Loading...
HomeMy WebLinkAbout2830-1J 2" C& SIC (SEE SHEET 3 OF 4) 3 A FUTURE CURB FACE AN= aim RTW— 22L.2LEZ2L.EL#.JHAND HOLE 'X FI] Furnish and install TYPE 90 controller equipment package including TYPE "P" STANDARD cabinet, autoscope BASELINE AVENUE Controller cabinet -------- , 1 134. Furnish and install any additional electronic equipment required to provide the desired signal III= ® Furnish and install TYPE III—BF Service Equipment Enclosure per City of Fontana it � .,11 MAST ARM and Southern California Edison Company requirements (See Special Provisions). ® Furnish and install 3" PVC Sch 80 conduit and pull rope per SCE requirements. " Furnish and install TEL MAST ARM directed by the Engineer (See Special Provisions). TEL TEL TEL i TEL uni—directional, single channel OPTICOM detector, (MODEL 711 or equal), per detail this sheet or as directed by the Engineer (See Special Provisions). ® Construct 4" PCC concrete pad as shown on the plans. .: _ Ai r '" 1 1 4" I 4'3W 4" 4f3 , � 1 4" 1 ---- ---- ____ _ __ � ____ ____ ____ ____-________________________� � � 1 1 r 1 " � 1 ____ ..___ ___- _ __ ____ ____ ____ ____ __________________�.___=__a 1 1 ..�. 1 -__________________________________________________-_______________________� 1 1 1 � MR -A 1 1 -: C�z 1 1 � .JI.,► ��L� 1 1 4 _ 01 FI] Furnish and install TYPE 90 controller equipment package including TYPE "P" STANDARD cabinet, autoscope detection, and appurtenant equipment (See Special Provisions). Controller cabinet and foundation shall be installed per City Standard Drawing No. r 134. Furnish and install any additional electronic equipment required to provide the desired signal operation as shown on the plan, ® Furnish and install TYPE III—BF Service Equipment Enclosure per City of Fontana it � .,11 MAST ARM and Southern California Edison Company requirements (See Special Provisions). ® Furnish and install 3" PVC Sch 80 conduit and pull rope per SCE requirements. ® Furnish and install Image Sensor Unit per city Standard Drawing No. 133 and as MAST ARM directed by the Engineer (See Special Provisions). ® Furnish and install uni—directional, single channel OPTICOM detector, (MODEL 711 or equal), per detail this sheet or as directed by the Engineer (See Special Provisions). ® Construct 4" PCC concrete pad as shown on the plans. a 1,411111111111101:4 9*011 •. 1 1/2#1 TO 34" REDUCER R 101 CLAMP FOR .................. r i�iilllilr M.M; 1� 11.1 will I .& SIC (SEE SHEET 3 OF 4) & 10 0 5 10 20 40 WOMMIAM a" aim GNP ommam R1 �"W " -12 1 b- 12 12 � _ _$ _------------------------------------------ \-2#10 2 (SERVICE ___ 33 BASELINE 1 �____�____________________ ____ ____ -___ ____ ____ ____ ---- 4% 10) 1 L} I � TEL � � ®__=____STELTEL TEL __=-____ ____ TEL �,___ ___® ___ ____ �,___ 8f, 3�� 833 ._ .. L. Yiwc -... mmv www a6 ww. o ®. ww,m ` www: an 071 - _ I I ff � � � f3 if a I 4W -4 111W 4W 43'W 4"w 4�100111111 '1 � 1 1 I 1 5 1 I 1 1 J____________________ __-- a___ -___ ____ ____ ____ ----L0 I 1 I 1 � 1 1 � 1 ASTRO Mini—Brae MOUNT () ( 111 1 1 1 II PELCO AB -121 N' OR APPROVED EQUAL WAVNFMHIIIIIIIIIIIII� tIIIIIIIIIIII, RM 90M goo II R/W GENERAL NOTES Curb/Berm flaw lin F or edge of shoulde Typical signal placement unless dimensions noted on plans. A 1i1Ti. For "A" & "B" dimensions refer to POLE SCHEDULE, or as directed by the ENGINEER.Negative "A" dimensions refer to a distance departing intersection away from BC or EC. SIGNAL STANDARD PLACEMENT DIMENSIONS 1. All work and material shown on this plan shall conform to the State of California, Department of Transportation (CALTRANS) Standard Specifications and Standard Plans dated July 1992. 2, The city right—of way shall be kept clear of debris, with dust and other nuisances being controlled at all times. The Contractor shall be responsible for any clean up on city right -of --way affected by his consruction. The method of street cleaningshall be by dry sweeping of all paved areas. There shall be no stockpiling of construction materials within the city right—of—way without permission from the Engineer. 3. The Contractor shall determine the exact location of all underground facilities and provide protection prior to and during trenching, jacking or boring. Contact UNDERGROUND SERVICE ALERT (USA) at (80 0) 227-2600, and all utility companies involved at least 2 working days before excavating, 4, The Contractor shall obtain all necessary permits. It shall be the Contractor's responsibility to coordinate all phases of construction with the various utility companies involved. 5. Location of all equipment shall be approved by the Engineer prior to final placement. 6. All pull boxes shall be No. 6 unless otherwise noted on the plan, 7. All conduit shall be 2" unless shown otherwise. 8. All vehicle heads shall be per the Special Provisions, All backplates shall be one piece metallic and louvered. 9. Striping shall be by others. SIGNAL STANDARD - A111101. SIGNAL MOUNTING - r _ ,: POLE II I SIGNAL LUMINAIRE_` ■ II IIII POLE it � .,11 MAST ARM 1 II AI POLE LUMINAIRE IVEHIC STREET A. E SIGN HEIGHT MAST ARM MAST ARM LE VEHICLE • .: _ 0*0 4RR R Americana MR -A ................... R 1� 11.1 will I .& SIC (SEE SHEET 3 OF 4) & 10 0 5 10 20 40 WOMMIAM a" aim GNP ommam R1 �"W " -12 1 b- 12 12 � _ _$ _------------------------------------------ \-2#10 2 (SERVICE ___ 33 BASELINE 1 �____�____________________ ____ ____ -___ ____ ____ ____ ---- 4% 10) 1 L} I � TEL � � ®__=____STELTEL TEL __=-____ ____ TEL �,___ ___® ___ ____ �,___ 8f, 3�� 833 ._ .. L. Yiwc -... mmv www a6 ww. o ®. ww,m ` www: an 071 - _ I I ff � � � f3 if a I 4W -4 111W 4W 43'W 4"w 4�100111111 '1 � 1 1 I 1 5 1 I 1 1 J____________________ __-- a___ -___ ____ ____ ____ ----L0 I 1 I 1 � 1 1 � 1 ASTRO Mini—Brae MOUNT () ( 111 1 1 1 II PELCO AB -121 N' OR APPROVED EQUAL WAVNFMHIIIIIIIIIIIII� tIIIIIIIIIIII, RM 90M goo II R/W GENERAL NOTES Curb/Berm flaw lin F or edge of shoulde Typical signal placement unless dimensions noted on plans. A 1i1Ti. For "A" & "B" dimensions refer to POLE SCHEDULE, or as directed by the ENGINEER.Negative "A" dimensions refer to a distance departing intersection away from BC or EC. SIGNAL STANDARD PLACEMENT DIMENSIONS 1. All work and material shown on this plan shall conform to the State of California, Department of Transportation (CALTRANS) Standard Specifications and Standard Plans dated July 1992. 2, The city right—of way shall be kept clear of debris, with dust and other nuisances being controlled at all times. The Contractor shall be responsible for any clean up on city right -of --way affected by his consruction. The method of street cleaningshall be by dry sweeping of all paved areas. There shall be no stockpiling of construction materials within the city right—of—way without permission from the Engineer. 3. The Contractor shall determine the exact location of all underground facilities and provide protection prior to and during trenching, jacking or boring. Contact UNDERGROUND SERVICE ALERT (USA) at (80 0) 227-2600, and all utility companies involved at least 2 working days before excavating, 4, The Contractor shall obtain all necessary permits. It shall be the Contractor's responsibility to coordinate all phases of construction with the various utility companies involved. 5. Location of all equipment shall be approved by the Engineer prior to final placement. 6. All pull boxes shall be No. 6 unless otherwise noted on the plan, 7. All conduit shall be 2" unless shown otherwise. 8. All vehicle heads shall be per the Special Provisions, All backplates shall be one piece metallic and louvered. 9. Striping shall be by others.