HomeMy WebLinkAbout3070-11 ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD
PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL
BE LATEST EDITION UNLESS OTHERWISE NOTED.
2 WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN
NOT BE RESOLVED By REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK",
THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR
RESOLUTION.
3 ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4 CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY
DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK.
INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO
THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909)
350-7610.
5 THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND
PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS,
LATEST NON. ---METRIC EDITION UNLESS ,OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER
6 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES,
DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR
TRENCHES 5 FEET OR GREATER IN ..DEPTH FROM THE CALIFORNIA STATE DIVISION OF
INDUSTRIAL SAFETY.
8 THE WALLS . AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET 'IN DEPTH
SHALL BE GUARDED BY SHORING, SLb-GING OF THE GROUND OR OTHER APPROVED MEANS
PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE
OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE
POTENTIAL EXISTS FOR GROUND MOVEMENT.
9 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT
OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION,
HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE
FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES AND TO EXERCISE
PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE. CONTRACTOR SHALL CONTACT
UNDERGROUND SERVICE ALERT AT 1-800--227-2600 TWO WORKING DAYS BEFORE
EXCAVATION.
11 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES
IN `LUDING—, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION,
LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIM WATER, SEWER, STORM
DRAIN, FLOOD CONTROL AND CALTRANS ALL UTILITY COMPANIES SHALL BE GIVEN TWO
WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT
APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE
APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13 STATIONING REFERS TO THE CENTERLINE, OF SEWER EXCEPT WHERE OTHERWISE NOTED.
14 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE
THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION
CONTROL STAKING DURING CONSTRUCTION.
15 THE CONTRACTOR SHALL . NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR
BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
16 REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL INCLUDING SURVEY MONUMENTS,
MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR
LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT
OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE
ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TEES TO MONUMENTS CAN BE
ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
17 THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL
TIME & A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE
CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
18 THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL,
INCLUDING ADEQUATE WATERING, AT ALL, TIMES.
19 THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO
BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY
DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL
20 NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY
INSPECTOR.
21 A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN
THE REQUIRED DENSITY SHALL REQUIRE RE --WORKING OF THAT PORTION OF THE WORK
UNTIL THE SPECIFIED DENSITY IS OBTAINED.
22 CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING
STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE
TEMPORARY, NON--ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
23 ALL EXPOSED CONCRETE SURFACES S=HALL CONFORM IN GRADE, COLOR AND FINISH TO
MATCH EXISTING CONCRETE
24 IF SEWER CONSTRUCTION IS TO BE DONE IN' PHASES, THE CONTRACTOR SHALL PROVIDE A
TERMINAL CLEANOUT AT THE PHASE BOUNDARY, NOT MORE THAN 150 FEET FROM THE
DOWNSTREAM MANHOLE, SEE. CITY OF FONTANA STANDARD DETAIL FOR TERMINAL CLEANOUT.
25 SANITARY SEWER LINES SHALL BE CONSTRUCTED OF BELL AND SPIGOT OR BAND SEAL TYPE
VITRIFIED CLAY PIPE (V.C.P.) EXTRA STRENGTH CLASS AND SHALL CONFORM TO THE
PROVISIONS OF THE ASTM DESIGNATION 0700 FOR V.C.P.
26 NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL
OF THE CITY ENGINEER.
BASIS OF BEARING:
BASIS OF BEARING BEING THE
SOUTH LINE OF NE 1/4 SECTION
35, T1 S, R6W, SBBM . SHOWN AS N
89047'11" W ON TRACT NO.
15655-61 M.B. 264,47-49,
RECORDS OF SAN BERNARDINO
COUNTY.
BENCHMARK
BM #8-17 ELEV=1428.609
DEPARTMENT OF TRANSPORTATION
BRASS DISC. MARKED 8-17
NORTH SIDE FO HIGHLAND 1300 FEET EAST
OF CHERRY ON THE BASE OF AN EQISON
TOWER,
27 SHORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE
WALLS TO ALLOW FOR MINOR DEFLECTIONS IN ALIGNMENT.
28 PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND
VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO
EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN
ON THE PLANS.
29 ALL 4" HOUSE LATERALS SHALL BE INSTALLED AT A 2% MINIMUM GRADE UNLESS
OTHERWISE APPROVED BY THE CITY ENGINEER
30 TERMINATE ALL 4" HOUSE SEWER LATERALS 3 FEET INSIDE THE LOT WITH A PLUG 12"
BELOW THE GROUND SURFACE WHEN PUBLIC UTILITY EASEMENTS EXIST NEXT TO THE
STREET RIGHT OF WAY, ' THE LATERAL SHALL TERMINATE 3 FEET INSIDE THE LOT AS
MEASURED FROM THE UTILITY EASEMENT.
31 THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE
LOCATION OF THE SEWER LATERAL
32 IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED
IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED
AGENCIES IMMEDIATELY.
33 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL. HAVE BEEN
PLACED, °INSPECTED AND APPROVED.
34 ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO
PAVING OF STREETS.
35 APPROVED SOIL-STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO
PLACEMENT.
36 ALL IMANHOLES, CLEAN-OUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO
FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
37 UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL_ RESTORE ALL. SIGNING, STRIPING,
BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES . TO THE SATISFACTION OF THE CITY
TRAFFIC ENGINEER.
38 AS --BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF
RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER
3" MAX SIZE NATIVE --
SOIL, COMPACTED 95%
6" MIN.
10" MAX.
6" MAX SIZE NATIVE-
SOIL,
ATIVE-SOIL, COMPACTED 90%
1/2 CRUSHED --!
STONE BEDDING
PER, STD. SPECS.
FOR PUBLIC WORKS
CONSTRUCTION
TABLE 200-1.2(A)
SHOWN BELOW
cv
6" MIN.
10" MAX.
1" MAX SIZE SELECTED
NATIVE BEDDING COMPACTED
TO 90%
z
N
rk
FL o
SIZE PER
PLAN TYPICAL BEDDING FOR " VCP
10 R DEPPER
SCALE: 1" = 2'
>
>: > >0
< e'- j1% a MILLER AV @ < �-
1 [r> —1 U D
Uj TRACT= Q kit W
EXIST N- �SCHOOL SITE 166 6
<
a""
FOOTHILL BL
ARROW BL
l -
mom
T I VICINITY MAP
H H
NTS
H Els
1TIMA' F
.. ...... S.T!R!JQTIQN N TD.U.ANTITIE5
.:� < ,
two
PHASE I PHASE II
0 j , #5
M I ° ' REMOVE EXISTING CLEANOUT 1 0 LS.
� w 2 CONSTRUCT. 8" VCP SEWER MAINEXTRA STRENGTH) ) 2., 500 1,640 L.F.
SI-# ET L. ( CONSTRUCT PRECAST CONCRETE MANHOLE PER CITY STD. DWG.NO. 112 10 5 L.F.
CONSTRUCT SEWER LATERAL AND HOUSE CLEANOUT PER CITY STD. NO.125 1,850 1,600 L.F.
'1.
REMOVE EXISTING SEWER MAIN AND MAKE CONNECTION TO EXISTING SEWER MAIN 142 -0 L.F.
Q INSTALL BACKFLOW VALVES 15 15 EA
( � 8
CAP SEWER MAIN FOR FUTURE CONNECTION 2 0 L.F.
CONNECT EXISTING SEWER MAIN 1 2 EA.
soup—
...*�.pw
I
S E 3 i T t
!C4 I
TRACT 14293 w TRACT 14293 .
ICALIFORNIA COUNCIL OF CIVIL ENGINEERS AND LSD SURVEYORS.
,®..� CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
-ST CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE
doom,�. - I AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
1 CONSTRUCTION OF THE PROJECT. INCLUDING SAFETY OF ALL PERSONS 'AND PROPERTY, THAT
3" MAX SIZE - NATIVE -
SOIL, COMPACTED 95%
6" MIN.
10" MAX.
'31 C14
6" MAX SIZE NATIVE�-
SOIL, COMPACTED 90%
VCP SIZE -'PER PLAN
MAP PHASING
NTS
6" MIN.
10" MAX.
. •t �---r(P.
r_.a'i .
�I
1" MAX SIZE SELECTED
NATIVE BEDDING COMPACTED
TO 90%
It
LESS A DEEP
SCALE: 1" - 2'
TABLE : 200-1.2(A)
THIS REQUIREMENT SHALL BE MADE TO APPLY Ct?NTINUOUSLT AND NOT BE LIMITED TO NORMAL
WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY
AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR
ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK IN THIS PROJECT, EXPECTING
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL.
N OTT*
QUANTITIES SHOWN ARE FOR BONDING PURPOSES ONLY. CONTRACTOR IS RESPONSIBLE
FOR VERIFYING ALL QUANTITIES PRIOR TO BIDDING AND -CONSTRUCTION.
"*" INDICATED THE PAVEMENT SECTION SHALL. BE SUBMITTED TO SOIL ENGINEER'S
APPROVAL. ALL PAVEMENT SECTION RECOMMENDATIONS BASED ON "R" VALUE ANALYSIS
OF THE SUB -GRADE SOIL, AND EXPECTED TRAFFIC INDEX.
SIEVE SIZE
PERCENTAGE
PASSING SIEVES
11/2
--
.Attn: Carlos Navarro
Attn: Virginia Becker
3/4"
100
1/2"
90- 60-
3/8"
20-60
NO.4
0-15
NO.8
0-5
ASTM C131
TEST GRADING
B
City of Fontana, utility
notification list
City of Fontana
Pacific Bell Co.
.Attn: Carlos Navarro
Attn: Virginia Becker
8353 Sierra Avenue
3939 E. Coronado Street
Fontana, CA 92335
Anaheim, CA 92807
(909) 350-6632
(714) 866-5467
So. Calif. Gas Company
Underground Service Alert
Attn: Dennis Freeman
(800) 422-4133
1981 W. Lugonia Avenue
Redlands, CA 92374
Comcast ( Cable TV }
(909) 335--7547
Attn: Jack Hayes
Emergencies: (800) 427-2200
.1205 Dupont Ave.
Ontario, CA 91761
So. Colif. Edison Company
(909) 390-4738
300 N. Pepper Avenue
Rialto; CA 92376
General Telephone Company
(:909) 820-5598 - Underground
Attn: Steve Hock
(909).875-5100 _ Transmission
1400 E. Phillips Blvd.
(213) 637-1233 - Pipelines
Ontario, CA 91766
(909) 357--6223 Distribution
(800) 422-4133
(800) 422-4133
Fontana Water Company
Crawford Canyon Mutual Water Co.
Attn: Michael J. McGraw
Attn: Bill Vanderkieft, Jr.
8440 Nuevo Avenue
(619) 868--6040
Fontana CA 92235
(909) 822-2201
Fax: (909)'823-5046