CIN OF FONTANA GENERAL NOTES FOR STORM DRAIN IMPROVEMENT PLANS
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CIN OF FONTANA STANDARD PLANS, THE CONTRACT
PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE
SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CIN OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT,
ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT
LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY
WITHIN THE CIN LIMITS. CALL (909) 350-7610.
3. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES. CONTRACTOR SHALL
COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
4. STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED.
5. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
6. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION. HOWEVER, IT SHALL BE
THE RESPONSIF3ILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY
EXISTING UTILIT ES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL
CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. A
7. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING
CONTRACTOR UPON COMPLETION OF PAVING.
8. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO,
GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED
WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO
WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
9. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE
RECORD DRAWINGS TO THE CITY ENGINEER.
10. WHEN CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO
PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO
THE CITY ENGINEER FOR RESOLUTION.
11.
APPROVED SOIL STERILANT IS REQUIRED UNDER ALL
NEW ASPHALT PAVEMENT
PRIOR
TO
PLACEMENT.
12.
ALL EXPOSED CONCRETE SURFACES SHALL CONFORM
IN GRADE, COLOR AND
FINISH
TO
MATCH EXISTING CONCRETE.
13. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND
APPROVED.
14. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY
SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION
OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE
GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
15. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR
GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
16. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
17. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC
OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
18. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC
CONTROL AT ALL TIMES.
19. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY
SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
20. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
21. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO
CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF
BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
22. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS.
UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR
LEAVING IMPROVEMENTS.
23. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR
SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY.
24. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT
PRIOR NOTIFICATION TO THE CITY ENGINEER.
TOLL FREE -qqmmmwm-1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REV.
REVISION DESCRIPTION
DATE
EW;R.
CITY
DAIS
AND
PROCEDURES DESCRIBED IN
THE
"W.A.T.C.H.
MANUAL", LATEST
EDITION
UNLESS
OTHERWISE DIRECTED BY THE
CITY
TRAFFIC ENGINEER.
05
REVISE FOR FlNAL APPROVAL. CURB AND GUTTER TD CITY SPEC.
3/01
ES
04
REVISE FOR nw AP wit
1/01
ES
03
REVISE FOR FlNAL APPROVAL
11/00
ES
02
REFERENCE FOR FNNL APPROVAL
7/00
ES
25. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND
BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY
MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR
SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED
FOR LATER REPLACEMENT OF THE MONUMENT.
26. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12
FOOT LANE SHALL BE MAINTAINED AT- ALL TIMES IN THE CLOSURE AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
27. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE
PERMIT FOR THAT PURPOSE.
28. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION
OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF
ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
29. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE
WATERING, AT ALL TIMES.
30. THE
CONTRACTOR
SHALL CONFORM
TO ALL
TRAFFIC
CONTROL POLICIES, METHODS
AND
PROCEDURES DESCRIBED IN
THE
"W.A.T.C.H.
MANUAL", LATEST
EDITION
UNLESS
OTHERWISE DIRECTED BY THE
CITY
TRAFFIC ENGINEER.
31. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER
TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC. ENGINEER.
32. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER.
LIST OF QUANTITIES:
8" P.C.C. CURB -REMOVAL 10 L.F.
A.C. PAVEMENT REMOVAL - 232 S.F. 1000-1400 C.F.
PIPING: 50 L.F. OF 18* RCP 1350 D
JUNCTION STRUCTURE: 1
CRTC H BAS I N: 1
A.C. PAVEMENT REPLACEMENT - 232 S.F.
P.C.C. CURB AND GUTTER - (W=18") = 10 L.F.
THE GAS COMPANY
PLANNING DEPARTMENT
P.O. BOX 303
SC8031
REDLANDS, CA 92373
ATTN: MR. RICKEY REYES
TEL. 909-335-7508
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NW
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
21
Prepared under The S-i*w risim 0f
M SIROTA
MFG, INC.
17770 CARTWW.Iii?.
SUITE 500
IRVINE, CA 92614-5854
949/253-2951
Dde : 03/07/01
DRAWN BY.
PRM
DESIGNED W.
FLC
CFIECKED W.
ES P
CIN OF FONTANA, CALIFORNIA
NOTES FO
7 IMPRrW
STORM DRAIN
LENT PLAN
C74
3/01
�1T-:
C 2 175