Loading...
HomeMy WebLinkAbout2948-12. 3 SIGNING ANC CHERRY AVENUE SCALE: 1 " =20" ALL WORK, MATERIALS AND EQUIPMENT FOR TRAFFIC SIGNING ANC CONFORM TO THESE PLANS, THE STANDARD SPECIFICATIONS FOR THE CITY OF FONTANA, AND THE 1992 STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA. PAVEMENT MARKINGS & LEGENDS SHALL CONFORM TO THE CITY OF FONTANA STANDARD STENCILS. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC PER SPECIAL PROVISIONS. 4. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATIONS SHEETS. SIGN CODES SHOWN HEREON ARE TO CONFORM TO CALTRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE SHALL BE STANDARD UNLESS OTHERWISE SHOWN ON THE PLANS. 5. 101 7. ALL SIGNS SHALL BE MOUNTED ON A GALVANIZED STEEL POST, UNLESS OTHERWISE SHOWN, PER CITY STANDARD DETAIL 139. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT' ALL TIMES. CONTROL POINTS OR "CAT—TRACKING" TO BE APPROVED BY THE ENGINEER 24 HOURS PRIOR TO PAVEMENT STRIPING APPLICATION. a SIGNING AN -D STRIPING CONSTRUCTION NOTES: .INSTALL STRIPING DETAIL (INCLUDING RAISED PAVEMENT MARKERS), ARROW TYPE, AND PAVEMENT LEGEND AS INDICATED ❑2 RELOCATE SIGN TO NEW POST ❑3 REMOVE EXISTING CONFLICTING STRIPING/MARKING Ch erryA veStripingCon cep tgWalnu tSh t