HomeMy WebLinkAbout2788-1GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA
STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR
PUBLIC WORKS CONSTRUCTION ("GREEN BOOK-). ALL REFERENCE SPECIFICATIONS AND
STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE
RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE
CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR
RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY
DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK.
INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO
THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909)
350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND
PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS,
LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES,
DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK
FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF
INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH
SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS
PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF
CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE
POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT
OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE
INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES,
AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR
SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS
BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES
INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION,
LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM
DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO
WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE
OPERAT014 AND WATER REQQIREMENTS.
13.. CURVE DATA REFERS TO THE FACE OF CURB.
14„ STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE
THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION
CONTROL STAKING DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES
OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17. REMOVAL AND REPLACM OF EXISTING SURVEYCONTROL, INCLUDING SURVEY
MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL
ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED
AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL
NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHAD: MATIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT
ALL TIMES. A MINIMUM -12 FOGT-,L4NE SHALL BE MAINTAINED AT ALL TIMES FOR RESIDENTS
AND EMERGENCY VEHtCLES.
1%, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST
C%4TROL, INCLUDING ADEQUATE WATER#4, AT ALL TIMES.
20� ALL GRADING OPERAT04 SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES
EXCEED 25 MILES PER HOUR.
2'1: THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS
TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY
DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY
INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO
OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE
WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM
UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER
MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25. LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE DETERMINED AT THE
TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM! IN GRADE, COLOR AND FINISH TO
MATCH EXISTING CONCRETE.
27. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN
PLACED, INSPECTED AND APPROVED.
28. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO
PAVING OF STREETS.
29. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO
PLACEMENT.
30. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND
APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER
COMPLETION OF ROUGH GRADING.
31. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR
STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND
SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
32. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO
FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
33. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING,
STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE
CITY TRAFFIC ENGINEER.
34. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRNWLERS AND
SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
35. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF
RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
FONTANA CITY HALL CAMPUS EXPANSION
TELECOMMUNICATIONS CONDUIT/LINES
CONSTRUCTION PROJECT
CONSTRUCTION NOTES 8 QUANTITIES:
ITEM
DESCRIPTION
QTY
UNIT
�1
INSTALL 4" SCH 80 PVC CONDUIT
1164
LF
O2
INSTALL NO.6 PULL BOX PER CIN OF FONTANA STD. DETAIL 143
4
EA
O3
INSTALL 12' DIA. STEEL SLEEVE PER SECTION A -A (SEE SHEET 2 OF 2)
80
LF
O4
R&R 6- CURB (NO GUTTER) PER CIN OF FONTANA STD. DETAIL 101
10
LF
OS
R&R 60 CURB do GUTTER PER CIN OF FONTANA STD. DETAIL 101
25
LF
O6
R&R 4" SIDEWALK PER CIN OF FONTANA STD. DETAIL 105A
70
SF
UTILITIES
NOTICE TO CONTRACTOR:
UTILITIES SHOWN HEREON AS "PROPOSED' MAY IIJFAC? BE EXISTING
AT THE TIME OF THIS CONSTRUCTION. THE CONTRACTOR SHALL
DETERMINE IF ANY "FUTURE OR PROPOSED' UTILITY HAS BEEN
CONSTRUCTED. CONTRACTOR SWILL COORDINATE WITH OTHER
CONTRACTOR FOR VERIFICATION OF ANY NEW CONSTRUCTION.
ELECTRICITY TELEPHONE
SOUTHERN CALIFORNIA EDISON CO. PACIFIC BELL
7951 REDWOOD AV 3073 ADAMS ST.
FONTANA, CA 92336 RIVERSIDE, CA. 92504
(909) 357-6581 (909) 359-2520
SOUTHERN CALIFORNIA GAS CO.
1981 WEST LUGONIA ST.
REDLANDS, CA.
(909) 357-7781
WAT R
FONTANA WATER COMPANY
16803 SPRING ST.
FONTANA, CA 92335
(909) 822-2201
Underground Service Alert
Call: TOLL FREE
1-800
227-2600
rm wowcw IDAYS
IIEFOW YOU M
SEWER
CITY OF FONTANA
8353 SIERRA AVENUE
P.O. BOX 518
FONTANA, CA. 92335
(909) 350-7610
CATV
COMCAST CABLE TV
1205 DUPONT AV.
ONTARIO, CA 91761
(909) 988-2999
ENGINEER'S NOTICE TO CONTRACTORS
THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS
AND PROPERTY: THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE
CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE
ENGINEER HARMLESS FROM ANY AND ALL LIABILTY, REAL OR ALLEGED,
IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT,
EXCEPTING FOR LIABILITY ARISING FORM THE SOLE NEGLIGENCE OF THE
OWNER OR ENGINEER.
UNDERGROUND UTILITIES & STRUCTURES
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR
STRUCTURES SHOWN IN THESE PLANS WAS OBTAINED BY A SEARCH OF
AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO
EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE
CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO
PROTECT THE UTILITIES SHOWN, AND IS RESPONSIBLE FOR THE PROTECTION
OF, AND ANY DAMAGE TO THESE LINES OR STRUCTURES.
"CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE
RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES OR USES OF
THESE PLANS. ALL CHANGES TO THE PLAINS MUST BE IN WRITWG AND
MUST BE APPROVED BY THE PREPARER OF THESE PLANS."
V�lkvkl\l
CITY BID # SB -14-00
CITY OF FONTANA
SAN BERNARDINO COUNTY, CALIFORNIA
MTA PERMIT NO.
City of Fontana
PROJECT VICINITY MAP