Loading...
HomeMy WebLinkAbout2883-T-1E I No :I @OIL a I lilt NMI I 5w, 0 Im *I [ism OVA SHEET KEY MAP: ABBREVIATIONS SHEETINDEX ' r< CITY REQUIRED NOTES: 1. It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours prior to desired inspection of an item at (909) 350-6633. 2 Prior to release of utilities or maintenance period commencement, the following inspections are required: Pre -Construction Meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 P.S.I. for a three (3) -hour continuous period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting and soil preparation. Planting, including street trees. Contact the Parks Planning & Landscape Development Section, Engineering Division, for species and final locations. Compliance with approved plans. Final Inspection. 3. The Owner's representative and landscape contractor shall be present at each inspection. NUE Landscape shall be maintained in a neat, clean, weed -free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth. 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. trip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working conditions. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working conditions. 8. Stakes, guys & ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. TITLE SHEET CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN WALL LAYOUT CONSTRUCTION DETAILS IRRIGATION WATER MAINLINE • SLEEVING MASTER PLAN IRRIGATION. P IRRIGATION P IRRIGATION P IRRIGATION PLAN IRRIGATION PLAN IRRIGATION DETAILS PLANTING t PLANTING PLAN PLANTING PLAN PLANTING PLAN PLANTING PLAN PLANTING DETAILS -SUBMITTALS: _ _ ARPRQ1lAL5. FIRST -SUBMITTAL 11/17/97 CITY SUBMITTAL/CLIENT REVIEW 11/26/97 WALNUT & SAN SEVAINE - CITY SUBMITTAL THIRD SUBMITTAL 1/9/98 2ND PLAIN CHECK CITY SUBMITTAL MOULT1 NJ Lill 1 2/16/98 CITY PLAN CK. CORRECTIONS 2 3/10/98 CITY PLAN CK. CORRECTIONS 3'\ 8/12/98 ON SITE CHANGES 5 3/26/02 CITY REQ. BOOSTER PUMPS CITY OF FONTANA, CALIFORNIA S -7-o . DnAwN BY: JAK INDEPENDENCE @ MORNINCSIDE ' Tmi A. B. Anchor Bolt Int. Integral A. C. Asphaltic Concrete J. Box Junction Box Adj. Adjacent Jts. Joints Alt. Alternate L. A. Landscape Architect Arch. Architect Lic. Licensed Auto. Bldg. Automatic Building L, P. Max. Love Point Maximum C•2 Blk. Black M. B. machine Bolt B. M. B.S. Bench Mark Bottom of Steps Mech. Med. Mechanical Medium m C3 C.B. Catch Basin Min. Minimum C. F. C.1. Cubic Foot Cast Iran M.H. Multi. Manhole Multi -branched C�4 C.1. P. Cast Iron Pipe Nat. Natural C. J. Cold Joint N. 1. C. Not in Contract G. L. Center Line D.C. On Center Clr. Clearance ©. D. Outside Diameter Cm5 C.O. Glean Out P. A. Planting Area C. M. P. Comp. Corrugated Metal Pipe Compacted Perf. P.O. C. Perforated Point of Connection •• C6 Con. Concrete P.S.I. Pounds Per Square Cond. Cont. Condition Continuous P.T. P.V.C. Pressure Treated Poly Vinyl Chloride Cm7 Ct, Center R. Radius Ctr. Sink Counter Sink R. C. P. reinforced Concrete D.D. D.F. Deck Drain Douglas Fir Rebar Rein, Reinforcing Bar Reinforcing W.. D.G. Decomposed Granite Req'd. Required Dia. Diameter Ret. Retardant Dim. Dimension Rgh, Rough Dti. Detail R.S. Rough Sawn Ea. Each r. S. R. Rough Sawn Redwood E. J. Expansion Joint Rwd. Redwood .■ Elec. Electric Sch. Schedule Elev. Eng. Elevation Engineer S. F. Sht. Square Foot Sheet 1=w2 Esp. Espalier Sht, Mtl. Sheet Metal Eq. Equal Sim. Similar E. W. Each Way S.L. Scoreline E.W.W. M. Electric Welded Wire Mesh Smth. Smooth Im3 Ex. Existing Specs. Specifications Exp. Exposed Sq. Square F. F, Finish Floor Elevation Stl. Steel Im4 F. G. Finish Grade T. A. D. Top of Area Drain F.H. Fire Hydrant T & B Top and Bottom Fin. Finish T. B. Top of Berm 1�5 F. L. Flow Line T. C. Top of Curb Fit. Flat Tex, Textured F. S. Finish Surface T. G. Top of Grate 16 Ftg. Footing T.G. D. Top of Grate Drain Ftn. Fountain Thk. Thick Ga. Gauge T.P. Top of Paving Gals. Galvanized T. P. C. Top of Poll Couping PM1 G. C. Ground Cover T.S. Top of Steps G.1. H. B. Galvanized Iron Hose Bib T. W. Tw1. Top of Wall Trowel Pm2 Hdr. Brd. Header Board Typ. Typical Horiz. H.P. Horizontal High Point Vert. W/ Vertical With Pm3 Hgt. Height W/O Without 1. D. Inside Diameter W, S. Water Surface Inv. Invert Pm4 VICINITY A• P 5Pm6 TITLE SHEET CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN CONSTRUCTION PLAN WALL LAYOUT CONSTRUCTION DETAILS IRRIGATION WATER MAINLINE • SLEEVING MASTER PLAN IRRIGATION. P IRRIGATION P IRRIGATION P IRRIGATION PLAN IRRIGATION PLAN IRRIGATION DETAILS PLANTING t PLANTING PLAN PLANTING PLAN PLANTING PLAN PLANTING PLAN PLANTING DETAILS -SUBMITTALS: _ _ ARPRQ1lAL5. FIRST -SUBMITTAL 11/17/97 CITY SUBMITTAL/CLIENT REVIEW 11/26/97 WALNUT & SAN SEVAINE - CITY SUBMITTAL THIRD SUBMITTAL 1/9/98 2ND PLAIN CHECK CITY SUBMITTAL MOULT1 NJ Lill 1 2/16/98 CITY PLAN CK. CORRECTIONS 2 3/10/98 CITY PLAN CK. CORRECTIONS 3'\ 8/12/98 ON SITE CHANGES 5 3/26/02 CITY REQ. BOOSTER PUMPS CITY OF FONTANA, CALIFORNIA S -7-o . DnAwN BY: JAK INDEPENDENCE @ MORNINCSIDE ' SCALE' TRACT. ' • DESIGNED BY. COMMUNITY FACILITIES DISTRICT DATE. JAK 11/17/97 CHECKED BY; APPROWD 8Y -I#.OL DWG. NO.: RWK DA /CITY Z995 ENGINEER RIQ,Ed%44 EXP. DATES JOB NUMBER: co 97093 00 00 LANDSCAPE ARCHITECTURE SITE PLANNING II1 C I p Z 10630 TOWN CENTER DRIVE SUITE 128 0 RANCHO CUCAMC NGA, CALIFORNIA 81730 T� 1 Z PH, (SDS) 484-2800 FAX (SDS) 484-2802 3: OF SHEETS <