Loading...
HomeMy WebLinkAbout2869-1PROJECT CONSULTANTS lei ir�il 1r!,1 t PACIFIC COMMUNITIES BUILDER, INC. 1000 DOVE STREET, SUITE 100 NEWPORT BEACH, CA 92660 949-660-8988 FAX 949-660-8866 CITY REQUIRED NOTES INSPECTIONS 1. It is the Landscape Contractors responsibility to contact the Engineering Divisions' Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350-6633. 2. Prior to release of utilities or maintenance period commencement the following inspections are f required: Pre -Construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test C 150 PSI for a three (3) hour continuous period. Irrigation coverage tests including initial and final tests. • Finish grade prior to planting. Plant materials prior to planting and soil preparation. • Planting, including street trees. Contact the Parks Planning and Landscape Development ' Section, Engineering Division, for species and final locations. • Compliance with approved plans • Final inspection 3. The Owner's representative and landscape contractor shall be present at each inspection. SHEET INDEX � tic•' I SHEET N0. SHEET TITLE F O R N 1 Ali 1 COVER SHEET 2 CONSTRUCTION PLAN 3-4 IRRIGATION PLANS 5-6-7 LANDSCAPE DETAILS- 8 IRRIGATION SPECIFICATIONS 9-10 PLANTING PLAN 11 PLANTING SPECIFICATIONS 1 MAINTENANCE GUIDELINES Landscape shall be maintained in a neat, dean, weed free and healthy condition. This shall include, but not limited to:' 1. Cultivation of planted beds at intervals (not to exceed ten (10) days. 2. Regular mowing to maintain a lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth. ' 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth.. Drip irrigation may require specialized landscape maintenance care. , 5. Immediate replacement of plant material as needed due to death, disease, or lack of growth. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys and ties, on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunks or branches. 9. Upon completion of the three (3) months or one (1) year maintenance period, the Community Development Department Engineering Division Landscape Inspection staff shall make an inspection. The Landscape shall be maintained in accordance with these landscape maintenance standards Maintenance bonding shall be released at the An of Prepared Under The sup«wsian Of : Date : CITY OF FONTANA, CALIFORNIA oMwM rF M►�OYEG X19 �X�'� p1Y � R.C.E. 25126 .OAIE 12 1 scME oEsiM or.. pE fir! "M DIR. Ma: R.C.E. EXP. VICINITY MAP WALNUT VIL PARKWA BASELINE AVE Q W Q PROJECT LOCATION the appropriate period if the landscape is maintained according to plans and speQifications. 10. The principal bond. holder is responsible to contact the City and schedule. the misnance inspection. pa -o0 ®-�-oo © 3-2q-Oo SITE MAP RETENTION BASIN PLANS 12 IRRIGATION PLAN 13/14 LANDSCAPE DETAILS 15 IRRIGATION SPECIFICATIONS 16 PLANTING PLAN 17 PLANTING SPECIFICATIONS LDA ASSOCIATES, INC. LANDSCAPE ARCHITECTS ENVIRONMENTAL PLANNERS 23276 SOUTH POINTE DRIVE, SUITE 207 LAGUNA HILLS, CAUFORNIA 9M3-" CALIFORNIA LICENSE # 1434 NEVADA LICENSE f 256 00M (714) 454-640 FAX (714) 454-0287 M AL LA S,04 1A t�►�CHAF 9'°� U +�• tiAV o �� ii■ ~ 0 n W D 14 3� > q��� Q OF CAL��O SHEET 1 OF17W� Cn 28641 0