HomeMy WebLinkAbout2948-12.
3
SIGNING ANC
CHERRY
AVENUE
SCALE: 1 " =20"
ALL WORK, MATERIALS AND EQUIPMENT FOR TRAFFIC SIGNING ANC
CONFORM
TO THESE PLANS, THE
STANDARD SPECIFICATIONS FOR THE
CITY OF FONTANA,
AND THE
1992 STANDARD PLANS
AND SPECIFICATIONS OF THE STATE
OF CALIFORNIA.
PAVEMENT MARKINGS & LEGENDS SHALL CONFORM TO THE CITY OF FONTANA STANDARD STENCILS.
ALL STRIPING AND PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC PER SPECIAL PROVISIONS.
4. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST
CALTRANS SIGN SPECIFICATIONS SHEETS. SIGN CODES SHOWN HEREON ARE TO CONFORM
TO CALTRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE SHALL BE STANDARD
UNLESS OTHERWISE SHOWN ON THE PLANS.
5.
101
7.
ALL SIGNS SHALL BE MOUNTED ON A GALVANIZED STEEL POST, UNLESS OTHERWISE SHOWN,
PER CITY STANDARD DETAIL 139.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS
OR OTHER TRAFFIC CONTROL AT' ALL TIMES.
CONTROL POINTS OR "CAT—TRACKING" TO BE APPROVED BY THE ENGINEER 24 HOURS PRIOR
TO PAVEMENT STRIPING APPLICATION.
a
SIGNING AN -D STRIPING CONSTRUCTION NOTES:
.INSTALL STRIPING DETAIL (INCLUDING RAISED PAVEMENT MARKERS),
ARROW TYPE, AND PAVEMENT LEGEND AS INDICATED
❑2 RELOCATE SIGN TO NEW POST
❑3 REMOVE EXISTING CONFLICTING STRIPING/MARKING
Ch erryA veStripingCon cep tgWalnu tSh t