Loading...
HomeMy WebLinkAbout2886-1MATCH LINE SEE SHT. 2 'r CLIPTON ST. II� i 1 _ i /* I par . . 1 I ' It r City Required Notes: ittSDC'E[Ions: 1. It is the Landscape Contractor's responsibility to contact the Engtneenng Division's Landscape Inspector 4 hours prior to desired inspection of an Item at (909) 350-6633. 2. Prior to* release of utilities or maintenance period commencement the following inspections are required: Pre Construction Meeting Ins tion of irrigation system in open trench condition (prior to backfill). Mainline Pressure test (� 150 P S.I. for a throe (3) hour continuous geriod. Irrigation coverage tests including initial and final tests. . Finish grade prior to planting. Plant materials prior to planting and soil preparation. Planting, including street trees. Contact the Parks Planning and Landscape Development Section, Engineering Division, for species and final locations. Compliance with aproved plani. • Final inspection. 3. The Owner's representative and landscape contractor shall be present at each inspection. 3 R A CFI INF I1NDgRGROUND UTILIT".LES : THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING OR VERIFYING LOCATIONS OF ALL EXIST' tNG UTILITIES, AND FOR PROTECTION OF SAKE. DAMAGES RESULTING K2OM HIS WORK OR THAI OF HIS SUB—CONTRACTORS SHALL BE RESTORED TO (.►RIGINAL CONDITION AT THSIR OWN M"ENSE. CITY SHALL HAVE THE FINAL SAY IF. REPAIR: ARE TO .BB MADE BY CONTRACTOR OR OTHERS. ALL WORK TO MEET OR EXCEED STATE & LOCAL CODES & INDUSTRY STANDARDS. . WRITTEN DINENSlONS TO PRECEDE SCALED DIMENSIONS. M2;ntemnce Guidelines: T 2nd=pe shall be maintained in a nest, clean. weed Erre and be ttlty eonditioa. 'Chis shall ineludt but not be (imised to: 1. CultiratioN of vl.need beds at inm eals not to exceed ten (1C) days. 2. Regular thawing to maintain taws height not w need two (Z) is cher (w M vary wick speda). 3. Regular pruning of plants v necessary to control and direct gro*VL 4. Scheduled maintwwxz of irrigition eontmUer to assure proper rise ei w►am 0600SM7 for proper plant growth. Drip =gzacn may require land=pe maLi mance care. 3. Immediate rrptar-mcnt of inigztion materials as needed to maintain good waddr�g condition. g. FetjU=tion on a retular wheidule as by the tnanufac== to provide propel plant growth. T. Immediate m -,pair or replacement of irritation materials as needed to maintain good worldng conditiea. S. Seal=, Luys 2nd ties on trees shall be checked mrtlarly !or corn n Auiction. Ties am b be adjusod 10 avoid abrasions or girdling of tr ink or branches, �. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be made by -the Community Development Department Engineering Division landscape inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder Is responsible to contact the Qy and schedule the maintenance inspection. PRESSURE LOSS CALCULATIONS: PROJECT: ^A0*UW* f uEMLXI'-' VALVE NO.:#I EXISTING STATIC PRESSURE: ?K> Service Alert Calk TOLL FREE 422-4133 TWO WORKING DAYS BEFORE YOU DIG COMPONENT SIZE GPM LENGTH LOSS/100' NET LOSS WATER METER z -4o � Q I . °Iv COPPER SERVICE �a 49� OOH 2.07 1 . V1 B.F.P. �� U z�pWU 11.00 MAINLINE �%f r N 2 �� .�o &.00 R.C.V. �� �{ j EBF-U�f�. o 1Z . 00 ELEVATION �o LATERALS SUBTOTAL: (d� 25% FITTINGS: SPRINKLER: TOTAL: , (o PSI: _ go DATE: AGENCY: r�&trA A "47-9"- PHONE 47-9"-PHONE NO.: CHECKED' BY: THE IRRIGATION EQUIPMENT IS SHOWN IN THE STREET/HARDSCAPE AREAS FOR CLARIFICATION ONLY. ACTUAL EQUIPMENT SHALL BE PLACED. WITHIN LANDSCAPE AREAS. VALVE BOXES AND EQUIPMENT INSTALLED ABOVE GROUND TO BE PLACED IN SHRUB/GROUND COVER AREAS WHERE POSSIBLE. STATION NUMBER GALLONS PER MINUTE VALVE SIZE DETAIL/SECTION N MWR SHEET NUMBER rOSC'O;POPE Zedo CP i narprei `rl�T Da F CA — -- --- -- — � , � � ^- — — -� ,-- -- -�-- — -- — — — — -- -- -- — -- — -- e- -] yrut� -aur MaN�.lulE .d•Nt7 1 Wile F t ► �N -- AVENUE SCALE: I"=30'-0" CITY OF FONTANA, CALIFORNIA PUBLIC WORKS DEPARTMENT SCALES SITE PLAN -TRACT 14293 DATES APPROVED: Z -ze. 9f* CIT1 ENGINEER RCE 25126 DATE S"-rf of koon -A-- Lj...J � N O z � Q U aQ MUzQ U z�pWU 0 �#Qwz N QC aN �U EBF-U�f�. o , �o U Dc � U H Q d cn v7 v Z= le- - Ln Ln a O z � Q aQ MUzQ z�pWU �#Qwz o AZ EBF-U�f�. L z z 0 Q C']t �J n Dqf f 2-10-97 plc 97-05 CHOW by L.B. QfvIS OM Atdb cJp Slz-�E.C� ti�►v�2'6 � �NI�b I IF�C..�gIo1.1 c ANp Atm C7 ISMT ur�dtQ Of 6 1 F