HomeMy WebLinkAbout3025-1I � lwjimKWm3
GYTYOFFON MN4 ALINES FOR
1 ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS
AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK'). ALL REFERENCE SPECIFICATIONS AND
STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2 WHEN TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO
PRECEDENCE PROVISIONS IN THE 'GREEN BOOK', THE CONTRACTOR SWILL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER
FOR RESOLUTION.
3 ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4 CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING
DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS
PRIOR TO THE START OF ANY WORK IN PUBUC RIGHT–OF–WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5 THE CONTRACTOR SHALL CONFIRM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF
CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON–METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC
ENGINEER.
6 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER
TRAFFIC CONTROL DEVICES AT ALL TIMES.
7 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5
FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8 THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING
OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE
STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND
MOVEMENT.
9 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A
SEPARATE PERMIT FOR THAT PURPOSE
10 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SWILL BE THE BE THE
RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES,
AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE
ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS
TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM
DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK
AROUND
I THEIR FACILITIES.
12 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY
AUTHORIZATION. CONTRACTOR SWILL. COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER
REQUIREMENTS.
13 CURVE DATA REFERS TO THE FACE OF THE CURB
14 STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE
WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND
CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16 THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MXZNN A ENTS, MONUMENT TIES OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17 REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH
MARKS, SHALL BE DONE BY A REGISTERED CML ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE
DESTROYED AS A RESULT OF THIS CONSTRUCTION SHILL. BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK
PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18 THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE
SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
19 THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT
ALL TILS.
20 ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES
PER HOUR.
21 THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR
PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22 NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23 A GEOTECHNK:HAL ENGINEER SWILL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL
REQUIRE RE–WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
24 CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON
INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON–ERODEABLE SWALES ENTERING OR LEAVING
IMPROVEMENTS.
25 THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION
AND SHALL CONFORM TO THE CITY OF FONTANA STANDARDS DETAILS.
26 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE.
27 THE SEWER CONTRACTOR SHALL STAMP AN 'S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL
28 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED
AND APPROVED.
29 ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
30 APPROVED SOIL STE RILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31 PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE
CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32 ACTUAL THICKNESS OF A.C. PAVEMENT MND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE
RECOMMENDED BY A GEOTECHNICIV REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF
ROUGH GRADING.
33 ALL MANHOLES, CLEAN OUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
34 UPON COMPLETION OF CONSTRUCTION CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING BARRICADES,
AND OTHER TRAFFIC CONTROL DEVICE§ TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35 CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY
THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
36 AS–BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SWILL PROVIDE
RECORD DRAWINGS TO THE CITY ENGINEER.
STR T IM ROV M NT ANS
FOR
�vI NUE= Af JE:> KAIE3 E=
wl
I_
-PROPERTY LINE
R/W
-RIGHT OF WAY
EXIST. CABLE TV CONDUIT
-CENTERLINE
ARCH.
-ARCHITECTURAL
T.C.
-TOP OF CURB
F.L.
-FLOW LINE
F.S.
-FINISH SURFACE
T.S.
-TOP OF CONCRETE SLAB
H.P.
-HIGH POINT
F.F.
-FINISH FLOOR
R.D.
-ROOF DRAIN
R.C.P.
-REINFORCED CONCRETE PIPE
INV.
-INVERT
S =
-SLOPE
F.G.
-FINISH GRADE
S.D.
-STORM DRAIN
T.R.
-TOP OF RAIL
ST.LT.
-STREET UGHT
G.B.
-GRADE BREAK
H
-HEIGHT OF RETAINING
C.F.
-CURB FACE
B.W.
-BACK OF WALK
L.S.
-LANDSCAPING
A.B.
-AGGREGATE BASE
P.V.C.
-POLYVINYLCHLORIDE
C.I.P.
-CAST IRON PIPE
F.H.
-FIRE HYDRANT
P.P.
-POWER POLE
C.B.
-CATCH BASIN
R=
-RATE OF GRADE
B.C.R.
-BEGIN CURB RETURN
E.C.R.
-END CURB RETURN
L.P.
-LOW POINT
S.W.
-STEM WALL
T.O.P.
-TOP OF PIPE
B.O.P.
-BOTTOM OF PIPE
T.F.
-TOP OF FOOTING
T.W.
-TOP OF WALL
C.M.B.
-CRUSHED MISC. BASE
S.F.
-SQUARE FEET
(0.00)
-EXISTING ELEVATION
B.O.W.
-BOTTOM OF WALL
T.G.
-TOP OF GRATE
N.G.
-NATURAL GRADE
TOP
-TOP OF SLOPE
TOE
-TOE OF SLOPE
E.P.
-EDGE OF PAVEMENT
A.C.
-ASPHALT CONCRETE
C.L.F.
-CHAIN LINK FENCE
CONC.
-CONCRETE
PKWY DRAIN
-PARKWAY DRAIN
H.C.
-HANDICAP
EXIST.
-EXISTING
TRANS PAD
-TRANSFORMER PAD
BLDG
-BUILDING
M.H.
-MANHOLE
T.B.
-TOP OF BERM
R.D.
-ROOF DRAIN
R/R.L.
-RIDGE LINE
G.B.
-GRADE BREAK
I.E.U.A.
-INLAND EMPIRE UTILITIES AGENCY
N.R.W.
-NON-RECLAIMABLE WASTEWATER
'c�FH
EXIST.
FIRE HYDRANT
_ - - -CATV- - - -
EXIST. CABLE TV CONDUIT
W
EXIST.
WATER METER
(909) 335-7547
EXIST. EDGE OF A.C. PAVEMENT
e"
EXIST.
WATER VALVE
_ — =
EXIST. CURB AND GUTTER
OCAS `f
EXIST.
GAS VALVE
s 8,.
EXIST. SANITARY SEWER
- - -
GUY WIRE/DEADMAN
– UNDERGRND
NRW 8"
EXIST. NON -RECLAIMABLE WASTEWATER OR
-o- F
EXIST.
POWER POLE
24" S°
=
— -
EXIST. STORM DRAIN
-+--*
EXIST.
TRAFFIC SIGNAL
9400 CHERRY AVE., BLDG. A.
CONTROL DEPT.
-��
EXIST.
CROSSWALK SIGNAL
- - C3
EXIST. GAS UNE
O
STREET UGHTING BOX
T
EXIST. TELEPHONE CONDUIT
FUTURE
EXIST.
STREET LIGHT
_W10"
EXIST. WATER LINE
SDMH
EXIST.
STORMDRAIN MANHOLE
STREET LIGHT 16"
EXIST. CONTOUR
SVIH���a��.—�"
EXIST.
SEWER MANHOLE
REMOVED OR RELOCATED AT -THE DIRECTION OF THE ENGINEER.
vLT. L�-
EXIST.
VAULT
NEW PIPE LINE
_ —
UTILITIES ARE TO BE RELOCATED BY THEIR RESPECTIVE OWNERS.
— - - —
PROPERTY LINE
c-
TREE
NEW FIRE HYDRANT
'
o
NEW WATER METER
TSB ❑
EXIST.
TRAFFIC SIGNAL BOX
•
NEW WATER VALVE
Gm
EXIST.
GAS METER
d
NEW THRUST BLOCK
M13
EXIST.
MAIL BOX
O
NEW SEWER MANHOLE
GUTTER
FOR PUBLIC WORKS CONSTRUCTION.
O
NEW SEWER CLEAN OUT
TMH
5. IN CASE OF ANY ACCIDENTS INVOLVING SAFETY MATTERS COVERED BY
� fmmmmm f li if
CITY OF FONTANA PACIFIC BELL CO.
ATTN: CARLOS NAVARRO ATTN: VIRGINIA BECKER
8353 SIERRA AVENUE 3939 E. CORONADO STREET
FONTANA, 92335 ANAHEIM, CA. 92807
(909) 350-6632 (714) 666-5467
SO. CALIF. GAS. CO.
VNDERGROUND SERVICE ALERT
ATTN: DENNIS FREEMAN
(800) 227-2600
1981 W. LUGONIA AVENUE
REDLANDS, CA. 92374
COMCAST (CABLE TV)
(909) 335-7547
ATTN: JACK HAYES
ME . (800) 427-2200
1205 DUPONT AVENUE
SPRING ST.
ONTARIO, CA. 91761
PROFILE
(909) 390-4738
SO. CALIF. EDISON CO.
NEW A.C. OVERLAY NEW STORM DRAIN PIPE
300 N. PEPPER AVE.
®
RIALTO, CA. 923766
GENERAL TELEPHONE CO.
– UNDERGRND
ATTN: STEVE HOCK
910 875-5100 – TRANS
1400 E. PHILLIPS BLVD.
1909820-5598
213 637-1233 – PIPELINES
ONTARIO, CA. 91766
9091 357-6223 – DISTRICT
(800) 422-4133
SAN BERANRDINO COUNTY
INLAND EMPIRE UTILITIES AGENCY
TRANSPORTATION/ FLOOD
9400 CHERRY AVE., BLDG. A.
CONTROL DEPT.
FONTANA, CA. 92335
825 EAST THIRD STREET
P.O. BOX 697
SAN BERNARDINO, CA.
RANCHO CUCAMONGA, CA. 91729
92415-0835
(909) 357-0241
(909) 387 2800
FAMILIARIZE HIMSELF WITH THE SITE AND SHALL BE SOLELY
F
0
EXIST. TELEPHONE MANHOLE
�
NEW SEWER MANHOLE
FONTANAL ATTERKROHCOMPANY
2
TYPICAL CROSS SECTIONS
ATTN: AX
1854.69
EXIST. GRADE ELEVATION16803
® NEW CATCH BASIN
SPRING ST.
INTERIM – JURUPA AVENUE–STREET PLAN do
PROFILE
FONTANA, CA. 92335
INTERIM – MULBERRY AVENUE–STREET PLAN
NEW A.C. OVERLAY NEW STORM DRAIN PIPE
(909) 822-2201
®
COLD PLANE AND OVERLAY 3 CONSTRUCTION NOTES BUBBLE
aSH97 Of A19M COA67AW7MW&=-
� ■ ■ mmr
CITY/COUNTY BOUNDARY LINE PROPOSED CONTOUR
1. ALL WORK SHALL BE DONE IN STRICT CONFORMANCE WITH THE PROJECT
SPECIFICATIONS AS APPROVED BY THE INLAND EMPIRE UTILITIES AGENCY,
S77lE&TL43qM
THE CITY OF FONTANA AND THE STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION (LATEST EDITION) AND I.E.UA STANDARD
STANDARD DETAIL SHEET OF THIS PLAN SET (SHTS. No. 7 & 'Z) AS APPROPRIATE.
22000 LUMEN HPSV STREET LIGHT (200WATT; X20)
30 FT LUMINAIRE HEIGHT
2. ANY CONTRACTOR PERFORMING WORK ON THIS _PROJECT SHALL
FAMILIARIZE HIMSELF WITH THE SITE AND SHALL BE SOLELY
FUTURE
STREET LIGHT LOCATION W=12'-12'
RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES RESULTING
DIRECTLY OR INDIRECTLY FROM HIS OPERATIONS, WHETHER OR NOT
(22000
LUMEN HPSV; 200 WATT, #20) 32 _O
SHOWN ON THESE PLANS.
EXISTING
STREET LIGHT 16"
3. ALL OBSTRUCTIONS WITHIN THE AREA TO BE IMPROVED ARE TO BE
1
REMOVED OR RELOCATED AT -THE DIRECTION OF THE ENGINEER.
—
_ —
UTILITIES ARE TO BE RELOCATED BY THEIR RESPECTIVE OWNERS.
4.2%I
SPECI�FlCATIONS FOCTOR IS R PUBLIC WORRED TO KS CONSTRUCTIONON 5 OF THE .
T
4. UTILITY LINE LOCATIONS WERE TAKEN FROM RECORD AND WERE NOT
TOP ��
LOCATED IN THE FIELD UNLESS OTHERWISE NOTED ON THE PLAN. THE
CONTRACTOR IS REFERRED TO SECTION 5 OF THE STANDARD SPECIFICATIONS.
GUTTER
FOR PUBLIC WORKS CONSTRUCTION.
8'CF CURB FACE
5. IN CASE OF ANY ACCIDENTS INVOLVING SAFETY MATTERS COVERED BY
SECTION 6424 OF THE CALIFORNIA LABOR CODE, THE CONTRACTOR
FLAN
SHALL IMMEDIATELY NOTIFY THE STATE DIVISION OF INDUSTRIAL SAFETY.
6. CALL UNDERGROUND SERVICE ALERT (800-422-4133) FOR UNDERGROUND
LOCATIONS 48 HOURS BEFORE DIG.
6' 3' DEPRESSION 6' BACK OF 51DElNAIJ(
GUTTER F.L TRANS.
TRANS.
7. THE CONTRACTOR SHALL OBTAIN A TRAFFIC CONTROL PERMIT 48–HRS
TOP OF CURB
PRIOR TO THE TIME OF CONSTRUCTION WITHIN THE PUBLIC RIGHT–OF–WAY
4,4.2%
THE CONTRACTOR IS REFERRED TO SECTION 7-10.3 OF THE STANDARD SPECS.
FOR PUBLIC WORKS CONSTRUCTION.
1"CF "
8. THE CONTRACTOR SHALL RENEW OR REPLACE ANY EXISTING TRAFFIC
A42N 8 CF 8 Cr STRIPING AND/OR PAVEMENT MARKINGS WHICH DURING HIS OPERATIONS
HAVE BEEN EITHER REMOVED OR THE EFFECTIVENESS OF WHICH HAS
PRIOR TO STARTING ANY WORK WITHIN FLOOD CONTROL DISTRICT AND COUNTY RIGHT–OF–WAY, ELEVATION BEEN REDUCED. RENEWAL OF PAVEMENT STRIPING & MARKINGS SHALL
A CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE FLOOD CONTROL DISTRICT AND COUNTY OF SAN BERNARDINO, BE DONE IN CONFORMANCE WITH SECTION 310-5.6 OF THE STANDARD
DEPARTMENT OF PUBLIC WORKS. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO (2) WORKING DAYS SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
PRIOR TO STARTING OF ANY WORK WITHIN DISTRICT AND COUNTY RIGHT–OF–WAY. CALL (909) 387-8046. p/L 9. ALL SEWER MAINS SHALL BE BELL AND SPIGOT EXTRA STRENGTH VITRIFIED
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR
STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE
AVAILABLE RECORDS TO THE BEST OF MY KNOWLEDGE THERE ARE NO
EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS.
THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES
TO PROTECT THE UTILITY LINES SHOWN AND ANY OTHER LINES NOT OF
RECORD OR NOT SHOWN ON THESE PLANS. CONTRACTOR SHALL BE
RESPONSIBLE FOR ANY DAMAGE TO EXISTING WATER do SEWER LINES AND
APPURTENANCES DURING GRADING OPERATIONS AND HE SHALL MAKE OR
CAUSE TO BE MADE THE NECESSARY REPAIRS AT HIS EXPENSE.
PAVEMENT SECTION NOTES:
SUBGRADE SOILS SHOULD BE COMPACTED TO A MINIMUM OF 95% RELATIVE
COMPACTION (ASTM D1557) TO A DEPTH OF AT LEAST 12 INCHES. ASPHALTIC
CONCRETE SHOULD BE COMPACTED TO 95% RELATIVE COMPACTION (CA 304)
AND CONFORM TO THE CITY OF FONTANA REQUIREMENTS.
AMOUNT OF PAVEMENT WILL BE DETERMINED BY SOIL TEST. SOILS
ENGINEER SHALL PROVIDE TESTS AFTER STREETS HAVE BEEN ROUGH
GRADED. PLAN MUST BE REVISED TO SHOW ACTUAL STRUCTURAL SECTION
TO BE CONSTRUCTED.
CONTRACTOR SHALL MAINTAIN THE PIPELINE OPERATION DURING THE CONSTRUCTION.
DIVERSION TIME FOR THIS OPERATION IS 2 HOURS AND SHOULD BE COORDINATED WITH
LE". INSPECTOR DURING CONSTRUCTION.
CONTRACTOR SHALL PUT A TEMPORARY 6' PIPE TO DIVERT FLOW AND MAKE SURE
THAT NO LEAK OR SPILL DURING THIS TEMPORARY CONNECTION OR SHALL PUMP
TO DIVERT FLOW WITHOUT SPILLING ANY INDUSTRIAL WASTE INTO THE GROUND TO
CONTAMINATE THE SOIL
CLAY PIPE (VCP) SEWER PIPE UNLESS OTHERWISE NOTED ON THE PLANS.
30 VAPI
10. PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY LOCATION
JOIN AND ELEVATION OF EXISTING SEWER MAIN(S) AND NOTIFY AND OBTAIN APPROVAL
7PAVEMENT + EXISTING OF THE DESIGN ENGINEER AND IDEA OF ANY VARIATION FROM DESIGN.
13X 2%-� — 11. CONSTRUCTION SHALL NOT BEGIN ON FACILITIES TO BE OWNED BY I.E.UAply,UNTIL AFTER THE ISSUANCE OF A PERMIT BY I.E.UA TO ALLOW THE
IP °'. 3' DEPRESSION PAVEMENT CONSTRUCTION AND ALSO AFTER A PRE–CONSTRUCTION CONFERENCE
NEW AC TO BE HELD AT LEAST 1 WEEK PRIOR TO BEGINNING CONSTRUCTION.
PAVEMENT 12. IN ADDITION, I.E.UA AND THE CITY OF FONTANA SHALL BE NOTIFIED A
MINIMUM OF 48 HOURS PRIOR TO ANY CONSTRUCTION IN THE VICINITY
OF THE TRUNK SEWER OR ANY FACILITIES OWNED AND OPERATED BY I.E.UA
,SECTION AND/OR CITY OF FONTANA.
13. ALL TRENCHING AND/OR SHORING SHALL MEET REQUIREMENTS OF CAL–OSHA.
NOTE: 14. THE CONTRACTOR SHALL SUBMIT COPIES OF HIS DEPARTMENT OF INDUSTRIAL
THE CITY OF FONTANA DRIVEWAY ORDINANCE REQUIRES: SAFETY PERMIT TO I.E.UA AND TO THE CITY OF FONTANA.
1. THERE SHALL BE AT LEAST 20' OF FULL HEIGHT CURB BETWEEN DRIVEWAYS SERVING THE
SAME LOT. 15. SHOP DRAWINGS AS REQUIRED BY THE PERMIT SHALL BE APPROVED BY
2. DRIVEWAY APPROACHES SERVING ADJOINING LOTS SHALL BE SEPARATED BY AT LEAST 1' OF I.E.UA PRIOR TO BEGINNING OF THE CONSTRUCTION.
FULL HEIGHT CURB.
3. NO PORTION OF A DRIVEWAY APPROACH SHALL EXTEND IN FRONT OF AN ADJOINING LOT. 16. UNLESS OTHERWISE APPROVED, LOW PRESSURE WATER TEST FOR THE GRAVITY
4. INSTALL 1/4' EXPANSION JOINT FILLER AT LIMITS OF DRIVEWAY APPROACH. SEWER LINES AND PRESSURE WATER TEST FOR THE PRESSURIZED PIPELINES
SHALL BE PERFORMED IN CONFORMANCE WITH SECTION 306-1.4. OF THE STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION.
MODEY CO NEEK IAL 4%BASIS OF BEARING
N.T.S. THE BASIS OF BEARINGS FOR THIS ASAP IS THE NORTH LINE OF
SECTION 33, SHOWN AS N 89.34 51 E ON RECORD OF SURVEY
FILED IN BOOK 51, PAGES 85 AND 86 OF RECORD OF SURVEYS,
RECORDS OF THE COUNTY OF SAN BERNARDINO, CALIFORNIA.
APPROVED BY: APPROVED BY:
COUNTY OF SAN BERNARDINO
3 Z5 02 cmPA rrmew oP PUBLIC WORIK8
CIVIL ENGINEER FOR IEUA DATE Pja 34b- O -L
CHIEF DESIGN ENGINEER DATE
E ��ieneCrA ��ineerin��c.
SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NM OK I • qGyA
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL �o '� ?, ® mIM4)MI-4011 X14)M1-417.1 DRV
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, `�` i z
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO R.C.E. wo• 43293 * Prepared Under The Supervision Of : OES
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND EV. 3-31-04
OI V Q� '
STANDARDS IN EFFECT. F \�- cHwE
OF Narx�K iN acFDate N;2q;t
�
•��21 o
SANTA AVE.
oMww sr. In
JURUPA
FRANCIS Sr. I UWAY
MM ANA AVE
COUNNImy torr
SAN BERNARD O.
Cl1Y OF FONT
AVENUE
SAN BERNARD/NO CO.
SHEET NO.
DESCRIPTION
1
GENERAL NOTES AND DETAILS
2
TYPICAL CROSS SECTIONS
3
INTERIM – JURUPA AVENUE–STREET PLAN do
PROFILE
4
INTERIM – JURUPA AVENUE–STREET PLAN do
PROFILE
5
INTERIM – MULBERRY AVENUE–STREET PLAN
do PROFILE
6
INTERIM – MULBERRY AVENUE–STREET PLAN
do PROFILE
7
IEUA–STANDARD MANHOLE DETAILS
1101111111 a TTI I
Lai UpftW 2/25/02 I