Loading...
HomeMy WebLinkAbout2986-1� � t ROADWAY LANDSCAPE PLANS BEECH AVE. STATION � 4.00 TO 17.00/ BASELINE AVE 132.00 TO 145.00 SILVER RIDGE TR. 160, 85 L "0 CENT.EX HOMES 2280 W rdlow Ci Corona, California (909) 279-4000 FAX - GENERAL NOTES: City Required Notes: Inspections: 1. It is the landscape Contractor's responsibility to contact the Engineering Division's Landscape inspector 48 hours Prior to desired inspection of an item at (909)350-6633. 2. Prior to release of utilities or, maintenance period commencement following inspections are required: Pre construction meeting a. Inspection of irrigation system in open trench condition (prior to backfill). b. Mainline pressure test @a 150 p.s.i. for a three (3) hour period. c. Irrigation coverage tests including initial and final tests. d. Finish grade prior to planting e. Plant materials prior to planting. f. Planting, including street trees. Contact the Parks Planning and Landscape g. Development Section Engineering Division, for species and final locations. 3. The Owner's representative and landscape contractor shall be present at each inspection. Mai*ntenance Gui*deli'nes uite Lance Clements Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth. 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant i growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain food working i condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. i 9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10: The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. f SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF _a IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR -THEREAFTER. t VICINITY MAP 6 CARTER AVENUIVE HIGHLAND EXISTING HIGFH+'FA D AVENUE J�, H,GHL SOU TNS AND AVENUE w w Z r �I � w w > } WALNUT JY 0 _J BASELINE AVENUE Project �Ccati_crl SHEET L-5, L -F CHANNEL s T S ' ■ S C S o i i Landscape 19762 Mac Arthur Boulevard (949) 644-9370 Architecture suite 130 FAX 476-1432 Irvine, CA 92612 & Planning Richard Polhamus, License # 2782 Jf5_t�l c5 e,-4�fwrl SHEET INDEX T-1 TITLE SHEET L-1 BEECH AVE. CONSTRUCTION PLAN L-2 BASELINE AVE. CONSTRUCTION PLAN L-3 IRRIGATION NOTES, LEGEND &DETAILS L-4 IRRIGATION NOTES, LEGEND &DETAILS L-5 BEECH AVE. IRRIGATION PLAN L-6 BASELINE AVE. IRRIGATION PLAN L-7 PLANTING NOTES, LEGEND &DETAILS L-8 BEECH AVE. PLANTING PLAN (TREES &GROUND COVER) L-9 BASELINE AVE. PLANTING PLAN (TREES &GROUND COVER) L-10 BEECH AVE. PLANTING PLAN (SHRUBS &VINES) L- ll BASELINE AVE. PLANTING PLAN (SHRUBS &VINES) L-12 SPECIFICATIONS INSPECTIONS: CONTRACTOR TO NOTIFY THE LANDSCAPE ARCHITECT 48 HOURS IN ADVANCE OF ALL REQUIRED SITE REVIEWS AS FOLLOWS: 1. PRE -CONSTRUCTION MEETING 2. IRRIGATION SYSTEM REVIEW PRIOR TO BACKFILL 3. SOIL PREPARATION 4. PLANT MATERIAL PRIOR TO INSTALLATION 5. IRRIGATION COVERAGE TEST 6. COMPLIANCE WITH PLANS FAILURE TO NOTIFY THE LANDSCAPE ARCHITECT AND OBTAIN APPROVAL WILL HOLD CONTRACTOR LIABLE FOR ANY CHANGES REQUIRED., ITIS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE WORK SO THE ENTIRE PHASE IS READY FOR EACH OF THE LISTED REVIEWS AT ONE SITE VISIT. IMPORTANT NOTICE SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER TO BE ISSUED BEFORE A PERMIT TO EXCAVATE WILL BE VALID. FOR YOUR DIG ALERT ID NUMBER CALL UNDERGROUND SERVICE ALERT. TOLL FREE NUMBER IS (800) 422-4133 TWQ WORKING DAYS BEFORE YOU DIG. THE CITY OF FONTANA LANDSCAPE TECHINICIAN WILL CONDUCT A FINAL LANDSCAPE INSPECTION UPON RECEIPT OF THE LANDSCAPE ARCHITECTS CERTIFICATION AND INSPECTION FORM (NOTIFICATION 48 HRS. REQUIRED). CALL (909) 350-6633. CITY OF FONTANA SUBMITTALS minim 0 It REVISIONS JOB NO. 2782 yGs�-r 01-012 v CL_ ��. DATE E' OF 11/01/01 _®