Loading...
HomeMy WebLinkAbout3109-1]IF rrftACrr No 15863 1170NF"rANA CAL1117ORN A CITY REOUIRED NOTES 1. IT 15 THE LAND50APE GONTRAGTOR'5 RESPONS I £31 L I TY TO CONTACT THE ENG I NEERi NC D I V 151 ON'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO LANDSCAPE CONSTRUCTION PLANS DESIRED INSPECTION OF AN ITEM (dlOa) =550-664a 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT, THE FOLLOWING INSPECTIONS ARE REQUIRED: SHEET INDEX PRE CONSTRUCTION MEETING iNSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO 1 TITLE SHEET 8 PLANTING PLAN! LEGEND AND �3AGKF I Ll_) . MAINLINE PRESSURE TEST a 150 P51 FOR A THREE (3) HOUR R NOTES ! CONTINUOUS PERIOD. 2 IRR) GAT I c�N COVERAGE TEST I NGLUD l NSG INITIAL AND FINAL CONSTRUCTION PLAN 9 CONSTRUCTION DETAILS FINISH GF:ADE PRIOR TO PLANTING 3 CONSTRUCTION PLAN 10 LANDSCAPE DETAILS PLANT MATERA I L PRIOR TO PLANTING AND 501E PREPARATION - 4 WALL PLAN 11 DETAILS CALCULATIONS+ SCHEDULE PLANT I N6, I NGLUD I NC STREET TREES. t:ONTAGT THE PARKS PLANNING ! AND LANDSCAPE DEVELOPMENT SECTION, ENG INEEiRING DIVISION, FOR SPEC'PlE5 AND FiNAL LOCATIONS. 5 iRRIGATION PLAN 12 SPECIFICATIONS COMPL I ANCE WITH APPROVED PLANS 6 IRRIGATION FLAN LEGEND AND NOTES 13 SPECIFICATIONS FINAL INE►PECTIONS ! 3. THE OWNERS REPRESENTATIVE AND LANOSGAPE CONTRACTOR SHALL SE 7_ PLANTING PLAN PRESENT A ,T EACH INSPECTION. GENERAL NOTES VICINITY. .. SAP 1. CONTRACT DOCUMENTS: Shall consist of specifications and its general conditions and the i1. SUBSTITUTIONS: All materials shall be specified unless the contractor can establish the fact that drawings. The intent of these documents is to include all labor, materials, and services necessary they are unavailable, and substitutions are approved in writing by the Landscape Architect. for the proper execution of the work. The documents are to be considered as one, and whatever is called for by any part shall be as binding as if called for by all parts. 12. CORRECTION OF WORK: The contractor shall be re–execute any work that fails to conform to the requirements of the contract and shall remedy defects due to faulty materials or workmanship LOCATIONMAP SUMMIT AVENUE 2. VERIFICATION: The contractor shall verify measurements on the drawings before beginning upon written notice from the project manager for a period of ninety (90) days from date of SUMMIT AVENUE work. In case of error or discrepancy in the drawings or specifications or in work of others completion of the contract. The irrigation system shall carry a one year guarantee. The 0 Z affecting his work, he shall notify the owners representative immediately. The contractor shall paragraph applies to the work of subcontractors as well as employees of the contractor. 4 Z be held responsible for any damaoe or loss due to his failure to observe these instructions. Q 13. LANDSCAPE COORDINATORS STATUS: The landscape coordinator acts as the authorized W WAL=NUT AV NV ~ 3. LICENSE: All work shall be performed by a C-27 California Licensed Landscape Contractor. representative of the owner in con' with the proiect manaaer. and has the authority to ,� CURTiS AVENUE V accept of reject materials or workmanship and to make minor changes in work not involving extra - 4. INSURANCE: The Contractor shall carry all Workman's Compensation, Public Liability and cost. He will also interpret the meaning of the contract documents and may stop the work if � Property Damage insurance as required by all applicable codes, regulations athe owner. necessary to insure its proper execution. PROPOSED ROUTE 30 FREEWAYnd HIGHLAND AVENUE l 5. LANDSCAPE ARCHITECT'S LIABILITY: The owner and contractors, recognizing the inherent 14. CLARIFICATION OF DRAWINGS BEFORE BIDDING: After reviewing the drawings thoroughly it risks connected with construction are to limit a " ' — — CER ITos STREET — — , agree i# ny and all liability, claim for damages, cost of is the contractors responsibility to clarify with the Landscape Architect or owners representative, � I defense, or expenses to be levied against the Landscape Architect on account of any design any questions the contractor may have regarding the method of construction, quantities, or u.i I :3 defect error,omission, or professional negligence to a sum not to exceed $50,000, or the TIMAICTMAAEET SCHOOL PARK WALNUT STREET Z Pquality of materials indicated or called out, If the contractor cannot contact the Landscape ( amount of the Landscape Architect's fee, whichever is lesser. Architect or owner's representative, the contractor must qualify his bid or accept the �.. I interpretation of the Landscape Architect or owner's representative on the questionable areas as 9 ACRE SITE I I 6. CONSTRUCTION SAFETY: The design, adequacy and safety of erection, excavation, bracing, they develop during construction, shoring, temporary supports, etc., is the sole responsibility of the Contractor, and has not been BASELINE ROAD considered by the Landscape Architect or his consultants. The contractor is responsible for the 15. SAMPLES: The Landscape Architect reserves the right to take and analyze samples of materials stability of any structures and excavations and shall provide the necessary bracing to provide for conformity to specifications at any time. The contractor shall furnish samples upon request J COURT I � tion progress. Observation visits to the site b the Landscape b the Landscape Architect. Rejected material shall be Immediatel removed from the site and W �' stability during the entire construe p g sc y p y p y Z Z a Architect or his consultants shall not include inspection of the above items. replaced at contractors expense. The cost of testing materials not meeting specifications shall be Y aI HERITAGE � � � Qlu paid for by the contractor. � 7. SURVEYS, PERMITS, REGULATIONS: The owner shall furnish an adequate survey of the m � � i _ property. The contractor shall obtain and pay for all permits and comply with all laws and 16. PRE –CONSTRUCTION CONFERENCE: Schedule a pre–construction meeting with the Landscape I I I I ordinances bearing on the operation or conduct of the work as drawn and specified. If the Architect at least 7 days before beginning work. The purpose of this conference is to review any FooTH,LL BOULEVARD I contractor observes that a vorianne exists therewith he shall promptly notify the owner'squestions the contractor may have regarding the work administrative procedures during — — H0_UQ 7 representative in writing, and any necessary changes shall be adjusted as provided in the contract constructions and project work schedule. for changes in the work. NTS 17. COMPLETION: Completion is defined as being when all conditions of the contract have been — — accomplished. Specifically when all items are installed, the areas cleaned and the maintenance 8. PROTECTION OF WORK, PROPERTY AND PERSON: The contractor shall adequately protect theperiod satisfactorily completed, and then all special tools and equipment, instructions, written work adjacent property and the public, and shall be responsible for any damage or injury due to guarantees, as –built plans, lien releases and any items required by the contract documents have _ his act. been properly executed and delivered to the owner. The Landscape Architect shall have full NTS authority to accept or reject the contract items and will promptly notify the owner of completion. 9. CHANGES IN THE WORK: The owner may order changes in the work. The contract sum being APPROVALS adjusted accordingly. All such orders and adjustments plus claims by the contractor for extras 18. GUARANTEE: In addition to specified guarantees provided for in the separate sections of the must be made before executing the work involved. specifications, the contractor shall guarantee in writing all workmanship and materials to be free from defect for a period of one year from the date of acceptance of the work by the owner 10. PROVISIONS FOR EXTRAS: No new work of any kind shall be considered an extra unless a without additional cost to the owner. separate estimate is given for said work before it is commenced and until :>ame is approved by the owner, and then not unless the owner first so ordered in writing and the particular extra work is specified in writing and the co:>t agreed upon between the owner and the! contractor. Except FZ E VI S O N S ENGINEER CiTY OWNER for extra work ordered by the owner according to unit prices which have been bid, any extra N0. APPROVAL DATE APPROVAL DATE BENCHMARK \,NWSCAp� CONSULTANT J. work performed, not authorized as provided above, will not and cannot be paid for by the owner. ��� �,S SFS, '9��, �, FONTANA C1.) GENERATIONS - � G� y SEG URA/DEUTSCHMA1V DRAWN BY. TITLE SHEET Ste' N°• GRAND PACIFIC COMMUNITIES LA 3 ASSOCIATES P. DIAZ AS SHOWN O DESIGNED BY: TRACT N � 63 � DATE: 100 N. BARRANCA AVE., SUITE 950 Exp. _ �LANDSCAPE ARCHITECTURE URBAN DESIGN LAND PLANNING T. SEGURA MAR 12, 2002 WEST COV1NA, CA 97791 `s�qT �� 565 W. LAMBERT RD. SUITE F BREA, CA 92821 714/529-1291 CHECKED BY: . 7NF �. OP�APPROVED-, 5115 DWG. No. 1 T. SEGURA pnr aaN� �, / �� 13