HomeMy WebLinkAbout3071-1STORM DRAIN IMPROVEMENT FLANS GENERAL NOTES
1 ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS THE CITY OF FONTANA
STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR
PUBLIC WORKS CONSTRUCTION ("GREEN BOOK") ALL REFERENCE SPECIFICATIONS AND
STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2 WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT
CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN
BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAM CONFLICT TO THE CITY
ENGINEER FOR RESOLUTION.
3 ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER
4 ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE
ONE WEEK PRIOR TO IMPLEMENTING DETOUR&
5 CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY
DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK.
INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO
THE START OF ANY WORK IN PUBLIC RIGHT--OF-WAY WITHIN THE CITY LIMITS. CALL (909)
350-7610.
6 THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND
PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS,
LATEST NON-MIETRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC
ENGINEER.
7 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES,
DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
8 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK
FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF
INDUSTRIAL SAFETY.
9 THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH
SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS
PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE
OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN
THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
10 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT
OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE
1 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE
INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
DETERMINE IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES,
AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR
SHALL CONTACT UNDERGROUND SERVICE - ALERT AT I -NO -227-2600 TWO WORKING DAYS
BEFORE EXCAVATION.
12 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES
INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION,
LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER,
STORM DRAIN, FLOOD CONTROL AND CALTRANS ALL UTILITY COMPANIES SIIALL BE GIVEN
TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
13 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES
WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE
APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
14 STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE
NOTED.
15 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGE 14EER TO
ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND
CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16 THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR
BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17 REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL INCLUDING SURVEY
MONUMENT TEES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER
OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A
RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN
BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18 THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT
ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE
CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLE&
19 THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL,
INCLUDING ADEQUATE WATERING, AT ALL TIMM
20 THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL MUD, SILT OR DEBRIS TO
BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO TEE RIGHT OF WAY
DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAI
21 NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY
INSPECTOR.
22 A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN
THE REQUIRED DENSITY SHALL REQUIRE RE --WORKING OF THAT PORTION OF THE WORK
UNTIL THE SPECIFIED DENSITY IS OBTAINED.
23 CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM
UNDERMP41 NG STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY
ENGINEER MAY REQUIRE TEMPORARY NON--EROIDEABLE SWALES ENTERING OR LEAVING
IMPROVEMENTS.
24 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FR41 BH TO
MATCH EXISTING CONCRETE.
25 NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR
APPROVAL OF THE CITY ENGINEER.
20 PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND
VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO
EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN
ON THE PLANS.
BASIS OF BEARING:
BASIS OF BEARING BEING THE
SOUTH LINE OF NE 1/4 SECTION
35, T1 S, R6W, SBBM SHOWN AS N
89'47'11" W ON TRACT NO.
15655-61 M.B. 264/47-49,
RECORDS OF SAN BERNARDINO
COUNTY.
BENCHMARK
BM #8-17 ElEV=1428.609
DEPARTMENT OF TRANSPORTATION
BRASS DISC. MARKED 8-17
NORTH SIDE FO HIGHLAND 1300 FEET EAST
OF CHERRY ON THE BASE OF AN EDISON
TOWER.
CITY 0-F FONTANA
STORM DRAIN IMPROVEMENT PLAN
FOR
TRACT 15863 (ON-SITE)
27 IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED
IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED
AGENCIES IMMEDIATELY.
28 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN
PLACED, INSPECTED AND APPROVED.
29 ALL UNDERGROUND UTILITIES' SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO
PAVING OF STREETS.
30 APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO
PLACEMENT.
31 ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO
FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
32 UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING,
STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF
THE CITY TRAFFIC ENGINEER.
33 AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF
RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
34 MINIMUM D -LOAD FOR ALL RCP IS 1350.
ERA� RAS NS.R
1. The construction of all public improvements shall conform to these
plans and to the requirements of the City standard specifications,
Public Works Construction. (Green Book)
2. Construction permits shall be obtained from Fontana Public Works
Department prior to the start of any work within the City limits.
3. Stationing refers to the centerlines of storm drains and reference
made on centerline of street stationing except where otherwise
noted.
4. All exposed concrete surfaces shall conform in grade, color and
finish to all adjoining street public improvements such as curbs
and gutters, and sidewalks.
5. No concrete shall be placed until the forms and reinforcing steel
has been placed, inspected and approved.
6. All underground work shall be completed prior to paving of streets.
7. Existing underground utilities are as per the available records.
The contractor shall be responsible for verifying the actual location
and elevation in the field.
8. The walls and faces of all excavations greater than five (5) feet
in depth shall be effectively guarded by a shoring system, sloping
of the ground or other equivalent means. Trenches less than five
(5) feet in depth shall also be guarded when examination indicates
hazardous ground movement may be expected.
9. The Contractor(s) shall also obtain a permit to perform excavation
or trench work as describe d in Note 8 above from Col/Ostia.
10. All manholes shall be constructed 6" below pavement grade and
brought to finish grade by the paving contractor after pavement is
in place.
11.Immediately following removal of existing pavement or dike or curb
and/or gutter, the contractor shall diligently pursue that portion of
work to completion,
12. All C.M.P. installations and connections shall be made per
manufacturer's suggested method unless otherwise specified tin the
plans.
13.If during construction, ground water is encountered, a -system
approved by the City Engineer shall be installed to dewQter sold
area at the direction of the Soils Engineer.
14. No trench backfill shall take place without prior approval of the
City's Inspector.
15. All exposed metal surfaces shall be galvanized in accordance with
the City standard specifications.
16. As --built plans shall be provided to the City by the Contractor.
2-1XISTIN GGH001.� SITS ,
WALNUT AVENUE � TRACT 16655
� I
�+ l
l I
��s�r�s��
f
�a.s rssr sssssrss ------------------------
---------------------
r
swsrssslsssssrssrsswsarrOrr ar �srs s.w.� �i.ts rr�srrsiser s4irr rsswa✓ �^�__
• � � , � t r � r � � t
<r-
{
rN
C- �WT 45 W
I
,1
it
I C Arz I I I I
3 It
i ago r... i ti
N a,r>t 8 20 VE 1
� �.s� ru.�sr rr
CB4 i
SHEI i { CB 1 I E 1 ! t I I j�
iii��• 1 , =1 I 1 I t ! E I ♦ 4 I [�
- I 1
,
1 !
l TiAC' i9 I <<� l ITR �T l B ION AqY
i I I I I l I i+ ilfl 1. I TI«31�C�' 1142� I I
Il..�`sssrs:rrsawsa��.rs �.r aatsas =sw rssaC = srs ass r -ss a=.craw ^s sr rs sw rwwr.�rr�M�ss f 1 let
It--a.ss rss 1/�setrrrssrssrs s...rr.,srs tis rsrs meassw..-.rr wsrs rr wrss:wn.srrws rs..er ^� ! { I
_0 i
�� r I
1
INDEX MAP
NTS
STORM . DRAIN CONSTRUCTION NOTES:
CONSTRUCT CURB OPEN CATCH BASIN PER APWA STD. 300-2 - -- -- --- -- - - - - - - - - - - - ...r. - - _
CONSTRUCT TRAFFIC JUNCTION STRUCTURE PER APWA STD. NO. 320-1 - - - -- - -- -- - - --- - - - -
CONSTRUCT CURB INLET STRUCTURE PER APWA STD. 313-1; CASE AND LENGTH AS NOTED- - - - --
INSTALL 42" RCP (1500D) ------------_.--_ ---------------------_..
INSTALL 36" RCP (1500D) ---------------.....-__----_-_-_ ----_-----
INSTALL 24" RCP (1500D) ---_........-------------------..------__-----
INSTALL 18" RCP (13,50D) -r-------- ----------- _-----...-----_-- . -
JOIN EXISTING STORM DRAIN PIPE -------_-_----.----_.------_-- _- - _-
NOTE:
QUANTITIES SHOWN ARE FOR BONDING PURPOSES ONLY. CONTRACTOR IS RESPONSIBLE
FOR VERIFYING ALL QUANTITIES PRIOR TO BIDDING AND CONSTRUCTION.
fr*ar INDICATED THE PAVEMENT SECTION SHALL BE SUBMITTED TO SOIL ENGINEER'S
APPROVAL. ALL PAVEMENT SECTION RECOMMENDATIONS BASED ON "R" VALUE ANALYSIS
OF THE SUB -GRADE SOIL, AND EXPECTED TRAFFIC INDEX.
CALIFORNIA COUNCIL OF CIVIL ENGINEERS AND LAND SURVEYORS,
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE
AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THE PROJECT. INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THAT
THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY
AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR
ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK IN THIS PROJECT, EXPECTING
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL.
6 EA
3 EA
6 EA
66 LF
368 LF
108 LF
52 LF
1 EA
SUMMIT AV
r-►11%►1.vT1F UL_
VICINITY MAP
33. City of Fontana, utility
notification fist:
City of Fontana
Attn: Carlos Navarro
8353 Sierra Avenue
Fontana, CA 92335
(909) 350-6632
So. Calif. Gas Company
Attn: Dennis Freeman
1981 W. Lugonia Avenue
Redlands, CA 92374
(909) 335-7547
Emergencies: (800) 427-2200
So. Calif. Edison Company
300 N. Pepper Avenue
Rialto, CA 92376
(909) 820-5598 - Underground
(909) 875-5100 - Transmission
(213) 637-1233 - Pipelines
(909) 357-6223 - Distribution
(800) 422-4133
Crawford Canyon Mutual Water Co.
Attn: Bill Vanderkieft, Jr.
(619) 868-6040
Pacific Bell Co.
Attn: Virginia Becker
3939 E. Coronado Street
Anaheim, CA 92807
(714) 666-5467
Underground Service Alert
(800) 227-26100
Comcast ( Cable TV }
Attn: Jack Hayes
1205 Dupont Ave.
Ontario, CA 91761
(909) 390--4738
General Telephone Company
Attn: Steve Hock
1400 E. Phillips Blvd.
Ontario, CA 91766
(800) 422--4133
Fontana Water Company
Attn: Michael J. McGraw
8440 Nuevo Avenue
Fontana CA 92235
(909) 822-2201
Fax; (909) 823-5046
0.16' 0.16'
R.O.W LEVEL LIN ? 2 R.o.W.
1
1511171 20' 20' 7' 5'
01
12' 40 12' t
i 64' R.O.W. i
COMMUNITY ENTRANCt
NTS
TRAFFIC INDEX = 6.5
* EARP WAY, HOLIDAY DRIVE AT ENTRANCE
R.O.W.
0.20' 0.20'
R.O.W.
TRAFFIC INDEX = 5.5
* ANDREA STREET, CORY COURT, IRONRIDGE COURT
CERRITOS STREET, GARDEN ROSE STREET,
HOLIDAY DRIVE, PLUMROSE STREET
LEGEND:
TC
TOP OF CURB
FL
FLOW LINE
FS
FINISHED SURFACE
FG
FINISHED GRADE
FF
FINISHED FLOOR
GF
GARAGE FLOOR
PAD
PAD
TW
TOP OF WALL
TF
TOP OF FOOTING
H
HEIGHT
L
LENGTH
R_
PROPERTY LINE
R/W
RIGHT--OF—WAY
RETAINING WALL
(120)
EXISTING ELEVATION
120
PROPOSED ELEVATION
TBM
TEMPORY BENCH MARK
BM
BENCH MARK
C
CUT
F
FILL
N
NATURAL
��•-�-►
PROPERTY LINE
EXISTING CONTOURS
PROPOSED CONTOURS
-----�-----
LIMIT OF OVEREXCAVATION
CUT/FILL DAYLIGHT LINE
NOTE:
SECTION 4216/4217 OF THE GOVERNMENT
CODE REQUIRES A DIG ALERT IDENTIFICATION
NUMBER BE ISSUED BEFORE A PERMIT TO
EXCAVATE WILL BE VALID. FOR YOUR DIG
ALERT ID NUMBER CALL UNDERGROUND
SERVICE ALERT
TOLL FREE 1-800-227 -260 0
TWO WORKING DAYS BEFORE YOU DIG.
k
0