HomeMy WebLinkAbout3007-1TRAFFIC CONTROL -GENERAL NOTES
CITY RIGHT OF WAY
1. ADVANCE CONSTRUCTION SIGNING INDICATING
DURATION OF PROJECT SHALL BE IN PLACE ONE
WEEK PRIOR TO IMPLEMENTING DETOURS.
2. CONSTRUCTION PERMITS SHALL BE OBTAINED
FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT
DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE
START OF ANY WORK. INSPECTION COORDINATION
SHALL BE REQUESTED AT LEAST TWO WORKING DAYS
PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-
OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
3. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC
CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED
IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC
CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE
DIRECTED BY THE CITY TRAFFIC ENGINEER.
4. THE CONTRACTOR SHALL NOTIFY THE CITY TRAFFIC
SECTION TWO WORKING DAYS PRIOR TO IMPLEMENTING THE
TRAFFIC CONTROL PLAN TO ALLOW CITY STAFF 11ME TO
ADJUST TRAFFIC SIGNAL DETECTION.
5. THE CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC
AT ALL TIMES UNLESS OTHERWISE APPROVED BY THE CITY
TRAFFIC ENGINEER. QUALIFIED FLAGGERS SHALL BE USED
WHEN THE ROADWAY IS REDUCED TO A SINGLE LANE OR
WHERE TRAFFIC MUST STOP FOR MOVEMENT OF EQUIPMENT.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR
TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC
CONTROL DEVICES AT ALL TIMES.
7. THE WORK ZONE SHALL BE ROUTINELY INSPECTED AND
MAINTAINED TO ENSURE PROPER VISIBILITY AND OPERATION
OF ALL TRAFFIC CONTROL AND ADVANCE WARNING DEVICES.
8. ALL EXISTING SIGNS, STRIPING OR PAVEMENT MARKINGS
THAT ARE IN CONFLICT AND/OR NO LONGER APPLICABLE
SHALL BE REMOVED AS DIRECTED BY THE CITY TRAFFIC
ENGINEER.
9. SIGNS SHALL NOT BE PLACED IN EXCESS OF 15 FEET
FROM THE EDGE OF THE TRAVELED WAY. PORTABLE
SIGN STANDARDS SHALL BE 11ED DOWN OR WEIGHTED TO
PREVENT TOPPLING.
10. THE EXACT LOCATION OF ALL TRAFFIC CONTROL
DEVICES IS SUBJECT TO APPROVAL OF THE CITY TRAFFIC
ENGINEER. ADDITIONAL WARNING, CONSTRUCTION SIGNS OR
TRAFFIC SAFETY EQUIPMENT MAY BE REQUIRED BY THE
CITY TRAFFIC ENGINEER.
11. ALL WORK AREAS SHALL BE CLEARLY IDENTIFIED
AND DELINEATED WITH CONES, PORTABLE DELINEATORS
AND/OR BARRICADES. ALL CONES OR PORTABLE DELINEATORS
SHALL BE A MINIMUM OF 28 INCHES IN HEIGHT.
12. ALL SIGNS SHALL BE REFLECTORIZED OR ILLUMINATED.
13. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL
CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATION
SHEETS. SIGN CODES SHOWN HEREON ARE TO CONFORM TO
CALTRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE
SHALL BE STANDARD UNLESS OTHERWISE SHOWN ON THE
PLANS.
14. ALL SIGNS SHALL BE MOUNTED ON GALVANIZED STEEL
POSTS, UNLESS OTHERWISE SHOWN ON THE PLANS, PER
CITY STANDARD DETAIL 139.
15. ALL FLASHING YELLOW WARNING LIGHTS SHALL BE
TYPE "A" PORTABLE, LENS DIRECTED, ENCLOSED AND MOUNTED
AT A MINIMUM HEIGHT OF 3 FEET, MEASURED FROM THE
BOTTOM OF THE LENS TO THE UNDERLYING SURFACE.
16. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL
RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12
FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE
CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
17. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL
RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER
TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE
CITY TRAFFIC ENGINEER.
INDEX
TRAFFIC CONTROL -GENERAL NOTES
STATE RIGHT OF WAY
1. All work within the State right of way shall conform to the
latest State Standard Plans do Specifications or as directed
by the State's representative (Standards other than State
Standards must be pre -approved and Justified).
2. No equipment or materials may be stored on the State right of
way.
3. All disturbed areas in the State right of way must be
treated for erosion control (hydroseeding or
equivalent or as directed by the State's representative).
The responsibility for maintaining erosion control will not
be released until the seeding is wall established. The
contractor will be responsible for the cost of Caltrans
cleaning any drainage structures/channels which have
become cluttered with debris and/or silt as a result of, the
construction project.
4. The structural section shown within the State, right of way
is for estimating purposes only. The actual section will be
designed by a Soil Engineer after native soil testing has
been completed. a traffic index (TI) of 7 shall be used in the
design of the traveled way, and a TI shall be used for
the shoulder design. The laboratory reports and the design
calculations shall be submitted to the state's
representative for approval prior to construction of the
structural section.
5. All State drainage structures/channels must first be
completely cleaned of debris and/or silt by the contractor
prior to making the connection.
6. The contractor shall be responsible for ensuring that any
State drainage facility which Is connected to or directly
affected by the contractors operation shall be clean and
operational prior to final acceptance of the permit work by
the State. Adequate clean -outs and access openings shall be
provided in any construction within the State's right of way
for future maintenance and repair work as needed. This work
shall be furnished at no cost to the State.
7. Where survey monuments exist, such monuments shall be
protected or shall be referenced and reset pursuant to
Business and Professions Code, Sections 8700 to 8805 (Land
Surveyor's Act).
8. The pavement shall be saw -cut 2' (51mm) minimum from the
edge of pavement. The saw -cuts must be perpendicular or
parallel to the State highway centerline.
9. All signing, striping and pavement markings shall be in
conformance with the current edition of the Traffic Manual,
published by the State of California, Department of
Transportation, and the Special Provisions. All pavement
markings shall be thermoplastic unless otherwise noted on
the plans.
10. The exact location of all signs shall be determined in the
field by the State's representative.
11. All conflicting striping and pavement markings not shown on
the plans shall be removed from the pavement by sandblasting
by the contractor.
12 All conflicting signs shall be either removed or relocated
by the contractor. Relocatable signs shall be Installed as
specified on the plans or as determined in the field be the
State's representative.
13. All signs, roadside markers, electroliers, etc., shall
be protected and/or replaced in-kind according to the current
State standard Plans and the current Traffic Manual, at no
cost to the State.
SHEET 1
C3
TITLE SHEET
SHEET 2
C4
FOOTHILL BOULEVARD PLAN AND PROFILE (ENGLISH)
SHEET 3
C5
PALMETTO AVENUE PLAN AND PROFILE (ENGLISH)
SHEET 4
C6
FOOTHILL BOULEVARD PLAN AND PROFILE (METRIC)
SHEET 5
C7
SIGNAGE AND STRIPING PLAN (ENGLISH AND METRIC)
SHEET 6
C8
CATCH BASIN DETAILS
SHEET 7
EEI
CATCH BASIN DETAILS
BENCH MARK p O
SAN BERNARDINO COUNTY DESIGNATION
506 S.P.S.N. (GS 7-11). NORTHEAST
CORNER OF FOOTHILL BLVD AND PALMETTO
AVE; BRASS DISK 2' NORTH OF EAST CURB DIAL TWO WORKING
RETURN OF PALMETTO AVE. BEFORE DAYS BEFORE
YOU DIG YOU DIG
ELEVATION 1320.64 TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
C:\Lord Projocts\Ot-Oe\Rood\CURRENT\TITLE.DWG 12/21/01 09:42:26 AM AM PST
REV.
L'rt0 2 b 1> eZA w, ivG
PROJECT S
VICINITY MAP
NO SCALE
EXISTING STRUCTURES
99
c7a3
- W -
-G-
-S-
SD
ESTIMATE OF QUANTITIES
8" CURB AND GUTTER
881
MILLER
AVE
ITE
AC PAVING
BARBEE
ST
217
tonne
UJ
W
UJ
UJ
28
Q
Q
4018
Q
373
Q
O
FOOTHILL
BLVD
168
sm
O
270
W
206
UJ
(�
Q
1
M J
Q
CATCH BASIN W=4
1
Q
CATCH BASIN W=10'
1
IL
SAWCUT AC
ARROW
BLVD
274
m
FIRE HYDRANT
2
EA
VICINITY MAP
NO SCALE
EXISTING STRUCTURES
99
c7a3
- W -
-G-
-S-
SD
ESTIMATE OF QUANTITIES
8" CURB AND GUTTER
881
LF
269
m
AC PAVING
239
TON
217
tonne
AC OVERLAY
31
TON
28
tonne
SIDEWALK
4018
SF
373
sm
DRIVEWAY APPROACH
1811
SF
168
sm
EXCAVATION
270
YDS
206
cm
HANDICAP RAMP
1
EA
CATCH BASIN W=4
1
EA
CATCH BASIN W=10'
1
EA
SAWCUT AC
900
LF
274
m
FIRE HYDRANT
2
EA
STREET LIGHT
4
EA
12" RCP
37
LF
11
m
18" RCP
21
LF
6
m
LOCAL DEPRESSION
2
EA
TRAFFIC SIGNAL
1
EA
ROAD SIGN
5
EA
UNDER SIDEWALK DRAIN
3
EA
REVISION DESCRIPTION
DATE I ENGR. I CITY I DATE
WIN
WATER METER
POWER POLE
WATER LINE
GAS LINE
SEWER LINE
STORM DRAIN
FIRE HYDRANT
WATER VALVE
MAN HOLE
SIGNAL LIGHT
PALM TREE
SIGNAL LIGHT PULL BOX
INLET GRATE
DEMOLITION AND RELOCATION
REMOVE TRAFFIC SIGNAL
2
EA
RELOCATE WATER METER
1
EA
RELOCATE PULL BOX
6
EA
REMOVE POWER POLE
2
EA
RELOCATE POWER POLE
2
EA
REMOVE PALM TREE
12
EA
REMOVE SIDEWALK
4440
SF
REMOVE CURB
250
LF
REMOVE AC DIKE
123
LF
REMOVE INLET STRUCTURE
_1
EA
REMOVE AC
3021
SF
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
STANDARDS IN EFFECT.
GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY
OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE
STANDARDS SPECIFIC,4TIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK") ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE
LATEST EDITION UNLESS .OTHERWISE NOTED.
2. WHEN CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS
THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN
THE ("GREEN BOOK"), THE CON .TRACTOR SHALL IMMEDIATELY REPORT SAID
CONFLICT TO THE CITY ENGINEER .FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ANRE SUBJECT TO THE APPROVAL OF THE
CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR
TO THE START OF ANY WORK. INSPECTION COOiRDINATiON SHALL BE REQUESTED
AT LEAST TWO WORKING DAYS PRIOR TO THE S1;4kRT OF ANY WORK IN PUBLIC
RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (901) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFr-IC CONTROL POLICIES
METHODS AND PROCEDURES DESCRIBED IN THE STATE GAF CALIFORNIA MANUAL
OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLLc:SS OTHERWISE
DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TG` MAINTAIN
BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION
OR TRENCH WORK FOR TRENCHES 5 FEET (1.5m) OR GREATER IN DEPTh+ FROM
THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN 5 FEET
(1.5m) IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND
OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE
DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA.
TRENCHES LESS THAN FIVE FEET (1.5m) SHALL ALSO BE GUARDED WHEN THE
POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT
OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM
AVAILABLE INFORMATION. HOWEVER, IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO DETERMINE, IN THE FIELD THE TRUE LOCATION AND
ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER
PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT
UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS
BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL
UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO GAS, TELEPHONE,
ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION,
DOMESTIC WATER, RECLAIMED WATER SEWER, STORM DRAIN, FLOOD
CONTROL AND CALTRANS ALL UTILITY COMPANIES SHALL BE GIVEN TWO
WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER
MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR
SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE
OPERATION AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE
OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE
ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE
PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING
DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS,
MONUMENT TiES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO THE
CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL INCLUDING
SURVEY MONUMENTS, MONUMENT TiES AND BENCH MARKS SHALL BE DONE BY
A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR SURVEY
MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION
SHALL BE REPLACED THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE
WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE
ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND
BUSINESSES AT ALL TiMES. A MINIMUM 12 FEET (3.7m) SHALL BE MAINTAINED
AT ALL TIMES IN THE CLOSURE AREA FOR RESIDENTS AND EMERGENCY
VEHICLES.
BASIS OF BEARING
CENTERLINE OF PALMETTO AVENUE AS BEING
N 0'12'53" W PER RECORD OF SURVEY 35/49
412 sm
76 m
34 m
281 sm
O QROFESS/ pNq PREPARED UNDER THE SUPERVISION OF.
D.Tyr �FTUTTLE ENGINEERING
Civil Engineering Surveying
NO. 30171 Land Planning Improvement Design
EXP MAR 31, 2004 800 E. LUGONIA AVE., SUITE K (909) 798-6785
REDLANDS, CA 92374 FAX (909) 798-1343
2-
F OF CA0 WARREN D. TUTTLE R.C.E.30171 DATE
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS
OF DUST CONTROL INCLUDING ADEQUATE WATERING, AT ALL TiMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED
WIND VELOCITIES EXCEED 25 MILES PER HOUR (40.25 kmh).
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD,
SILT OR DEBRIS TO DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT OR WAY DURING CONSTRUCTION WITHOUT PRIOR
WRITTEN APPROVAL.
22. NO TRENCH BACK FILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL
OF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACK FILL
COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE
REWORKING OF THAT PORTION OF THE WORK UN71L THE SPECIFIED
DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES
FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE
THE CITY ENGINEER MAY REQUIRE TEMPORARY NON ERODE ABLE SWALES
ENTERING OR LEAVING IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL
BE DETERMINED AT THE TIME FOR CONSTRUC11ON AND SHALL CONFORM T0,
THE CITY OF FONTANA STANDARD DETAILS. \
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE COLOR
AND FINISH TO MATCH EXISTING CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE
CURVE AT THE LOCATION OF THE SEWER LATERAL.
28. NO CONCRETE SHALL BE PLACED UNTiL THE FORMS AND REINFORCING
STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND
APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT
PAVEMENT PRIOR TO PLACEMENT.
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT
TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINE BY
SOILS TEST TAKEN AFTER COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE
iNATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A
GE:OTECHINICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR
APPK'OVAL UPON COMPLETION OF ROUGH GRADING.
33. ALL MANHOLES, CLEAN OUT FRAMES, COVERS AND VALVE BOXES SHALL
BE RAISED` TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON
COMPLETION OF PAVING.
34. UPON COM DLETTON OF CONSTRUCTION, CONTRACTOR SHALL RESTORE
ALL SIGNING STRIF?ING, BARRICADES, AND OTHER TRAFFIC CONTROL
DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35. CONTRACTOR SHAD, RELOCATE AND/OR REPLACE LANDSCAPING,
SPRINKLERS AND SIDEWALK'S AFFECTED BY THE CONSTRUCTION TO THE
SATISFACTION TO THE CITY 1: NGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE
ENGINEER OF RECORD, WHO SHALL .PROVIDE RECORD DRAWINGS TO THE CITY
ENGINEER.
C3
CIT( OF FO"LNTANA, CALUFOROA
p
STREET IMPROVEMENT PLANS
DRAWNBY-TITLE SHEET SCALE
NONE
DESIGNED BY: THILL BL PALMETTO AVE. DATE:
WDT SEP 19, 2001
CHECKED BY: 00 BY:
DRAWING NO.:
TWS z �zLgp q- 3007
r-ityrtir_wrro R r r R11 Ro neT'r•