HomeMy WebLinkAbout2847-113
W
W
F—
cn
1
z
J
n
U
F-
I -
UJ
UJ
Cn
I
J
0
z
0
U
U
Q
/
co
aD
CD
/
LO
0
0
/
0
LO
0
N
12'
VARIES
EXISTING EP
22'
12
—� 12'
12'
10' BUFFER ZONE
12'
WORK AREA
550' TRANSITION
STAGE 1 - PHASE 1
SOUTH SIDE OF VALLEY BLVD.
N.T.S.
CVIC`Tlklf-I C0
1100' TRANSITION
YY VI\f\ inI\LP'1
j
25VARIES
'
TYP.
10' BUFFER ZONE
�— 15' 12'
12'
26'
EXISTING EP
STAGE 1 — PHASE 2
NORTH SIDE OF VALLEY BLVD.
N.T.S.
550' TRANSITION
EXISTING EP
� 25'
e e e e P.
10'^BUFFER ZONE ^
WORK AREA
24
25, 10' BUFFER ZONE
1YP, —►
1100' TRANSITION
STAGE 1 — PHASE 3
MIDDLE LANES OF VALLEY BLVD.
N.T.S.
COUNTY OF SAN BERNARDINO
QRpv ESS lON9
TRANSPORTATION/FLOOD CONTROL DEPARTMENT ���,Q���-R K
APPROVED BY: � No. 51616 m
*
Exp. 6-30-02
C / V 1
'CAEF, TRAFFIC DIVISION DATE
PIANS PREPARED UNDER THE DIRECTION OF:
2/25/00
PETER K. KIM R.C.E. # 51616 DATE
MY REGISTRATION EXPIRES 6-30-02
EXISTING EP
19'
12'
12'
12'
12'
1100' TRANSITION
IAJ/-%nii n nrn
10' BUFFER ZONE
12' 15
12' ---�
10' BUFFER ZONE
REVISIONSEngineer
No: Description: Approval Date:
Approval Date:
EXISTING EP
STAGE 3 — PHASE 1
WEST SIDE OF CITRUS AVE.
N.T.S.
1100' TRANSITION
WORK AREA EXISTING EP --/
J
STAGE 3 — PHASE 2
EAST SIDE OF CITRUS AVE.
N.T.S.
BENCHMARK:
PK NAIL IN LEAD 6.46' WEST OF NORTHERLY
CURB RETURN NORTHWEST CORNER OF INTERSECTION
OF CITRUS AVENUE AND SAN BERNARDINO AVENUE,
CITY OF FONTANA DATUM. ELEVATION = 1136.67
PREPARED BY:
ASL Consulting Engineers
348 West Hospitality Lane
Suite 301
San Bernardino, CA 92408
(909) 381 —3666
24'
12'
12'
PTY O FONTANA, CALIFORNIA
TRAFFIC CONTROL PLANS
Drawn: TAS Scale:
AS SHOWN
Designed: JB TYPICAL TAPER DETAILS Date:
7/21/00
Checked: PKC ,� i Dwg. No. 11
Approved: f ' b 2847
CITY TRAFFIC ENGINDATE 11