HomeMy WebLinkAbout2818-1ITY OF FONTANA GENERAL NOTESi FOR STREET IMPROVEMENT PLANS I. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (°GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL(909)350-7610. 3. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 4. CURVE DATA REFERS TO THE FACE OF CURB. 5. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 6. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 7. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION. HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 8. ALL MANHOLES, CLEAN-OUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 9. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 10. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 11. TYPE, LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE DETERMINED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS. 12. WHEN CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 13. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 14. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 15. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 16. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 17. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 18. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 19. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 20. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES. 21. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. Underground Service Alert Call: TOLL FREE BENCH MARK: 1-800-227-2600 CITY OF FONTANA BM NO 383 ELEV = 1296.97 PK NAIL IN PP NO. 1329208E 100' WEST OF INTERSECTION CITRUS & FOOTHILL (ADD 1200 TO ELEV FOR DATUM) TWO WORKING DAYS BEFORE YOU DIG 22. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 23. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND $WALE$ FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NONERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 25. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 26. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 27. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. 28. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. 29. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CLOSURE AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 30. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT PRIOR APPROVAL OF THE INSPECTOR. 31. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. 32. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 33. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE " W. A. T. C. H. MANUAL", LATEST EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 35. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 36. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. CALTRANS GENERAL NOTES I. ANY SAW CUTS PROPOSED INTO THE STATE HIGHWAY PAVEMENT SHALL BE PERPENDICULAR AND/OR PARALLEL TO THE STATE HIGHWAY CENTERLI-NE. THE SACHETS SHALL BE ON A LANE LINE OR NOT LESS THAN 0.61m (2') FROM THE EDGE OF THE EXISTING PAVEMENT. 2. NO EQUIPMENT OR MATERIALS MAY BE STORED WITH THE STATE RIGHT OF WAY. 3. ALL WORK WITHIN STATE RIGHT OF WAY SHALL CONFORM TO CALTRANS STATE STANDARD PLANS DATED JULY 1997 AND STANDARD SPECIFICATIONS DATED JULY 1997 AND THE MANUAL OF TRAFFIC CONTROLS DATED 1997. OR LATEST. 4. TRAFFIC SHALL BE MAINTAINED IN ACCORDANCE WITH SECTIONS 7-1.08 & 7-1.09, AND/OR 86-1.05 & 86-1.06 OF THE STATE STANDARD SPECIFICATIONS. 5. A TRAFFIC CONTROL SYSTEM SHALL CONSIST OF CLOSING TRAFFIC LANES AND/OR SHOULDERS IN ACCORDANCE WITH THE DETAILS SHOWN ON THE FOLLOWING CALTRANS' STANDARD PLANS FOR LANE CLOSURES: T-11. ALL TRAFFIC CONTROLS USED FOR THE TRAFFIC CONTROL SYSTEM SHALL CONFORM TO CALTRANS TRAFFIC MANUAL, CHAPTER 5, °MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK ZONES°. 6. THE PERMITTEE SHALL BE RESPONSIBLE FOR REMOVAL OF ANY CONFLICTING TRAFFIC STRIPES AND PAVEMENT MARKINGS DURING THE LIFE OF THE PERMIT. ALL CONFLICTING TRAFFIC STRIPES AND PAVEMENT MARKINGS REMOVED SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER PRIOR TO COMPLETING THE PERMIT. 7. WHENEVER WORK TO BE PERFORMED IS WITHIN 6 FEET OF A TRAFFIC LANE, THE LANE SHALL BE CLOSED (EXCEPT THE WORK OF INSTALLING, MAINTAINING, AND REMOVING TRAFFIC CONTROL DEVICES.) 8. ANY REMOVAL OF EXISTING STATE FACILITIES SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER PRIOR TO COMPLETING THIS PERMIT. EXISTING GRADE OR 200 mm. (8" ) C1 OR 150 mm. (6" CONSTRUCTION NOTES= SERVICE ADDRESS: I 01miAkOTHILL BLVD QUANTITYs �A SAWCUT AT 0.61m (2.00' ) FROM EXISTING EDGE OF PAVEMENT. QRo�ESS/ o • wR 1 ARD NANDEZ � No. 42246 � . 3-31-04 CIVIL ��QK I' �F CA�� Hernandez Kroone � &. Associates, Inc. o CONSULTING ENGINEERS o PLANNING -DESIGN -SURVEYING 234 EAST DRAKE DRIVE SAN BERNARDINO CA 92408 A (909) 884-3222 FAX (909) 383-1577 REMOVE EXISTING IMPROVEMENTS IN AREAS OF PROPOSED NEW CONSTRUCTION. 100 t In (330 ± LF) AC 50 ± m3 Op , 750 CFT) �B CONSTRUCT 0. 102m (4" ) AC PAVEMENT OVER 0. 202m (8" ) AB. AB 90 ± m3 (3, 150 CFT) G CONSTRUCT CURB AND GUTTER TYPE A2-200 PER CALTRANS STD PLAN A87. 40 ± m (130 - + LF) (D CONSTRUCT 3.962m (13') SIDEWALK PER CITY OF FONTANA STD DETAIL 105A. CHECKED BY RH 55m (180 + - LF) REV CONSTRUCT COMMERCIAL DRIVEWAY PER CITY OF FONTANA ENGR C I TY DATE RORER W. WEDDLE-CITY ENGINEER R.C.E. 25126_ STD DETAIL 102-C. I each. (I each) �F CONSTRUCT AC CURB TYPE B, PER CALTRANS STD PLAN A87. 35 ± m (115 + LF) O CONSTRUCT SIDEWALK DRAIN AND CLEAN OUT PER CITY OF FONTANA STD DETAIL 124-A. I each (I each) �H AC TRANS I T I ON FROM 200mm (8u ) CURB TO 150mm (6u ) D I KE. 3m ( 10 ± LF) VARIABLE GRIND AND OVERLAY. 370 ± m2 (39,990 ± SF) 11 � etric R/W TRAFFIC NOTESi I. TRAFFIC SIGNAL AND HIGHWAY SAFETY LIGHTING SYSTEMS PER CALTRANS STANDARD SPECIFICATIONS LATEST EDITION, AS SHOWN ON THE PLANS AND IN THE SPECIAL PROVISIONS. 2. LOCATE ALL SUBSTRUCTURES PRIOR TO CONSTRUCTION. HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTIONS. COORDINATE POLE INSTALLATIONS WITH OVERHEAD UTILITY OR SUBSTRUCTURE OWNERS. PHONE UNDERGROUND SERVICE ALERT AND CONCERNED UTILITY COMPANIES 2 WORKING DAYS PRIOR TO CONSTRUCTION. LOCATION OF UTILITIES AND SUBSTRUCTURES HAVE BEEN SHOWN FROM A SEARCH OF AVAILABLE RECORDS. THE CONTRACTOR SHALL CONDUCT HIS OPERATION IN SUCH A MANNER AS TO PROTECT NOT ONLY THE UTILITIES AND SUBSTRUCTURES SHOWN, BUT OTHER UTILITIES OR SUBSTRUCTURES THAT ARE NOT SHOWN ON THESE PLANS. 3. NEW LOOP DETECTORS SHALL BE 1.8M DIAMETER ( TYPE E ) . CENTER LOOPS IN THE TRAVELED PORTION OF THE LANE, EXCEPT AS SHOWN. 4. VEHICLE INDICATIONS SHALL BE 300MM, PULLBOXES NO. 5 AND CONDUIT 51MM RIGID METAL EXCEPT AS SHOWN. 5. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPLACE THE SIGNAL LOOPS, CONDUITS, WIRES AND OTHER TRAFFIC ITEMS TO MATCH EXISTING AND TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATION. R/W """' ""` "" """ n'"" TYPICAL CROSS - SECTION OVERLAY MAXIMUM DEPTH 50mm (2" ) NTS CONTRACTOR' S NOTEi ALL QUANTITIES INDICATED ON THE PLANS ARE ONLY ESTIMATED AMOUNTS AND ARE PROVIDED FOR COMPARATIVE VALUES DURING THE BID PROCESS. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR VERIFYING THE QUANTITIES DRAWN BY CONDUCTING HIS OWN QUANTITY TAKE -OFF. NOTE= ENGLISH UNITS ARE IN 0a . SERVICE ADDRESS: I 01miAkOTHILL BLVD CALTRANS PERMIT NO. 08 -99 -6 -MC -1160 QRo�ESS/ o • wR 1 ARD NANDEZ � No. 42246 � . 3-31-04 CIVIL ��QK I' �F CA�� Hernandez Kroone � &. Associates, Inc. o CONSULTING ENGINEERS o PLANNING -DESIGN -SURVEYING 234 EAST DRAKE DRIVE SAN BERNARDINO CA 92408 A (909) 884-3222 FAX (909) 383-1577 CITY of FONTANA, CALIFORNIA wSTREET WIDENING PLAN DESIGNED BY RH FOOTHILL BOULEVARD ( S R 6 6 EA ST -OF CITRUS) A.3 P * 99 -?_ 7 SCALE NT$ DRAWN BY BW DATE 03-15-00 CHECKED BY RH APPROVE 74M e7c DRWG _ g.3 SHE�T� OR REV REVISION DESCRIPTION DATE ENGR C I TY DATE RORER W. WEDDLE-CITY ENGINEER R.C.E. 25126_