HomeMy WebLinkAbout2758-3r_ SCALE IN FEET ^f% �� CITRUS AVENUE
ON THE EAST SIL7€ UF GiTHl1U A1tE . USED AS THE BASIS OF BEARINGS FOR
PLM PREPARED FCMTHIS PLAN.
ELEVATION: 1467.59
KAUFMAN & BROAD
ATT* MR. GLEN CROSBY
801 CORPORATE CENTER DRIVE
SUITE 201
POMONA, CA. 91768-2641
PHONE: (909) 802-1100
FAX: (909) 802-1111
W16W C? Rt7Z4W* rO BOJ. Ao OAAS -
REVISIONS
v . I ,oU,4)NW4N 90 • X&M
✓AL I DATE I APPROVAL DATE
PREPARED IN THE OFFICE OF
MADOLE AND ASSOCIATES, INC.
OF THE INLAND EMPIRE
10601 CHURCH STREET STE. 107
RANCHO CUCAMONGA, CA 91730
PHONE (909) 948-1311
TGK
I No. 14814
Exp: 3-31-01
vr� C"
OF C AL
MADOLE R.C.E.14814 DATE
CONSTRUCTION NOTES=
Q CONSTRUCT 6 1/4' AG PAVEMENT CMIN.) OVER 12' COMPACTED NATIVE
MATERIAL. CSEE GENERAL NOTE5 27 + 283
OZ SAW—GUT + REMOVE EXISTING AG PAVEMENT.
O3 INSTALL 24' GMP Pff WITH FLARED END 5EGTION5 o INLET
+ OUTLET. GAGE 14.
O4 INSTALL 2'X6' REDWOOD HEADER.
6%OFI MAI.
ITY OF FONTANA, CALIFORNIA
� h1�12R� L�C+�i Rs.Q��l e►Y
DRAWN BY: SCALE:
DESIGNED: AS SHOWN
STREET IMPROVEMENT PLAN
CHECKED: CATAWBA AVE. TO CITRUS AVE. DATE: 19 e
JOB NO.DWG. NO. SHEET NO.
826-1153 APPROVED f' 27513 I 5o
CITY ENGINEER R.C.E. 25126
*PAO* CARTER AVENLIE SHEET 3 - 21 iO. 2311 PF: 1154 4135 13 -Oct -99 03: 57 PM / 826-1154-1
GWG . DATE: 1A: 13
DELTA/BEARING
RADIUS
LEN./DIST.
TANGENT
0
19021'18"
1130.00
381.72
192.70
0
20059'23"
960.00
351.69
177.84
0
6050'24"
336.58
40.18
20.11
O
N 810 48' 15"W
40.44
0
8022'55"
274.43
40.15
20.11
n
90000'00' 1
50.00
1 78.54
50.00
ON THE EAST SIL7€ UF GiTHl1U A1tE . USED AS THE BASIS OF BEARINGS FOR
PLM PREPARED FCMTHIS PLAN.
ELEVATION: 1467.59
KAUFMAN & BROAD
ATT* MR. GLEN CROSBY
801 CORPORATE CENTER DRIVE
SUITE 201
POMONA, CA. 91768-2641
PHONE: (909) 802-1100
FAX: (909) 802-1111
W16W C? Rt7Z4W* rO BOJ. Ao OAAS -
REVISIONS
v . I ,oU,4)NW4N 90 • X&M
✓AL I DATE I APPROVAL DATE
PREPARED IN THE OFFICE OF
MADOLE AND ASSOCIATES, INC.
OF THE INLAND EMPIRE
10601 CHURCH STREET STE. 107
RANCHO CUCAMONGA, CA 91730
PHONE (909) 948-1311
TGK
I No. 14814
Exp: 3-31-01
vr� C"
OF C AL
MADOLE R.C.E.14814 DATE
CONSTRUCTION NOTES=
Q CONSTRUCT 6 1/4' AG PAVEMENT CMIN.) OVER 12' COMPACTED NATIVE
MATERIAL. CSEE GENERAL NOTE5 27 + 283
OZ SAW—GUT + REMOVE EXISTING AG PAVEMENT.
O3 INSTALL 24' GMP Pff WITH FLARED END 5EGTION5 o INLET
+ OUTLET. GAGE 14.
O4 INSTALL 2'X6' REDWOOD HEADER.
6%OFI MAI.
ITY OF FONTANA, CALIFORNIA
� h1�12R� L�C+�i Rs.Q��l e►Y
DRAWN BY: SCALE:
DESIGNED: AS SHOWN
STREET IMPROVEMENT PLAN
CHECKED: CATAWBA AVE. TO CITRUS AVE. DATE: 19 e
JOB NO.DWG. NO. SHEET NO.
826-1153 APPROVED f' 27513 I 5o
CITY ENGINEER R.C.E. 25126
*PAO* CARTER AVENLIE SHEET 3 - 21 iO. 2311 PF: 1154 4135 13 -Oct -99 03: 57 PM / 826-1154-1
GWG . DATE: 1A: 13