. Top of Poll Com G.C. Ground Cover T. S. Top of Steps G.I. Galvanized Iron T.W. Top of Wail H. B. Hose Bib TVA. Trowel Hdr. Ord. Header Board Typ, Typical Horiz Horizontal Vert Verticai CITY REQUIRED NOTES: INSPECTIONS: 1 • It is the Landscape Contractor's responsibility to contact the Engineering Division's Lar�decape Inspscicr 40 hours prior to deeirrod Inspsobo i of an Iw at 3604= 2 Prior to release of utilities or maintenanoe period oommencarnent, the following ir►spsotions are nKWiffl* Pre -Construction Meeting of irrigation system in open lrerwh oondilion (prior to W. blair�it�s pressure test b 1 s0 P.S. I. for a three (3) hex continuous period. i Igatbn ooruerap taft ince mW and final iris. Flrnsh grade prior to planting. Plant materials prior to planting and soil preparation. Ptantll 1g, tnchxitng street trees. Contact the Partes P 9 LarKfsoif e Dawk0parrr! Section, Engineenng Division, for species and final locations. Cornpltar�oe wilh approver plana. 3. FlnalInspection. The Owner's and landscape contractor shall be present at each inspecrtion. MAINTENANCE Cit TIDE iN Q, Landscape shalt be maintained In a neat, aeon, weed -free and heap" =Wm This s� include bjA riot he limited to: 1. Cu�ivalion of pIn d beds at iniervab not to wowed ion (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (wild vary with species). 3. Regular pnmirig of plants as necessary to oortrol and direct growth. 4. "ed'uted maintenance of k6gatlon controller to assure proper applfcatton rate of water necessary for proper plant growth. Drip irrigation malt req specialized landscape maintenance care. S. �nenedisN rop�snt of irriplion rnMerimb as needed to mairtin working o good worl�oradf o w. e. FertTzation on a regular schedule as recommended by the manufacturer to provide proper PIA" growth. 7. Immediate r air or leplaceri of irrigation materials as needed to maintain good workkv s. Stakes, guys & ties on trees shah be checked regularly for correct function. Ties we to be adWded to avioid abrasions or girdling of tnxrk or branches. 9. Yponcompletion of three (3) month (90 day) contract maintenance period, an inspection hall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be ------ ainad in accordance adth these Iaruiscape maintenance standards. 10. The L?ewl- a is nspansbis to oorrlaat the Cly and schaduls the nwAintenarrca inspection. H. P. High Point W/ With Hgt. Height W/0 Without I. D. Inside 0hura ter W.S. Wates S Inv. Invert VICINITY MAP: L-1 L-2 L-3 L-4 L-5 L-6 L-7 L-8 TITLE SHEET CONSTRUCTION PLAN CONSTRUCTION DETAILS IRRIGATION PLAN PLANTING PLAN IRRIGATION AND PLANTING DETAILS CONSTRUCTION SPECIFICATIONS IRRIGATION AND PLANTING SPECIFICATIONS Underground Service Alert CaU: TOLL FREE 1=800 422-4133 TWO WORKING DAYS BEFORE YOU DIG IIIII • • • • „• - 1, �� ♦ ♦ ♦ • Now • • APPHOVALS: #O % D iREfl OF TME REQU IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CWORMANCE WITH CONDITION AND ST IN EFFECT. �* o : c A P r ± o �� . urn w,ka +��y 4V f" CIA 7si o * `rr2 rE OF C �`�� Q PREPARED UNDER THE RYIMN 0F: DATE CITY OF FON TANA, CAUFORNIA TITLE SHEET ift W. DER BASELINE AVENUE MEDIANS SOl1TH HERITAGE CIRCLE TO C AVENUE Sic". WA DESIGNED DER DATE; 5/10102 CHECKED AF '�: v Y, s DAT!!S• �• � )AA M No. 62 � a TING CITY ENGINEER LAnroscaPE ARCH cTuHE SITE PLANNING 10621 CHURCH STREET • SUITE 106 RANCHO CUCAMONGA, CALIFORNIA 91730 PH. (909) 484-2900 FAX (909) 464-2802 0152 L-1 1 Cr • SHEETS !s . • 0 Z