Loading...
HomeMy WebLinkAbout2825-1Speed Hump Corms1:ruclit iorm Project Business Drive and Commerce Way Between Slover Av and Santa Ana Av GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 8. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 9. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES FOR EMERGENCY VEHICLES. 10. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 11. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. SIGNING AND STRIPING GENERAL NOTES 1. 24 HOURS NOTICE SHALL BE GIVEN TO THE CITY TRAFFIC ENGINEER FOR APPROVAL OF CONTROL POINTS OR "CAT -TRACKING" PRIOR TO APPLICATION OF PAVEMENT STRIPING. 2. THE CONTRACTOR SHALL INSTALL PAVEMENT MARKINGS AS REQUIRED BY THE CITY TRAFFIC ENGINEER. 3. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATIONS SHEETS. SIGN CODES SHOWN HEREON ARE TO CONFORM TO CALTRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE SHALL BE STANDARD UNLESS OTHERWISE SHOWN ON THE PLANS. 4. ALL SIGNS SHALL BE MOUNTED ON GALVANIZED STEEL POSTS, UNLESS OTHERWISE SHOWN ON THE PLANS, PER CITY STANDARD DETAIL 139. 5. STENCILS USED FOR PAVEMENT MARKINGS AND LEGENDS SHALL MATCH CITY OF FONTANA STANDARD STENCILS EXACTLY. 6. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC UNLESS OTHERWISE APPROVED BY THE CITY TRAFFIC ENGINEER. UTILITIES NOTICE TO CONTRACTOR: UTILITIES SHOWN HEREON AS "PROPOSED" MAY IN FACT BE EXISTING AT THE TIME OF THIS CONSTRUCTION. THE CONTRACTOR SHALL DETERMINE IF ANY "FUTURE OR PROPOSED" UTILITY HAS BEEN CONSTRUCTED. CONTRACTOR SHALL COORDINATE WITH OTHER CONTRACTOR FOR VERIFICATION OF ANY NEW CONSTRUCTION. ELECTRICITY TELEPHONE SOUTHERN CALIFORNIA EDISON CO. PACIFIC BELL 7951 REDWOOD AV 3939 E. CORONADO ST FONTANA, CA 92336 ANAHEIM, CA 92807 (909) 357-6581 (714) 666-5496 GAS SOUTHERN CALIFORNIA GAS CO. 1981 WEST LUGONIA ST. REDLANDS, CA. (909) 357-7781 WATER FONTANA WATER COMPANY 16803 SPRING ST. FONTANA, CA 92335 (909) 822-2201 SEWER CITY OF FONTANA 8353 SIERRA AVENUE P.O. BOX 518 FONTANA, CA. 92335 (909) 350-7610 CATV COMCAST CABLE TV 1205 DUPONT AV. ONTARIO, CA 91761 (909) 988-2999 Speed Hump C:.' C30 " .4% * IrLS MOZ * i C30 IM etaiIs Page 1 - Details CURB & GUTTER ___� I I r► B ffl A f I I ,,,� 10' � 12'+I 10' 150' NP. 12" REFLECTIVE WHITE STRIPES AT 6' ON CENTER BUMP w37 30 it TAPER 15 W6(15) EXIST. A.C. PAVM'T MPH SECTION B -B HUMP 11ZZ� A.0 PAVEMENT : Z,� EXISTING A.C. PAVEMENT 2' 2' 1 2' 1 2' 1 2' SECTION A -A 0 SPEED HUMP DIMENSIONS IN FEET DISTANCE FROM EDGE 0 1 2.0 1 4.0 1 6.0 1 4.0 12.0 1 0 HEIGHT OF A.C. 0 0.12 0.21 0.25 0.21 0.12 0 Page 2 - Specifications City of Fontana Engineering Division Speed Hump Specifications 1. Speed humps are to be constructed of asphalt concrete (A. C.). A. C. shal I be 3/8" DAR 4000 maximum aggregate size or City approved equal. 2. The pavement surface shall be thoroughly cleaned by sweeping and flushing or other means to remove all loose particles of dirt and all other extraneous materials immediately before applying the tack coat to a dry surface. 3. A tack coat of either AR 4000/AR 8000 paving asphalt or SS -1 h emulsified asphalt or City approved equal shall be applied at a rate specif ej in the 2000 Green Book to dry pavement area to be surfaced. 4. The screeded asphalt shape is to be compacted by rolling to the specified speed hump profile. Acceptable tolerance will be %4' variance to the contract checkpoints. 5. Each speed hump is to be placed in a continuous operation to minimize delay to local traffic. Continuous operation will start with pavement cleaning and end with final rolling/compacting of A.C. to final specified hump shape and height. 6. A screed board conforming to the design standard for the shaping of the speed humps shall be fabricated for shaping the hump profile. 7. Prior to pavement marking installations, a pavement seal coat, Guard Top or City approved equal, shall be applied to further protect speed hump from erosion and raveling. CONSTRUCTION NOTES & QUANTITIES: ITEM DESCRIPTION QTY UNIT O1 INSTALL SPEED HUMP PER DETAIL 4 EA 0 INSTALL SIGNAGE AND STRIPING LS LS __T City of Fontana PROJECT VICINITY MAP 'L