Loading...
HomeMy WebLinkAbout2822-35EE 5HEET I OF 3 FOR INTER5ECTION DETAIL. KA CHERRY TRAFFIC 51 C NAL INTERCONNECT C ENERAL NOTE5 I. TRAFFIC 5167NAL INTERCONNECT 5HALL CONFORM TO THE STATE OF CALIFORNIA STANDARD 5PECIFIGATION5 5ECTION ab AND STANDARD PLAN5 (DATED JULY Igg2) 2. LOCATION OF ALL UNDERGROUND FACILITIE5 ARE APPROXIMATE. THE CONTRACTOR 5HALL POTHOLE TO DETERMINE THE EXACT LOCATION5 AND VERIFY ALL CONDITION5 ON THE JOB 51TE. HAND DIC UNTIL CLEAR OF OB5TRUCTION5. PHONE UNDERGROUND 5ERVICE ALERT AT (800)227-2600, TWD (2) WORKING DAY5 BEFORE DIGGING. 4. CONTRACTOR 5HALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOGATION5 PRIOR TO FINAL PLACEMENT. 5. ALL REQUIRED CON5TRUGTION PERMIT5 5HALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIV1510N PRIOR TO COMMENCEMENT OF WORK. b. ALL TRAFFIC CONTROL, WORK ZONES AND LANE GL05URE5 5HALL BE COMPLETELY DELINEATED BY CHANNELIZATION DEVIGE5 AND SHIELDED BY BARRIER5 TO EXCLUDE VEHICLE AND/OR PEDE5TRIAN TRAFFIC. CONTRACTOR 5HALL FOLLOW THE MANUAL OF TRAFFIC CONTROL DEVIGE5 FOR GON5TRUGTION AND MAINTENANCE WORK ZONES, GALTRAN5 5TANDARD 5PECIFIGATION5 AND 5TANDARD PLAN5, LATEST EDITION. EXACT LOCATION OF ALL TRAFFIC CONTROL TO BE DETERMINED BY THE ENGINEER AND ADDITIONAL WARNING AND/OR CON5TRUGTION 51CNINC MAY BE REQUIRED. 7. TRAFFIC SIGNAL INTERCONNECT PULLBOXE5 TO BE INSTALLED BE AT 200' MAXIMUM 5PACIN6 UNLE55 OTHERWI5E DIRECTED BY THE ENGINEER. S. 51CNAL INTERCONNECT CONDUIT 5HALL BE PER 5TANDARD 5PECIFICATION5, UNDER CONDUIT, 5EGTION E, AND PER DETAIL TH15 SHEET. q. EXI5TINC DRIVEWAY ACCE55 TO BE MAINTAINED BY THE CONTRACTOR AT ALL TIMES. 10. CONTRACTOR 5HALL IN5TALL CONDUIT UNDER ALL DRIVEWAYS U51NO THE BORING METHOD (5EE 5PEC I AL PROV 151ON5). ex s/w 2 TRAFFIC 51ONAL INTERCONNECT CONSTRUCTION NOTES 1-11 CONNECT 516 PER CONTROLLER MANUFAGTURER5 REGUIREMENT5. F2 IN5TALL 2" CONDUIT, #6 PULLBOXE5, AND 51C A5 51-lOWN . AVENUE EX. 3" G., 1W ex s/w N \`l i 5 LA 2 CHERRY AVE. AT LIVE OAK AVENUE DETAIL 5GALE : I "= 20' 0 5EE BELOW FOR CORNER DETAIL. z 0 La z O u� I— z zi� V d `L.J r Lu z z v LJ z LI } �C LL] ArO 20 i 40 :! 120 Now• m 3 FILENAME:3005icOI.DWC O SHOULD CONSTRUCTION of THE REQUIRED IMPR p O OVEMENT5 NOT GOMMENGE WITHIN Tl�JO YEAR5 OF THE DATE OF APPROVAL SHOWN HEREON o AND GARRI ED FORTH I N A DI L I C ENT MANNER, THE DIAL BEFORE TWO WORKING G 1 TY ENC I NEER MAY REOU I RE REV 151 ON5 TO THE DAYS BD DIG RE YOU DIS PLAN5 TO BRING THEM INTO GONFORMANGE WITH TOLL FREE I-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 5TANDARD5 IN EFFEGT. REV. PLAN5 PREPARED BY: CITY OF FONTANA, CALIFORNIA E 5s lNI LLVAN <) u. � �'13181 Crossroads Parkway North, 5u1te 405 516NAL I NTERGONNECT PLAN Industr , ,` _ �., y GA G 1746-34G� �A � t'5b2j Gob -6200 DRAWN BY: AL CHERRY AVENUE SCALE:t -0 Na. 45�2q UNDER THE 5UPER1C151 NOF: CANYON CREST 111-4 Exp, f2 3102 DESIGNED BY: DATE. p TO *`s G L \� AL �� IV L11/� OAK AVE1�1E 4/17/00 l O� NV 4.!? -®O CHECKED BY: APP VE B : DRAWING NO.: 3 DATE G HERBERT L. GLUE5ING .IR. RGE 45 q DATE HL -67 DATE: 2822 3 CI TRAFFIC ENGIN R.C.E. 26690 REVISION DESCRIPTION DATE ENGR. CITY 95