STREET IMPROVEMENT NOTES
i. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA
STANDARD PLANS THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR
PUBLIC WORKS CONSTRUCTION ('GREEN BOOK'). ALL REFERENCE SPECIFICATIONS
AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT
CANNOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE
'GREEN BOOK', THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT
TO THE ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA
COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO START
OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO
WORKING DAYS PRIOR TO START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN
THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICES, METHODS AND
PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS,
LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC
ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN
BARRICADES, DELINEATORSOR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK
FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION
OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH
SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS
PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE
STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SAHLL ALSO BE
GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT-OF-WAY
WITHOUT OBTAINING A SEPERATE PERMIT FOR THAT PURPOSE.
i0. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE
INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY
EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE
THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT
1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
ii. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITIEY COMPANIES
INCLUDING, BUT NOT LIMITED TO , GAS, TELEPHONE, ELECTRIC, CABLE
TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED
WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY
COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND
THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES
WITHOUT APPROP I ATE AGENCY AUTHORIZATION. THE CONTRACTOR SHALL COORDINATE EXISTING GROUND
WITH THE APPROPIATE WATER COMPANY FOR VALVE OPERATION AND WATER
REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF THE CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE
NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE
THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN LINES AND GRADES. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCH MARKS
AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES
OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY
MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED
CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT.WILL BE
DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO
THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE
MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES
AT ALL TIMES. A MINIMUM TWELVE FOOT LANE SHALL BE MAINTAINED AT ALL TIMES
IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUBSTAINED WIND VELOCIES
EXCEED 25 MILES PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATION MATERIAL, MUD, SILT OR DEBRIS
TO BE DEPOSITED UNTIL PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE
RIGHT-OF-WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY
INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE
TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE REWORKING OF THAT PORTION
OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM
UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY
ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR
LEAVING IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED
AT THE TIME OF CONSTRUCTION AND SHALL CONFORM THO THE CITY OF FONTANA
DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR, AND FINISH
TO MATCH EXISTING CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN 'S' IN THE FACE OF THE CURB AT THE
LOCATION OF THE SEWER LATERAL.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE
BEEN PLACED, INSPECTED, AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED, AND APPROVED PRIOR
TO PAVING OF STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR
TO PLACEMENT.
31. PAVEMENT STRUCTURUAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION
AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN
AFTER COMPLETION OF ROUGH"GRADING.
32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIALS FOR
STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL
REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON
COMPLETION OF ROUGH GRADING.
33. ALL MANHOLES, CLEANOUT FRAMES, COVERS, AND VALVE BOXES SHALL BE RAISED
TO FINISH GRADE BY THE PAVING CONTRCTOR UPON COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL RESTORE ALL
SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES
TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35. THE CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING SPRINKLERS
AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATIFACTION OF
THE CITY ENGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER
OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
LOT 5
PAD
�1
LOT 6
2'
4U"
201
do
20" 2 0'
40-4
0.51 0. 1 I,
DPIVE
"All
10, 793 SF
--------- - - ==== Z' = = = �=. :�l �= -
TEMP. A. C. PAVEMENT, T=2" ( DRA IN)
460 SF
0. 5' *q
LEVEL L INE SLOPE @ -2%c?"1'
..- -w.- _----.------------- O R I G. GROUND
6" CURB FACE PER CITY
STANDARD N0. 1003
TYPICAL
DESCRIPTION
SECTION
1
PPIVATE
13,020 SF
DPIVE
"All
T. I. - 5. 5
SCALE: 1"=10'
SAN BERNARDINO COUNTY
S0. CAL. ED I SON
VARIES 6' VARIES
4' TO 23. 6' (n• 1-,. 5. 2' TO 16. 2'
�1
P. C. C. DRA I N PER DETA I L
STORM DRAIN PLANS
CITY OF FONTANA
P.M. NO. 14890
25'
I
3' 5' 12.5' 12.5' 2'
I
D. 5' 0. 5'
1% 2% 0. 2z LEVEL L 1 NE PAD
6" CURB & GUTTER
PER CITY STD. N0. 1003
PER WALL PLANS
PRIVATE DRIVE 'I CII
TYPICAL SECTION
PR 1 VA TE DR 1 VE " cil
STA 7+83. 84 TO 8+38 6 9+02 TO 10+00 I
w�
SCALE: 1"=10' al
E%f6 ,FO Erie GRD
OUTLET SECTION
STREET IMPROVEMENT QUANTITIES
ITEM NO.
DESCRIPTION
QUANTITY
1
6" CLASS 2 AGGREGATE BASE COURSE
13,020 SF
2
A. C. PAVEMENT, T=4"; 2 EA@2 "
10, 793 SF
3
TEMP. A. C. PAVEMENT, T=2" ( DRA IN)
460 SF
4
CURB & GUTTER: 6" FACE
812 LF
5
DRWY PER STD NO. 102-13, W=15'
1 EA
6
LOCAL DEPRESSION PER APWA NO. 313-1/E
2 EA
7
STD. BARRICADE PER STD. NO. 118
2 EA
8
ADJUST FRAME & LID TO GRADE
4 EA
z
C I
O
W I
J
W
z I
w
U
I
I
DA YLITE WITH IXTI
NG GROUND
95
i
ENGINEER'S NOTES TO CONTRACTOR
i. CONTRACTOR AGREES THAT IN ACCORDANCE WITH THE GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR SHALL BE REQUIRED TO
ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING
THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY. THAT THIS REQUIREMENT SHALL BE MADE TO APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONTRACTOR
FURTHER AGREES TO DEFEND, INDEMNIFY, AND HOLD THE OWNER AND DESIGN
PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN
THE CONNECTION WITH THE PERFORMANACE OF WORK ON THIS PROJECT. EXCEPTING
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR DESIGN
PROFESSION AS PROVIDED BY THE CALIFORNIA COUNCIL OF CIVIL ENGINEERS AND
LAND SURVEYORS.
2. PRIOR TO ISSUANACE OF BUILDING PERMITS, THE OWNER/DEVELOPER IS REQUIRED
TO SUBMIT TO THE STATE WATER RESOURCES CONTROL BOARD, A 'NOTICE OF
INTENT' (NOI), TO COMPLY WITH THE TERMS OF THE GENERAL CONSTRUCTION
ACTIVITY STORM PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH CONSTRUCTION
THE DISTURBANCE OF AT LEAST FIVE ACRES OF TOTAL LAND AREA. CONSTRUCTION
ACTIVIES ON SITES OF LESS THAN FIVE ACRES REQUIRES A PERMIT IF THE
CONSTRUCTION IS A PART OF A LARGER COMMON PLAN DEVELOPMENT. OWNER/DEVELOPER
IS REQUIRED TO SUBMIT TO THE CITY OF FONTANA A COPY OF THE STATE'S
APPROVED GENERAL PERMIT.
3. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING IN-PLACE EXISTING IMPROVEMENTS
AND UNDERGROUND UTILITIES. UNDERGROUND UTILITIES LOCATED ON-SITE INCLUDE
BUT ARE NOT LIMITED TO; WEST SAN BERNARDINO COUNTY WATER DISTRICT WATER
LINES AND FACILITIES, PAC BELL TELEPHONE, SOUTHERN CALIFORNIA EDISON POWER,
THE GAS COMPANY GAS LINES AND THE CITY OF FONTANA SEWER MAINS AND LATERALS.
CALL UNDERGROUND ALERT 48 HOURS BEFORE YOU DIG AT 1-800-422-4133.
4. THE CONTRACTOR IS MADE AWARE THAT THERE EXISTS ON SITE A PAC BELL
REGIONAL FIBER OPTICS LINE AND FACILITY.
5. THE CONTRACTOR SHALL VERIFY ALL QUANTITIES AND REPORT ANY DISCREPANCIES
TO BOTH THE ENGINEER AND THE OWNER/DEVELOPER PRIOR TO COMMENCING WORK.
6. OWNER/DEVELOPER REPRESENTATIVE:
LYTLE DEVELOPMENT CO.
JAN C. DABNEY RCE
PROJECT MANAGER
714-283-2400
LOT 7 �-
DAYU TE WITH EXISTING GROUND
DETA I L 1
SCALE: 1"=10'
LOT 5
-0. 5%
GLEN HELEN
REGIONAL PARK
NORTH
F
90
�9
PROJECT c9e,
4
w
CITY OF FONTANA CITY OF RIALT
V I C I TY MAP
ASSOCIATED ENGINEERS
3311 E. SHELBY STREET
ONTARIO, CA 91764
909-980-1982
BEGIN STREET IMPROVEMENTS
STA 8+36.87
PRIVATE DRIVE "A"
0 -0.5%
SOILS CONSULTANT'.
C. H. J. INCORPORATED
1355 E. COOLEY DRIVE
COLTON, CA 92324
909-824-710
BASIS OF BEARING
NORTHWTLY BOUNDARY OF TRACT N0. 14890
REPORTED AS:
N 26° 24' 41" E
BENCHMARK'.
SPSN # 00487, R. R. SPIKE IN P. P.
# 138839E AT THE INTERSECTION OF SIERRA
AVE. & RIVERSIDE AVE., 30 FT. EAST OF
SIERRA, 116 FT. NORTH OF RIVERSIDE ON
LINE & PARALLEL TO POWER LINE; 3 MILES
NORTH OF HIGHLAND AVE. ALONG SIERRA AVE.
ELEV. = 1969.3730
CONSTRUCTION NOTES:
Q CONSTRUCT CURB & GUTTER, 6" FACE
PER CITY STD. N0. 1003
Q CONSTRUCT 4" A. C. PAVEMENT
Q CONSTRUCT DRIVEWAY @ STA 8+69.90 LT
PER CITY STD. N0. 102-13, W=15'
Q CONSTRUCT LOCAL DEPRESSION
@ STA 8+45.88 LEFT 6 RIGHT
PER APWA STD. 313-1, CASE D
CURB FACE 6" H=4", DETAIL SHT 3
O CONSTRUCT STANDARD BARRICADE PER
CITY STD. N0. 118, L=20'
Q CONSTRUCT STANDARD BARRICADE PER
CITY STD. N0. 118, L=36'
_DW6#31I4