WEED CONTROL:
J.
WATERING: 'When the pit has been backfilled to three—
E.
INSTALLATION: Sod shall be laid in a staggered
2. Spray the area with a uniform visible coat using
B.
RESPONSIBILITY.• The Contractor shall be held
A. FiNAL CONSTRUCTION INSPECTION: When all landscape
quarters of its depth water shall be poured about the
pattern, with tight joints and in the some direction
the dark color of cellulose fiber or organic
responsible for the care and preservation of all
improvements have been installed in accordance with
A.
KILLING WEED",': Contractor shall germinate and destroy
roots. Air pockets shall be eliminated and backfill
each time. On all slopes sod shall be installed from
amendment as a visible guide. The slurry shalt
existing buildings and structures on the property and
the plans and specifications the Contractor shall.
existingweed seeds before preparing areas for
P P g
continued until the backfill is brought to the grade
the bottom u and the newt lard sort should be
P y
be applied in a downward drilling motion via a
PP g
adjacent premises. Any part of them injured, damaged
notify the Landscape Architect and request a Final
Y P q
planting. Sufficient water shall be applied to cause
levet.
protected by walking on boards as installer moves
fan stream nozzle.
or disturbed because of his work shall be repaired,
Constructions Inspection. If the Landscape Architect
week seed to sprout. Young weeds shalt then be
upward. On metal staples will be allowed. No sod of
replaced or cleaned by him at his expense.
determines the work to be substantially complete and
destroyed and removed before they have opportunity to
K.
COMPACTING. Backfill shall not be compacted around
less than 18" in length will be allowed. No sod of
G.
TIME LIMIT- All hydrosturry mixture that has not been
in conformance with plans and specifications, the
set seed.
the roots or ball of the plant during or after
less than 180 in length will be allowed
used within two (2) hours shall be disposed of off—
Contractor will be advised that the basic maintenance
planting. The backfill on which the plant ball rests
site at the Contractors expense.
period is started.
B.
ADDITIONAL REQUIREMENTS: For additional weed killing,
shall be lightly compacted.
F.
JOINTS. Adjoin the section of sod firmly together.
XVW.GUARANTEE:
refer to Planting Notes on the Planting Plan.
If air spaces occur between sections of sod they must
H.
CLEAN—UP: Any slurry sprayed or spilled in an area
L.
STAKING. Stakes shall be driven to sufficient depth
be filled with sand or have the sod relaid.
other than that designated In the plans shall be
A.
SHRUBS: All shrubs shall be guaranteed as to growth
WI.
SOIL PREPARATION:
to hold tree rigid. Tree shall be supported by at
cleaned up at the Contractor's expense.
and health for a period of ninety days after
least two ties (see details).
G.
ROLLING: Roll sod with an adequately weighted roller
completion of the specified maintenance period and/or
A.
SOIL REPORT Before starting soil preparation the
to smooth out the sod bed.
1.
RESEEDING. All bare spots shall be reseeded by the
final acceptance by the Owner.
1. In order to be substantially complete, at least
Contractor shall submit a soil report to the Owner and
M.
PRUNING: Limbs, branches, canes and runners which
Contractor within ten (10) days. The Contractor will
the following must have been finished:
Landscape Architect. If no soil report is submitted
p p
require trimming shall be removed to leave a clean cut
H.
PROTECTION OF EDGES: Re rade to protect the edges
g P 9
be responsible for all reseed areas for as long after
P 9
B.
TREES: Trees shall be guaranteed to live and grow in
it will be assumed that amendments were not added and
flush with trunk. (Pruning only as directed by the
from drying if mowing edge is not used.
seeding as necessary until an acceptable stand of
acceptable upright position for one year after the
a. All fine grading, including elimination of
the Landscape? Contractor will be requested to give a
Landscape Architect).
hydroseeded material is realized and approved by the
specified maintenance period andror final acceptance
low points that hold runoff
credit for soil preparation.
1.
WATERING: After installation sod must be kept
Owner.
by the Owner. The owner must provide adequate
b. A complete and operable irrigation system.
N.
PLANTING BEDS. Planting beds shall be edged and
thoroughly watered to a depth of 6". No foot traffic
maintenance to insure the extended guarantee on trees.
C. Installation of all plant materials.
B.
COMPACTED AREAS. Soil areas that are compacted to
cultivated to the line shown. Beds shall be brought
should be allowed for 2 or 3 weeks from the date of
J
GERMINATION STAGE IRRIGATION: Approximately twenty
d. Seeding of all seeded areas.
more than 922X during site preparation shall be ripped
to a smooth even surface conforming to established
Installation.
five (25) hours after hydromulching the planting
C.
DEFINITION OF DEATH: Plants which die or lose more
to a minimum of 12 prior to beginning soil
grades after full settlement has occurred.
areas, initiate the watering sequence. The water
than 30% of their original leaves shall be replaced.
2. Minor pick—up items may be completed during the
preparation. These areas shall be defined by the
J.
INSPECTION BY SUPPLIER: if there are any questions
should be left on long enough to moisten the soil
basic maintenance period such as:
Landscape Architect and be billed as an
XI.
SHRUB COVER AREAS.
regarding the quality of sod installation a
thoroughly to the depth of the fiber, taking care not
D.
REPLACEMENT The Contractor within seven (7) days of
extra if the unit price is quoted in the bid.
representative of the supplier shall be requested to
to super saturate or to wash the fiber or soil
written notification by the Owner shall remove and
o. Resodding of bare spots in lawn.
A.
REFERENCE: Refer to Paragraphs V. W. Wil. for
inspect the installation and the Contractor called out
particles off the slopes. The Contractor will have to
replace all guaranteed plant materials which, for any
b. Replacement of damages or non—conforming
C.
METHOD OF MIXING: If the slope is under 2 1/2 to 1
finish grading, weed control, and soil preparation,
by the supplier's representative.
repair all seed washing or erosion at his own expense.
reason, fall to meet the requirements of this
plant material.
the soil preparation materials should be broadcast
The fiber and seed must be irrigated lightly and
guarantee. Replacement shall be made with plant
C. Re—staking or tying of trees.
uniforms over all landscape areas and worked to a
y p
B.
SOIL PREPARATION: Prepare the soil as per these
X11.
SEED LAWN PLANTING (IF APPLICABLE):
{ )
frequently to maintain optimum moisture content for
q Y P
materials as indicated or specified for the first
p
d. Lowering of sprinkler heads to grade after
depth of 60 t► a rototiller or other acceptable
P Y P
specifications and the planting Notes on the Planting
maximum germination. At all times the irrigation
planting and all such replacement materials shall be
P g P
turf has established.
mechanical means to obtain a uniform blend to
Plan.
A.
REFERENCE. Refer to paragraphs V, W, W11, for
system must be observed while in operation.
guaranteed as specified for the original guaranteed
e. Replacement of unauthorized substitutions.
the soil. If the slope is greater than 2 1/2 to 1 the
finish grading, weed control, and soil preparation.
irrigation sequence must be determined by air
material.
amendments shall be hydraulically applied for areas
C.
GRADING: Areas shall be raked and floated smooth to
temperature, prevailing wind velocity, soil texture,
over 1000 square feet and raked in for small areas.
q
provide a true and uniform surface.
B.
PREPARATION: Cultivate to a depth of 2' below finish
P
orientation and other logistical problems. It is
9 P
XIX.
MAINTENANCE
For the soil amendment mix refer to the Planting Notes
on the PlantingPlan.
D.
PLANT PITS AND FERTILIZER; Planting pits for ground
grade, remove stones, foreign growth of any kind and
extraneous matter, and rode to remove ridges and
9 9
imperative that the soil be kept moist at all times
during the germination period.. The light, frequent
9 9 P 9 q
A.
MAINTENANCE PERIOD: The maintenance period shall
B. FINAL MAINTENANCE INSPECTION: At the end of
s 0
cover shall be 4 x 4 or adequate to accept material
depressions so that areas after settlement will
P
irrigation sequence should continue until the
g q
commence upon the Owners written approval of all
maintenance period and when ground covers and turf
D.
EXTRANEOUS MATERIAL: to addition to the work
from flats without crushing or deforming the rootball.
9 9
conform to the finish grade. Roll and rake lightly
seedlings have grown beyond the germination stage.
phases of planting installation and shall be for the
have established and all pick—up items have been
P P
specified abo%fe the Contractor shall remove all
P
Place a 20-10-5— Agriform 5 gram fertilizer tablet in
until the surface is smooth, friable and of uniform
following period: 90 DAYS.
completed, the Contractor shalt request a final
maintenance inspection. The Contractor will be
extraneous material that is exposed on the surface and
grade to facilitate run—off of surface water.
E.
each round cover.
9
PLANTING: All ground cover areas noted on the plans
fine texture.
K.
ESTABLISHMENT STATE IRRtGATIDN: The irrigation
sequence (frequency) shall be reduced while the
B.
GENERAL: The general care and maintenance of all
P
advised by the Landscape Architect at the final
shall be rooted cuttings from flats and shall be
C.
SOWING: Sow lawn seed in the area designated on the
duration of each watering cycle will- be increased. A
areas shall consist of proper watering, fertilization,
Inspection that work is or is not satisfactory.
E.
DELIVER SLIPS,- Supply deliver slips from the
PpY Y P
planted in staggered rows continuously under all trees
All
drawings at the rate as designated on the planting
9 9 P 9
specific watering program shall be approved b the
P g P 9 PP Y
weeding, clean—up to maintain all plants and turf in a
1. If the work is satisfactory, the basic
supplier for the soil amendments to the site (Bulk
and shrubs at the spacing indicated on the plans.
notes. Sow the lawn in two directions.
Owner and Landscape Architect but should approximate
healthy, growing condition and as noted below.
loads from the Contractors yard will not be accepted,
plants shall be protected from drying out prior to
watering once a day through completion of the
maintenance period will end on the date of the
Supply empty bags for fertilizer to the Superintendent
planting.
D.
TOP DRESSING: Rake lightly, spread 1/4' of Por -5 top
maintenance period.
C.
GROUND COVER: Ground cover from flats—areas without
final inspection.
of the job.)
dressing with a mechanical spreader, roll with 200 !b.
roller and water with a fine spray.
L.
HARDENING OFF STAGE IRRIGATION: At the end of the 90—
overseed — apply a pre—emergent herbicide in
accordance with the manufacturer's printed
2. !f tithe work is on the basic
Vlll.
SHRUB AND TREE PLANTING.
day establishment period, as determined by the
instructions.
period will
maintenance period will continue at no
F.
WATERING. Each section of ground cover shalt be
Xlli.
HYDROSEEDiNG SPECIFICATIONS (IF APPLICABLE):
Landscape Architect, reduce the watering frequency to
additional expense to the Owner until the work
A.
CORRELATION: Trees and shrubs shall not be planted
immediately watered upon completion of planting, and
once ever three 3 days, while increasing the
Y () Ys 9
D.
FERTILIZATION: Maintenance work shall include
has been completed, inspected and approved by
until all operations in conjunction with the
p j
thereafter as required.
A.
GENERAL: The hydro—mulch shall be applied in the form
Yd PP
duration of the water sufficiently to allow for
Y
fertilization with a commercial fertilizer at 30 day
the Landscape Architect.
P
installation of the sprinkler system have been
completed, final grades have been established, and the
G.
SPACING FROM EDGE: The first row of ground cover
of a slurry consisting of wood cellulose fibre, seed,
chemical additives, commercial fertilizer and water.
maximum water penetration for the expanding root
system, while at the same time taking care not to
intervals as noted herein. The fertilizer may be
superseded by the soils report and shall be approved
C. FAILURE TO PASS INSPECTION: if work fails to pose
planting beds properly prepared b cultivation and
p g p p y p p y
should always be within 6s of the edge of the planting
When hydraulically sprayed on the soil surface the
y yP
cause erosion. The precise watering reduction program
9 P 9
by the Landscape Architect.
final inspection, any subsequent inspections must be
fertilization an covered in these specifications.
area.
hydromulching shall form a blotter like ground cover
shall be determined by the Landscape Architect.
rescheduled as per above, and will be charged to the
P 9
impregnated uniformly with seed and fertilizer and
E.
WEEDING: Any concentrated development of weed growth
Contractor at the prevailing hourly rate of the
B.
HANDLING AND STORAGE: All plants shalt be handled and
X
SEASONAL COLOR:
shall allow the absorption of moisture and rain fall
XIV.
SCOPE OF EROSION CONTROL WORK.
that may appear in planting areas during the
Landscape Architect.
stored so they are adequately protected from drying
to percolate to the underlying soil. hydro—mulch
maintenance period shall be removed at 10 day
out, sun, windburn or an other injury.
Y
A.
REFERENCE; Refer to Paragraphs V. W. 1/1!. for finish
specifications may be superseded b the Horticultural
P Y P Y
A.
EROSION CONTROL: Installation will be required in
q
intervals. The Contractor shall remove such
grading, weed control, and soft preparation.
9 g. P P
soils test.
locations specifically delineated on the drawings or
concentrations of weeds manually.
C.
PLANTING TIME:: No planting shall take place during
as necessary due to field conditions.
extremely hot, dry, windy or freezing weather.
B.
SOiL PREPARATION: Prepare the soil as per these
B.
SEED MiXES. Seed mixes to be used on this project are
F
GROUND COVER AREAS: Cultivate all non—hydroseeded
specifications and the Planting Notes on the Planting
designated on the plans and noted in the plant legend.
1. The surface of the slopes shall uniformly smooth
ground cover areas at not more than 10 day intervals.
D.
LOCATIONS: Relative position of all plants and trees
Plan.
C.
GUARANTEE. The Landscape Contractor shall be
and even with all debris and rocks raked out.
is subject to approval of the Landscape Architect and
responsible for the quality of all labor and materials
The soil shall be sufficiently moist to permit
G.
SHRUBS AND TREES: All shrubs shall be pinch—pruned as
they shall, if necessary, be relocated at his
C.
GRADING. Areas shall be raked and floated smooth to
as provided by subcontractors and suppliers, including
the firm laying of erosion control matting and
necessary to encourage new growth. Dead, wilted
direction as Fart of this contract.
provide a true and uniform surface.
seed mix, hydroslurry ingredients and their
to prevent sloughing of topsoil.
flowers and dead folloge shall be continuously
application.
removed. No pruning shah be done to shrubs or trees
E.
DISTRIBUTION: No more plants shall be distributed
D.
QUALITY OF PLANTS: Plants shalt be healthy annual
2. The erosion control matting shah be laid with
without the approval and under the direction of the
about the landscape area than can be planted and
plant material in 4 pots in boom.
D.
PRESOAKING SEED: Seed noted to be pre—soaked shall be
the direction of flow of surface drainage, and
Landscape Architect. Al! wounds over 1-1/2 inches in
watered on the some day.
done so in clean potable water for twelve (12)
in accordance with the manufacturer's
diameter shall be sealed with an approved tree seal.
F
PLANT PITS AND FERTILIZER: Each plant pit for
consecutive hours prior to hydroseeding. After
directions. The matting shall be cut to provide
F.
CONTAINER REMOVAL: Plant containers shall be removed
seasonal color shall be 6x6 x60 with one teaspoon of
soaking is started, seed that drys out will be deemed
a visually pleasing slope.
H.
TURF AREAS: Edge and mow to a height of 2 inches
when planting the plants. Cans shall be split on both
bone meal mix into the backfill mix. (Use shrub
unacceptable.
whenever the turf reaches a height of 3 inches. Grass
sides. An axe or spade shall not be used. All
backfill mix). Do not use Agriform plant tablets.
3. The matting shall be stapled in place and firmly
clippings shall be removed off-site.
containers shall be removed from the site.
E
PREPARATION:
embedded by means of tamping or rolling, as
G.
WATERING: Each section of seasonal color shall be
approved by the Owner, to ensure that the
I.
SUBSURFACE DRAINS: All subsurface area drains shall
G.
PLANTING PIPS: All tree and shrub pits shall have a
immediately watered upon completion of planting, and
1. All hydroslurry mixes shall be mixed at the site
matting Is in contact with the soil and that no
be periodically flushed with clear water to avoid
diameter of at least twice the diameter of the
watered thereafter as required.
under the observation of the Owner and Landscape
erosion can take place under the matting.
build—up of slit and debris. Keep alt drain inlets
rootball. Pit depths shalt be minimum 120 deeper than
Architect as it is placed in the hydroslurry
clear of leaves, trash and other debris.
the rootball for trees and 80 deeper than the root
H.
SPACING FROM EDGE: The first row of seasonal color
tank.
4. Planting of turf, ground covers, shrubs and/or
ball for shrubs or as per planting details.
should always be within 6' of the edge of the planting
vines may be required in areas protected by
J.
PROTECTION: During the maintenance period, the
area.
2. Begin slurry preparation by adding water to the
erosion control matting as specified in the
Contractor shall be responsible for maintaining
H.
PLACING. Plants shall be placed and held during
tank when the engine Is at one—half throttle.
plans or as becomes necessary.
adequate protection of all planting areas. Any
backfill in an upright position in the center of the
XI.
SOD LAWN MATERIALS & PLANTING ( IF APPLICABLE) :
When the water level has reached the height of
the agitator shaft and good recirculation has
XV
REPLACEMENTS.
damaged areas shall be repaired at the Contractor's
pit. Plants shall be held at, or slightly above
expense.
nursery level. The earth ball shall be kept intact.
Any exposed roots shall be spread, injured roots
A.
QUALITY Sod shall be rade, machine cut at a
been established, add the fertilizer to the
mixture (the tank shall be at least 1/3 filled
A.
GENERAL: The Contractor shall immediately replace
K.
RE—HYDROSEED/NG: The Contractor shall re—hydroseed
shall be prun+ed.
uniform thickness of 518" excluding tip growth and
with water at this time )•
an and all plant materials which for an reason die
Y P Y
all hydroseed areas eroded or non—germinating at the
!.
BACKFILL: Plant aft backfilling soil shall consist of
d thatch, weed free and shall be no less than eight
months nor more than sixteen months ai
3. Open the engine throttle to full speed when the
or are damaged P
ed white under his care. Replacements
shall be made with plants of like kind and size in the
end of each 30 days of maintenance.
1 part nitrogen stabilized sawdust — 2 parts topsoil.
Materials shall be thoroughly mixed before
tank is 1/2 filled with water. Add all organic
some manner as specified for the original planting.
L.
IRRIGATION: All irrigation must be operating properly
replacement. In addition to backfill commercial
B.
TIMING: Installation shall take place within 24 hours
amendments, fiber, seedmix and chemicals by the
and adjusted properly for efficient coverage and
fertilizer 20-10-5 Agriform 21 gram tablets shatl be
after harvesting.
time the tank is 2/3 to 3/4 full.
XVI.
CLEAN—UP
minimum overspray at the end of the maintenance
added to plant pits at the following rates:
C.
REFERENCE: Refer to Paragraphs V, Vt. VII. for finish
4. Start spraying immediately when the tank is full
A.
GENERAL: After all installation operations have been
period.
# one tab/et per one gallon container
grading, weed control, and soil preparation.
and the slurry is mixed.
Y
completed remove all trash, excess soil, empty plant
P PYP
M.
FINAL ACCEPTANCE: Wl1J be given at the end of the
* two tablets per five gallon container
* f
three tablets per 15 gallon container
D.
PREPARATION: Sod area prior to planting shall be
s
containers and rubbish from the property. All scars,
ruts or other marks in the area caused by this work
maintenance period for all planted areas once
h roseed germination and plant establishment has been
Yd 9
0 0
* four tablets per 20 and 24 box
rolled lightly and watered to a depth of 6 the day
F.
APPLICATION:
shall be repaired and the round left in a neat and
P 9
obtained and there ore no barren areas larger than 3 "
* s
five tablets per 30 box
prior to planting. If any air pockets are found, the
order) condition throughout the site. Contractor
Y 9
x 3 . All plants must be in a healthy, growing
* s
six tablets per 36 box
area shall be regraded as necessary. Lightly water
1. Apply the hydromulching in the form of a slurry
PP Y Yd 9 Y
shall ick u all trash resulting from this work no
P P 9
condition as approved by the Landscape Architect and
* seven tablets per 42 box
the area to be planted just prior to planting.
consisting of organic soil amendments,
9 9
less than each Friday before leaving the site, once a
Y 9
Owner.
* eight tablets per 600 box
commercial fertilizer, and other chemicals
week and/'or the last working day each week. All trash
* nine tablet: per 720 box
called for. When hydraulically sprayed onto the
shall be removed completely from the site.
N.
CONDITION OF SITE: During the maintenance period,
* ten tablets per 84' box
soil, the mulch shall form a blotter like
keep the project neat and free from debris at alt
* ground cover plants planted from flats or liners in
material. Direct the spray operation so that
B.
TOP SOIL: Excess topsoil shall be removed from the
times. Obtain the Owner's approval for onsite storage
2:1 or steeper slopes shall receive one 5 gram tablet
the slurry spray will also penetrate the soil
site.
of equipment or maintenance materials.
per plant
surface as to drill and mix the slurry
components into the soil, thus ensuring maximum
C.
NEATNESS: Leave the sidewalks and streets In a neat
XX.
FINAL CONSTRUCTION INSPECTION AND FINAL
impregnation and coverage. The impregnation and
and clean condition at the end of the day.
MAINTENANCE INSPECTION:
mixing of components will help in retaining
moisture while stabilizing soil surface from
D.
REMOVAL OF TAGS. Remove all tags, labels, nursery
superficial erosion.
stakes and ties from all plants unless otherwise
directed, only at the end of all installations.
XWI.
PROTECTION.
A.
GENERAL: At all times during construction, adequate
protection shall be provided for all planted areas
against damage of any kind, until final acceptance by
the Landscape Architect.