HomeMy WebLinkAbout2822-35EE 5HEET I OF 3
FOR INTER5ECTION
DETAIL.
KA
CHERRY
TRAFFIC 51 C NAL INTERCONNECT C ENERAL NOTE5
I. TRAFFIC 5167NAL INTERCONNECT 5HALL CONFORM TO THE STATE OF CALIFORNIA
STANDARD 5PECIFIGATION5 5ECTION ab AND STANDARD PLAN5 (DATED JULY Igg2)
2. LOCATION OF ALL UNDERGROUND FACILITIE5 ARE APPROXIMATE. THE CONTRACTOR
5HALL POTHOLE TO DETERMINE THE EXACT LOCATION5 AND VERIFY ALL CONDITION5
ON THE JOB 51TE. HAND DIC UNTIL CLEAR OF OB5TRUCTION5.
PHONE UNDERGROUND 5ERVICE ALERT AT (800)227-2600, TWD (2) WORKING DAY5
BEFORE DIGGING.
4. CONTRACTOR 5HALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT
LOGATION5 PRIOR TO FINAL PLACEMENT.
5. ALL REQUIRED CON5TRUGTION PERMIT5 5HALL BE OBTAINED FROM THE CITY OF
FONTANA ENGINEERING DIV1510N PRIOR TO COMMENCEMENT OF WORK.
b. ALL TRAFFIC CONTROL, WORK ZONES AND LANE GL05URE5 5HALL BE COMPLETELY
DELINEATED BY CHANNELIZATION DEVIGE5 AND SHIELDED BY BARRIER5 TO EXCLUDE
VEHICLE AND/OR PEDE5TRIAN TRAFFIC. CONTRACTOR 5HALL FOLLOW THE MANUAL
OF TRAFFIC CONTROL DEVIGE5 FOR GON5TRUGTION AND MAINTENANCE WORK ZONES,
GALTRAN5 5TANDARD 5PECIFIGATION5 AND 5TANDARD PLAN5, LATEST EDITION. EXACT
LOCATION OF ALL TRAFFIC CONTROL TO BE DETERMINED BY THE ENGINEER AND
ADDITIONAL WARNING AND/OR CON5TRUGTION 51CNINC MAY BE REQUIRED.
7. TRAFFIC SIGNAL INTERCONNECT PULLBOXE5 TO BE INSTALLED BE AT 200' MAXIMUM
5PACIN6 UNLE55 OTHERWI5E DIRECTED BY THE ENGINEER.
S. 51CNAL INTERCONNECT CONDUIT 5HALL BE PER 5TANDARD 5PECIFICATION5, UNDER
CONDUIT, 5EGTION E, AND PER DETAIL TH15 SHEET.
q. EXI5TINC DRIVEWAY ACCE55 TO BE MAINTAINED BY THE CONTRACTOR AT ALL TIMES.
10. CONTRACTOR 5HALL IN5TALL CONDUIT UNDER ALL DRIVEWAYS U51NO THE BORING METHOD
(5EE 5PEC I AL PROV 151ON5).
ex s/w
2
TRAFFIC 51ONAL INTERCONNECT CONSTRUCTION NOTES
1-11 CONNECT 516 PER CONTROLLER MANUFAGTURER5 REGUIREMENT5.
F2 IN5TALL 2" CONDUIT, #6 PULLBOXE5, AND 51C A5 51-lOWN .
AVENUE
EX. 3" G., 1W
ex s/w
N
\`l i
5
LA
2
CHERRY AVE. AT LIVE OAK AVENUE DETAIL
5GALE : I "= 20'
0
5EE BELOW
FOR CORNER
DETAIL.
z
0
La
z
O
u�
I—
z
zi�
V
d
`L.J
r
Lu
z
z
v
LJ
z
LI
}
�C
LL]
ArO 20 i 40 :! 120
Now•
m
3
FILENAME:3005icOI.DWC
O
SHOULD CONSTRUCTION of THE REQUIRED
IMPR
p O OVEMENT5 NOT GOMMENGE WITHIN Tl�JO
YEAR5 OF THE DATE OF APPROVAL SHOWN HEREON
o AND GARRI ED FORTH I N A DI L I C ENT MANNER, THE
DIAL
BEFORE TWO WORKING G 1 TY ENC I NEER MAY REOU I RE REV 151 ON5 TO THE
DAYS BD DIG RE
YOU DIS PLAN5 TO BRING THEM INTO GONFORMANGE WITH
TOLL FREE I-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 5TANDARD5 IN EFFEGT. REV.
PLAN5 PREPARED BY: CITY OF FONTANA, CALIFORNIA
E 5s lNI LLVAN
<) u. � �'13181 Crossroads Parkway North, 5u1te 405 516NAL I NTERGONNECT PLAN
Industr ,
,` _ �., y GA G 1746-34G�
�A � t'5b2j Gob -6200 DRAWN BY: AL CHERRY AVENUE SCALE:t
-0
Na. 45�2q UNDER THE 5UPER1C151 NOF: CANYON CREST 111-4
Exp, f2 3102 DESIGNED BY: DATE.
p TO
*`s G L \� AL
�� IV L11/� OAK AVE1�1E 4/17/00
l O� NV 4.!? -®O CHECKED BY: APP VE B : DRAWING NO.: 3
DATE G HERBERT L. GLUE5ING .IR. RGE 45 q DATE HL -67 DATE: 2822 3
CI TRAFFIC ENGIN R.C.E. 26690
REVISION DESCRIPTION
DATE
ENGR.
CITY
95