Loading...
HomeMy WebLinkAbout3110-11. Contractor shall obtain a construction permit from the City of Fontana Public Works Department prior to construction. 2. The contractor shall call for pre—job meeting through the City of Fontana Public Works Department hours prior to starting work. 3. The contractor shall call Underground Service Alert (1-800-422-4133) two days prior to any excavation. 4. All grading shall be accomplished by separate grading plan and permit, obtained from Public Works Department. 5. Hours of operation are 7:00 a.m. to 4:00 p.m. — Monday through Friday, for all public right—of—way landscape development. 6. Separate permits shall be required for any improvement work in the public right— of—way. 7. Repair or replace all damaged or altered public improvements as required by the City Engineer in the field. 8. All survey monuments shall be protected and perpetuated in place. Any disturbed or covered monuments shall be reset by a qualified registered civil engineer or a licensed land surveyor at the direction of the City Engineer. 9. It shall be the contractor's responsibility to verify the location of all utilities or structures above or below ground, shown or not shown on these plans. He will be held responsible for all damage to any utilities or structures caused by his operation. 1. All LMD areas are to be maintained by the contractor/developer for a minimum of 120 days and request a walk—thru every 30 days by the City Parks, Recreation and Community Services Department. 2. All areas must be maintained in a healthy, weed free, and vigorous condition prior to acceptance by the City. 3. A minimum of one punch list will be developed by the City to note deficiencies to be corrected prior to acceptance. The contractor shall contact the City's Public Works Department at least 48 hours in advance to inspect the following: 1. Pre—job conference onsite. 2. Completion of finished grade. 3. Layout of wood or concrete headers but prior to installation. 4. Irrigation installation at the following points: A. Point of connection to main. B. Backflow prevention installation prior to backfill. C. Trenching (to check depth). D. Meter and controller pedestal location. E. Control valve installation. F. Mainline installation with pressure test at 150 psi for 4 hours. G. Head and swing joint installation. H. Head coverage. I. Sleeving. 5. Weed abatement. 6. Acceptance of plant quality at delivery site. 7. Plant layout. 8. Plant installation. 9. Final Inspection. 5MLAI INC* 1> Landscape Ardiitecture and Bite PlImIrig 119 N. Maple St. 5ulte N, Corms CA. 92 ) WI) FAX WS) PLAN$ FIREPARED UNDER $UPEWSION OF A<TER MILLER 11-01-01 NEW WE6T R IE5 I CMAMCN91 Contractor agrees that he shall assume sole responsibility for job site conditions during the course of construction of this project, including safety of all persons and property; that this requirement shall apply continuously and not be limited to normal working hours, and hold the city and the landscape architect harmless from any and all liability real or alleged, in connection with the performance of work on this project, excepting for liability arising from the sole negligence of the owner, city or landscape architect. TOTAL TOTAL TOTAL TOTAL 84 83 82 81 TURF GROUNI}CO1lER WORKSITE TOTAL SQUARE FOOTAGE & SHRUB MARaSCAPE SQUARE FOOTAGE SQUARE FOOTAGE TREE COUNT. SQUARE FOOTAGE AND ACREAGE 4t667 S.F. 13,023 S.F. 0 S. F. 179690 S.F. 53 ACRES(0.29 (0.11 } ACRES(0.0 ) ACRES(0.41 } ACRES � fftference Plans f6r thme brPr®veme "ts Gate 1 By REYI6ION6 App'cI MENCN MARK t 11 1 -- ! w _ �. i _ _ _. :' - _ _ - � ;. i - '- t� - r A ' 'IN an A I MI MI Lff-A 1111111 Al 0 KWIDIIJ L Eoglneeatns Parks Gate 0- W C� I � _J 28UJ 29 `3 1144 78 77 76 74 I 73 1 72 88 87 86 85 84 83 82 81 58 71 70 57 56 Date .m• GLB DESIGNED BY:$*$ CHECKED SY: SAX CITY Oft"F F0"%TANA .11'1 PRINTED: 11-01-01 SCALE: N.T.S. DATE: II -01-0I GUJIG NO. ��a 3110