Loading...
HomeMy WebLinkAbout2911-20 0 N oh N ap 31 v i V) W X _3 0 0 O 0 EC ON I N N M N O � STATION 1+05 1+10 1+15 1+20 1+25 1+30 1+35 1+40 1+45 1+48.58 CATCH BASIN H EADWALL )04.5 -MIN. TOP OF TRASH RACK=INFLOW DITCH INVERT ►02.5 � r_ - U T ► r I r 0 5 10 15 20 25 30 35 40 45 50 LATERAL LENGTH FROM MAIN STORM DRAIN (feet) CONSTRUCT 48.6 LF STORM DRAIN LATERAL PROFILE 18" RCP — 1350 D VERTICAL SCALE HORIZONTAL SCALE 1 0 1 FEET 5 0 5 FEET VEIL MAL EUGGERATION = 5m 18" RCP INVERT 999.0 NOTES: 1, CONSTRUCTION CONTRACTOR SHALL ACCURATELY LOCATE ALL UTILITIES, AND PROVIDE ADEQUATE PRECAUTIONS AND PROTECTIVE MEASURES TO PREVENT DAMAGE TO UTILITIES DURING CONSTRUCTION. 2. CONSTRUCTION CONTRACTOR SHALL ENSURE THAT THE PROPER STANDARD PLANS ARE APPLIED TO THIS WORK, WITH DIMENSIONS TO FIT THE REQUIREMENTS OF THE WORK. 3. GAS PIPELINE AT CULVERT CROSSING TO BE RELOCATED BY THE GAS COMPANY PRIOR TO INSTALLATION OF STORM D RAI N LATERAL. REFERENCES: —PLAN VIEW TOPOGRAPHY MAP OBTAINED FROM ENGINEERING RESOURCES OF SOUTHERN CALIFORNIA, INC., 164 W. HOSPITALITY LANE, SUITE 1, SAN BERNARDINO, CALIFORNIA 92408, PH.# (909)888-1401 FAX. # (909)885-4638. SURVEY DATA BENCHMARK #288 — N.E. CORNER OF POPLAR AND SANTA ANA R.R. SPIKE IN P.P. #71833. ELEV. 1019.86' JOB NO. 99-014-001. LEGEND: -� STORMWATER COLLECTION/DRAINAGE DITCH EXISTING CONTOURS (CONTOUR INTERVAL) EXISTING FENCE RELOCATED FENCE MESA moommommommom MENEM mommommoommom Emmmom pow 0 m m maw, wommommoklm MENNENP�PR ST ST-FEIL4 MK CATCH BASIN H EADWALL )04.5 -MIN. TOP OF TRASH RACK=INFLOW DITCH INVERT ►02.5 � r_ - U T ► r I r 0 5 10 15 20 25 30 35 40 45 50 LATERAL LENGTH FROM MAIN STORM DRAIN (feet) CONSTRUCT 48.6 LF STORM DRAIN LATERAL PROFILE 18" RCP — 1350 D VERTICAL SCALE HORIZONTAL SCALE 1 0 1 FEET 5 0 5 FEET VEIL MAL EUGGERATION = 5m 18" RCP INVERT 999.0 NOTES: 1, CONSTRUCTION CONTRACTOR SHALL ACCURATELY LOCATE ALL UTILITIES, AND PROVIDE ADEQUATE PRECAUTIONS AND PROTECTIVE MEASURES TO PREVENT DAMAGE TO UTILITIES DURING CONSTRUCTION. 2. CONSTRUCTION CONTRACTOR SHALL ENSURE THAT THE PROPER STANDARD PLANS ARE APPLIED TO THIS WORK, WITH DIMENSIONS TO FIT THE REQUIREMENTS OF THE WORK. 3. GAS PIPELINE AT CULVERT CROSSING TO BE RELOCATED BY THE GAS COMPANY PRIOR TO INSTALLATION OF STORM D RAI N LATERAL. REFERENCES: —PLAN VIEW TOPOGRAPHY MAP OBTAINED FROM ENGINEERING RESOURCES OF SOUTHERN CALIFORNIA, INC., 164 W. HOSPITALITY LANE, SUITE 1, SAN BERNARDINO, CALIFORNIA 92408, PH.# (909)888-1401 FAX. # (909)885-4638. SURVEY DATA BENCHMARK #288 — N.E. CORNER OF POPLAR AND SANTA ANA R.R. SPIKE IN P.P. #71833. ELEV. 1019.86' JOB NO. 99-014-001. LEGEND: -� STORMWATER COLLECTION/DRAINAGE DITCH EXISTING CONTOURS (CONTOUR INTERVAL) EXISTING FENCE RELOCATED FENCE