HomeMy WebLinkAbout3162-1AF
DE
LANDSCAPE ARCHITECTURAL CONSTRUCTION DOCUMENTS
FOR
1�7edians
SOUTH HERITAGE CIRLE TO CHERRY AVENUE
City of Fontana, California
CITY REQUIRED NOTES:
INSPECTIONS:
1 • It is the Landscape Contractor's responsibility to contact the Engineering Division's
Lar�decape Inspscicr 40 hours prior to deeirrod Inspsobo i of an Iw at 3604=
2 Prior to release of utilities or maintenanoe period oommencarnent, the following
ir►spsotions are nKWiffl*
Pre -Construction Meeting
of irrigation system in open lrerwh oondilion (prior to W. blair�it�s
pressure test b 1 s0 P.S. I. for a three (3) hex continuous period.
i Igatbn ooruerap taft ince mW and final iris.
Flrnsh grade prior to planting.
Plant materials prior to planting and soil preparation.
Ptantll 1g, tnchxitng street trees. Contact the Partes P 9 LarKfsoif e Dawk0parrr!
Section, Engineenng Division, for species and final locations.
Cornpltar�oe wilh approver plana.
3. FlnalInspection.
The Owner's and landscape contractor shall be present at each inspecrtion.
MAINTENANCE Cit TIDE iN Q,
Landscape shalt be maintained In a neat, aeon, weed -free and heap" =Wm This s�
include bjA riot he limited to:
1.
Cu�ivalion of pIn d beds at iniervab not to wowed ion (10) days.
2.
Regular mowing to maintain lawn height not to exceed two (2) inches (wild vary with species).
3.
Regular pnmirig of plants as necessary to oortrol and direct growth.
4.
"ed'uted maintenance of k6gatlon controller to assure proper applfcatton rate of
water necessary for proper plant growth. Drip irrigation malt req specialized landscape
maintenance care.
S.
�nenedisN rop�snt of irriplion rnMerimb as needed to mairtin working o
good worl�oradf o w.
e.
FertTzation on a regular schedule as recommended by the manufacturer to provide proper
PIA" growth.
7.
Immediate r air or leplaceri of irrigation materials as needed to maintain good
workkv
s.
Stakes, guys & ties on trees shah be checked regularly for correct function. Ties we to be
adWded to avioid abrasions or girdling of tnxrk or branches.
9.
Yponcompletion of three (3) month (90 day) contract maintenance period, an inspection
hall be made by the Community Development Department Engineering Division Landscape
Inspection Staff. The landscape shall be ------ ainad in accordance adth these Iaruiscape
maintenance standards.
10.
The L?ewl- a is nspansbis to oorrlaat the Cly and schaduls the nwAintenarrca
inspection.
H. P. High Point W/ With
Hgt. Height W/0 Without
I. D. Inside 0hura ter W.S. Wates S
Inv. Invert
VICINITY MAP:
L-1
L-2
L-3
L-4
L-5
L-6
L-7
L-8
TITLE SHEET
CONSTRUCTION PLAN
CONSTRUCTION DETAILS
IRRIGATION PLAN
PLANTING PLAN
IRRIGATION AND PLANTING DETAILS
CONSTRUCTION SPECIFICATIONS
IRRIGATION AND PLANTING SPECIFICATIONS
Underground Service Alert
CaU: TOLL FREE
1=800
422-4133
TWO WORKING DAYS BEFORE YOU DIG
IIIII • • •
•
„• - 1, �� ♦ ♦ ♦ •
Now • •
APPHOVALS:
#O
% D iREfl OF TME REQU
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN
HEREON AND CARRIED FORTH IN A DILIGENT
MANNER, THE CITY ENGINEER MAY REQUIRE
REVISIONS TO THE PLANS TO BRING THEM INTO
CWORMANCE WITH CONDITION AND
ST IN EFFECT.
�* o : c A P r
± o �� . urn w,ka +��y
4V f"
CIA
7si o *
`rr2
rE OF C �`�� Q
A. B.
Anchor Boit
Int.
Integral
BASELINE AVENUE MEDIANS
SOl1TH HERITAGE CIRCLE
TO
C AVENUE
Sic".
WA
A.C.
Asphaltic Concrete
J. Box
Junction Box
M No.
62
�
a
Adj.
Adjacent
Jts.
Joints
Alt.
Alternate
L. A.
Landscape Architect
Arch.
Architect
Lic.
Licensed
Auto.
Automatic
L. P.
Low Point
Bldg.
Building
Max.
Maximum
Blk.
Black
M. B.
Machine Bolt
B.M.
Bench Mark
Mech.
Mechanical
B.S.
Bottom of Steps
Med.
Medium
C. B.
Catch Basin
Min.
Minimum
C. F.
Cubic Foot
M. H.
Manhole
C.I.
Cast Iron
Multi.
Multi -branched
C. I. P.
Cast Iron Pipe
Nat.
Natural
.
C.J.
Cold Joint
N.I.C.
Not in Coreraot
C. L.
Center Line
0. C.
On Center
W
CA r.
Clearance
0. D.
Outside Diameter
pq
n
LZ
C. 0.
C.M.P.
Clean Out
Corrugated Metal Pipe
P. A.
Perf.
Planting Area
Perforated
W
BASELINE AVE.
Comp.
Compacted
P.O.C.
Point of Connection
Q
Con.
Concrete
P. S. 1.
Pounds Per Square
-- - — r-- -- _
_ _ ._ _ �_ _ _ _ _ _ _
Cond.
Condition
P.T.
Pressure Treated
W IW
W I
}
Cont.
Continuous
P.V.C.
Poly Vinyl Chloride
Ct.
Center
R.
Radius
Q ;(�
Ctr. Sink
Counter Sink
R.C.P.
Reinforced Concrete
D. D.
Deck Drain
Rebar
Reinforcing Bar
a 1
D.F.
Douglas Fir
Rein.
Reinforcing
D.G.
Decomposed Granits
Req'd.
Required
Dia.
Diameter
Ret.
Retardant
Dim.
Dimension
Rgh.
Rough
Dd.
Detail
R. S.
Rough Sawn
Ea.
Each
R.S.R.
Rough Sawn Rsdw�ood
Q
E.J.
Expansion Joint
Rwd.
Redwood
Elec.
Electric
Sch.
Schedule
Elev.
Elevation
S. F.
Square Foot
Eng.
Engineer
Sht.
Sheet
Esp.
Espalier
Sht. Md.
Sheet Metal
Eq.
Equal
Sim.
Similar
E.W.
Each Way
S. L.
Scoreline
E. W. W. M.
Electric Wetted Wire Nte
Smth.
Smooth
Ex.
Existing
Specs.
Specificatixs
Exp.
Exposed
Sq.
Square
.F. F.
Finish Floor Elevation
StI.
Steel
F. G.
Finish Grade
T, A. D.
Top of Area Drain
F. H.
Fire Hydrant
T & B
Top and Bottom
Fin,
Finish
T. B.
Top of Berm
F.L.
Flow Line
T.C.
Top of Curb
Flt.
Flat
Tex.
Textured
F.S.
Finish Surface
T. G.
Top of Grate
Ftg.
Footing
T. G. D.
Top of Grate Drain
Ftn.
Fountain
Thk.
Thick
Ga.
Gauge
T. P.
Top of Paving
Gals.
Galvanized
T. P. C.
Top of Poll Com
G.C.
Ground Cover
T. S.
Top of Steps
G.I.
Galvanized Iron
T.W.
Top of Wail
H. B.
Hose Bib
TVA.
Trowel
Hdr. Ord.
Header Board
Typ,
Typical
Horiz
Horizontal
Vert
Verticai
CITY REQUIRED NOTES:
INSPECTIONS:
1 • It is the Landscape Contractor's responsibility to contact the Engineering Division's
Lar�decape Inspscicr 40 hours prior to deeirrod Inspsobo i of an Iw at 3604=
2 Prior to release of utilities or maintenanoe period oommencarnent, the following
ir►spsotions are nKWiffl*
Pre -Construction Meeting
of irrigation system in open lrerwh oondilion (prior to W. blair�it�s
pressure test b 1 s0 P.S. I. for a three (3) hex continuous period.
i Igatbn ooruerap taft ince mW and final iris.
Flrnsh grade prior to planting.
Plant materials prior to planting and soil preparation.
Ptantll 1g, tnchxitng street trees. Contact the Partes P 9 LarKfsoif e Dawk0parrr!
Section, Engineenng Division, for species and final locations.
Cornpltar�oe wilh approver plana.
3. FlnalInspection.
The Owner's and landscape contractor shall be present at each inspecrtion.
MAINTENANCE Cit TIDE iN Q,
Landscape shalt be maintained In a neat, aeon, weed -free and heap" =Wm This s�
include bjA riot he limited to:
1.
Cu�ivalion of pIn d beds at iniervab not to wowed ion (10) days.
2.
Regular mowing to maintain lawn height not to exceed two (2) inches (wild vary with species).
3.
Regular pnmirig of plants as necessary to oortrol and direct growth.
4.
"ed'uted maintenance of k6gatlon controller to assure proper applfcatton rate of
water necessary for proper plant growth. Drip irrigation malt req specialized landscape
maintenance care.
S.
�nenedisN rop�snt of irriplion rnMerimb as needed to mairtin working o
good worl�oradf o w.
e.
FertTzation on a regular schedule as recommended by the manufacturer to provide proper
PIA" growth.
7.
Immediate r air or leplaceri of irrigation materials as needed to maintain good
workkv
s.
Stakes, guys & ties on trees shah be checked regularly for correct function. Ties we to be
adWded to avioid abrasions or girdling of tnxrk or branches.
9.
Yponcompletion of three (3) month (90 day) contract maintenance period, an inspection
hall be made by the Community Development Department Engineering Division Landscape
Inspection Staff. The landscape shall be ------ ainad in accordance adth these Iaruiscape
maintenance standards.
10.
The L?ewl- a is nspansbis to oorrlaat the Cly and schaduls the nwAintenarrca
inspection.
H. P. High Point W/ With
Hgt. Height W/0 Without
I. D. Inside 0hura ter W.S. Wates S
Inv. Invert
VICINITY MAP:
L-1
L-2
L-3
L-4
L-5
L-6
L-7
L-8
TITLE SHEET
CONSTRUCTION PLAN
CONSTRUCTION DETAILS
IRRIGATION PLAN
PLANTING PLAN
IRRIGATION AND PLANTING DETAILS
CONSTRUCTION SPECIFICATIONS
IRRIGATION AND PLANTING SPECIFICATIONS
Underground Service Alert
CaU: TOLL FREE
1=800
422-4133
TWO WORKING DAYS BEFORE YOU DIG
IIIII • • •
•
„• - 1, �� ♦ ♦ ♦ •
Now • •
APPHOVALS:
#O
% D iREfl OF TME REQU
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN
HEREON AND CARRIED FORTH IN A DILIGENT
MANNER, THE CITY ENGINEER MAY REQUIRE
REVISIONS TO THE PLANS TO BRING THEM INTO
CWORMANCE WITH CONDITION AND
ST IN EFFECT.
�* o : c A P r
± o �� . urn w,ka +��y
4V f"
CIA
7si o *
`rr2
rE OF C �`�� Q
PREPARED UNDER THE RYIMN 0F:
DATE
CITY OF FON TANA, CAUFORNIA
TITLE SHEET
ift
W.
DER
BASELINE AVENUE MEDIANS
SOl1TH HERITAGE CIRCLE
TO
C AVENUE
Sic".
WA
DESIGNED
DER
DATE;
5/10102
CHECKED AF '�:
v Y,
s DAT!!S• �• �
)AA
M No.
62
�
a
TING CITY ENGINEER
LAnroscaPE ARCH cTuHE
SITE PLANNING
10621 CHURCH STREET • SUITE 106
RANCHO CUCAMONGA, CALIFORNIA 91730
PH. (909) 484-2900 FAX (909) 464-2802
0152
L-1
1 Cr • SHEETS
!s
. •
0
Z