HomeMy WebLinkAbout2737-c-1GRADING PLAN GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE NTH THE GRADING GUIDELINES OF
THE CITY OF FONTANA AND ANY SPECIAL REQUIREMENTS OF THE PERMIT.
2. NO GRADING SHALL BE COMMENCED WITHOUT FIRST NOTIFYING THE CITY ENGINEER. A PRE -
GRADING MEETING AT THE SITE IS REQUIRED BEFORE START OF GRADING NTH THE FOLLOY"
PEOPLE PRESENT: OWNER, GRADING CONTRACTOR, DESIGN CIWL EN W4M. SOILS
ENGINEER/GEOLOGIST AND CITY INSPECTOR.
3. THE PERMITTEE OR HIS AGENT SHALL NOTIFY THE CITY ENGINEER WHEN
THE GRADING OPERATION IS READY FOR EACH OF THE FOLLOWING INSPECTIONS:
A. INITIAL INSPECTION. WHEN THE PERMITTEE IS READY TO BEGIN WORK, BUT NOT
LESS THAN TWO DAYS BEFORE ANY GRADING OR CLEARING IS STARTED.
B: TOE INSPECTION. AFTER THE NATURAL GROUND OR BEDROCK IS EXPOSED
AND PREPARED TO RECEIVE FILL, BUT BEFORE FILL IS PLACED.
C: EXCAVATION INSPECTION. AFTER THE EXCAVATION OPERATION IS STARTED,
BUT BEFORE THE VERTICAL DEPTH OF THE EXCAVATION EXCEEDS TEN FEET.
D. FILE INSPECTION. AFTER THE FILL PLACEMENT IS STARTED, BUT BEFORE THE V07W.41.
HEIGHT OF THE FILL EXCEEDS TEN FEET.
E. DRAINAGE DEVICE INSPECTION. AFTER FORMING OF TERRACE DRAINS, DOWN DRAINS OR
PLACEMENT OF SUBDRAIN PIPE, BUT BEFORE PLACEMENT OF FILTER MATERIAL OR CONCHM
F. ROUGH GRADING INSPECTION. WHEN ALL ROUGH GRADING OPERATIONS ARE COMPLETE.
G. FINAL INSPECTION. WHEN ALL WORK. INCLUDING INSTALLATION OF ALL DRAINAGE DEVICES
AND OTHER PROTECTIVE DEVICES, HAS BEEN COMPLETED AND THE AS -GRADED PLAN. PAD
CERTIFICATIONS AND REQUIRED REPORTS HAVE BEEN SUBMITTED.
4. CUT SLOPES SHALL BE NO STEEPER THAN 2 HORIZONTAL. TO 1 VERTICAL
5. FILL SLOPES SHALL BE NO STEEPER THAN 2 HORIZONTAL TO 1 VERTICAL.
6. FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 909. RELATIVE DENSITY. MAXMlii
DENSITY WILL BE DETERMINED BY ASTM 1557-70.
7. AREAS TO RECEIVE FILL SHALL BE PROPERLY PREPARED AND APPROVED BY THE CITY ENGINEER
AND SOILS ENGINEER PRIOR TO PLACING FILL
8. THE DESIGN CIVIL ENGINEER SHALL. PRIOR TO ROUGH GRADE APPROVAL. PROVIDE A MINIMUM Of
ONE BLUE TOP PER LOT, SET AT THE HIGHEST POINT IN THE FINISH DRAINAGE SWALE.
THE ELEVATION OF THE FLOOR SHALL ALSO BE PROVIDED TO ENSURE PROPER CLEARANCE
AND FALL TO THE DRAINAGE SWALE. THESE ELEVATIONS SHALL BE NOTED ON THE BUILDING PLAN.
9. ALL TRENCH BACKFILLS SHALL BE TESTED AND CERTIFIED BY THE SITE SOILS ENGINEER PER PUBLIC
WORKS STANDARDS.
1R THE ENGINEERING GEOLOGIST SHALL PERFORM PERIODIC INSPECTIONS AND SUBLWT A COMPiM
REPORT AND MAP UPON COMPLETION OF ROUGH GRADING.
11. THE FINAL COMPACTION REPORT AND APPROVAL FROM THE SOILS ENG94EER SHALL CONTAIN THE
TYPE OF FIELD TESTING PERFORMED. EACH TEST SHALL BE IDENTIFIED NTH THE METHOD OF
OBTAINING THE IN-PLACE DENSITY, WHETHER SAND -CONE OR DRIVE RING AND SHALL BE SO NOTED
FOR EACH TEST. SUFFICIENT MAXIMUM DENSITY DETERMINATIONS SHALL BE PERFORMED TO
VERIFY THE ACCURACY OF THE MAXIMUM DENSITY CURVES USED BY THE FIELD TECHNiaAIMS.
12. THE SOILS ENGINEER AND ENGINEERING GEOLOGIST SHALL EXERCISE SUFFICIENT SUPERVISORY
CONTROL DURING GRADING TO INSURE COMPLIANCE VAIN THE PLANS, SPECIFICATIONS AND CODE
WITHIN THEIR PURVIEW.
13. THE DESIGN CIVIL ENGINEER SHALL EXERCISE SUFFICIENT CONTROL DURING GRADING TO INSURE
COMPLIANCE WITH THE PLANS, SPECIFICATIONS AND CODE WATHIN FNS PURVIEW.
14. DUST SHALL BE CONTROLLED BY WATERING.
15. SANITARY FACILITIES SHALL BE MAINTAINED ON THE SITE.
16. THE LOCATION AND PROTECTION OF ALL UTILITIES IS THE RESPONSIBILITY OF THE PERMITTEE.
17. APPROVED PROTECTIVE MEASURES AND TEMPORARY DRAINAGE PROVISIONS MUST BE USED 70
PROTECT ADJACENT PROPERTIES DURING THE GRADING PROJECT.
18. SEPARATE PERMITS SHALL BE REQUIRED FOR ANY IMPROVEMENT IN THE PUBLIC RMT -OF -WAY.
DISABLED ACCESS NOTES:
1. ALL SLOPES SHOWN ON THIS WERE DESIGNED AT OR BELOW MAXWJMS
ALLOWED BY THE AMERICANS WITH DISABILITY ACT ACCESS GUIDE (A.D.A.A.G.) IN
ORDER TO ALLOW FOR CONSTRUCTION TOLERANCES. IT IS CONTRACTORS'
RESPONSIBILITY TO FAMILIARIZE THEMSELVES WITH A.D.A.A.G. AND IN THE EVENT
THAT A DESIGN QUESTION SHOULD ARISE, OR A FIELD CONDITION PRESENT ITSELF
THAT IS DIFFERENT THAN SHOWN ON THESE PLANS, WORK SHALL CEASE AND THE
ENGINEER NOTIFIED SO THAT AN ACCEPTABLE SOLUTION CAN BE DETERMINED.
Z. THE CONTRACTOR IS ADVISED TO CAREFULLY CHECK ALL PHASES OF WORK
RELATING TO A.D.A.A.G. ACCESS FOR THIS PROJECT. SINCE THE CODE DOES NOT
ALLOW FOR CONSTRUCTION TOLERANCE, ANY CONSTRUCTION THAT EXCEEDS
MAXIMUM OR MINIMUM DIMENSIONS AND SLOPES AS CALLED OUT BY A.D.A.A.G.
ARE SUBJECT TO REJECTION BY THE CITY AND MAY BE REQUIRED TO BE REMOVED
AND REPLACED.
LEGAL DESCRIPTION:
PARCEL 1, CITY OF FONTANA LOT UNE ADJUSTMENT NO. 98-07,
RECORDS OF SAN BERNARDI O COUNTY. CALIFORNIA.
PUBLIC unLrnEs:
SEWER
CITY OF FONTANA
FELIPE MOUNOS
110
O
O �
8353 SIERRA AVENUE
(909) 350-6641
Z
FONTANA, CA 92335
I
Q
WATER
FONTANA WATER COMPANY
NORMA MANNING
8440 NUEVO AVENUE
(909) 822-2201
( O
w M
FONTANA, CA 92335
O I�
POWER
SOUTHERN CALIFORNIA EDISON
PLANNING SUPERVISOR
O I
7951 REDWOOD AVENUE
(909) 357-6191
FONTANA, CA 92336
�-
o
GAS
THE GAS COMPANY
WAYNE FORD
�
1981 W. LUGONIA AVENUE
(909) 335-7769
0
La
REDLANDS, CA 92374
� w
z
PHONE
PACIFIC BELL
SHARON HENSLEY
3073 ADAMS STREET
(909) 359-2520
r2
RIVERSIDE, CA 92504
FLOOD ZONE X - AREA OUTSIDE 500 -YEAR FLOOD PLAIN
Z
MAP NO. 06071C8652 3-18-96
BASIS OF BEARINGS:
THE BEARING OF N0011'13"E OF THE CENTERLINE
OF CITRUS AVENUE PER PARCEL MAP NO. 10592
P.M.B. 117-61/62 WAS TAKEN AS THE BASIS OF
BEARINGS FOR THIS SURVEY.
BENCH MARK:
CITY OF FONTANA BM NO. 383 ELEV = 1296.97
PK NAIL IN PP NO. 1329208E 100' WEST
INTERSECTION CITRUS & FOOTHILL
(ADD 1200 TO ELEV FOR DATUM)
SHEET INDEX:
ON-SITE IMPROVEMENTS
C-1 COVER SHEET
C-2 PRECISE GRADING PLAN
C-3 DETAIL SHEET
C-4 ON-SITE UTILITY PLAN
C-5 HORIZONTAL CONTROL PLAN
OFF-SITE IMPROVEMENTS
C-6 GENERAL NOTES FOR STREETS Et STORM DRAINS
C-7 FOOTHILL BLVD. STREET IMPROVEMENTS (CALTRANS)
C-8 STORM DRAIN &CITRUS AVE. BUS BAY PLAN
C-9 TRAFFIC SIGNAL &LIGHTING MODIFICATION PLAN
C-10 SIGNING &STRIPING PLAN
STORE # 014- 05372
16108 FOOTHILL BOULEVARD
FONTANA, CA
CITY ENGINEER CONDITIONS OF APPROVAL.-
MEMORANDUM
PPROVAL:MEMORANDUM
TO: CRAIG BROURTON, SENIOR PLANNER
FROM: RICARDO SANDOVAL. SENIOR CIVIL ENGINEER
RE: REVISED CONDITIONS OF APPROVAL
DR 98-22/LLA 98-07 (WALGREENS)
NORTHEAST CORNER OF CITRUS AND FOOTHILL
DATE: SEPTEMBER 17, 1998
THE REVISED RECOMMENDED CONDITIONS OF APPROVAL FOR THE SUBJECT PROJECT ARE AS FOLLOWS:
1. A CERTIFICATE OF COMPLIANCE FOR LOT UNE ADJUSTMENT SHALL BE REQUIRED TO REVISE THE LOT CONFIGURATIONS,
THE CERTIFICATE OF COMPLIANCE FOR LOT LINE ADJUSTMENT SHALL RECORD PRIOR TO THE ISSUANCE OF THE BUILDING
PERMIT.
2. APPLICANT SHALL DEDICATE THE ULTIMATE STREET RIGHT OF WAY DESIGNATION IN CONFORMANCE TO THE TYPICAL
STREET SECTIONS OF THE ABUTTING ROADWAYS CONSISTENT WITH THE NORTHGATE SPECIFIC PLAN PRIOR TO ISSUANCE OF
THE BUILDING PERMIT. THE SPECIFIC PUBLIC STREET DEDICATIONS AND REQUIRED IMPROVEMENT ARE AS FOLLOWS:
STREET NAME REQUIRED DEDICATION
FOOTHILL BOULEVARD 70 FEET OF HALF STREET RafT OF WAY (INCLUDES ADDITIONAL
RIGHT OF WAY AS NEEDED FOR FUTURE RIGHT TURN POCKET).
CITRUS AVENUE 44 FEET OF HALF STREET RIGHT OF WAY AND
ADDITIONAL RIGHT OF WAY AS NEEDED FOR BUSSAY TURN OUT.
CITRUS/FOOTHILL INTERSECTION CORNER CUT-OFF BASED ON CITY APPROVED INTERSECTION
STUDY TO ACCOMMODATE THE RELOCATION/MODIFICATION OF
THE ULTIMATE TRAFFIC SIGNAL
3. APPLICANT SHALL PREPARE AN INTERSECTION ALIGNMENT STUDY FOR CITRUS/FOOTHILL INTERSECTION TO THE
SATISFACTION OF THE CITY ENGINEER, PRIOR TO THE ISSUANCE OF THE BUILDING PERMIT. THE APPROVED ALIGNMENT
STUDY WILL ESTABLISH THE ULTIMATE AND INTERIM ALIGNMENT AND CURB LOCATIONS FOR BOTH STREETS. THE APPROVED
ALIGNMENT STUDY SHALL CONSIDER THE DESIGN REQUIREMENTS FOR THE TRAFFIC SIGNAL RELOCATION, STRIPING,
TRANSITIONS, JOINS, AND DRIVEWAY LOCATIONS. APPLICANT SHALL DESIGN, AND FULLY CONSTRUCT THE REQUIRED STREET
IMPROVEMENTS IN CONFORMANCE TO THE REQUIRED ALIGNMENT STUDY.
4. APPLICANT SHALL IMPROVE THE ULTIMATE STREET RIGHT OF WAY DESIGNATION IN CONFORMANCE TO THE INTERSECTKIIM
ALIGNMENT STUDY FOR CITRUS/FOOTHILL INTERSECTION AND AS REQUIRED BY THE CITY ENGINEER PRIOR TO OCCUPANCY.
ALL REQUIRED PUBLIC IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO: STREETS, DRAINAGE SYSTEMS, UTILITIES, TRAFFIC
SIGNALS, STREET LIGHTS, STRIPING, SIGNS AND MARKINGS (INCLUDING ANY REQUIRED TRAFFIC CONTROL AND/OR DETOUR
PLANS) SHALL CONFIRM TO CITY STANDARDS AND SPECIFICATIONS, AND AS APPROVED BY THE CITY ENGINEER AND/OR CITY
TRAFFIC ENGINEER, AS REQUIRED. STREET PAVEMENT DESIGN SHALL TAKE INTO ACCOUNT THE SUBGRADE SON. STRENGTH,
THE PROJECTED TRAFFIC LOADING, AND HAVE A DESIGN LIFE OF 20 YEARS.
5. CALTRANS PERMITS SHALL BE REQUIRED FOR CONSTRUCTION WITHIN FOOTHILL BOULEVARD.
6. THE PROJECTS DOWNSTREAM DRAINAGE IMPACTS TO FOOTHILL BOULEVARD AND CITRUS AVENUE SHALL BE REVIEWED
AND ANALYZED. THE OPERATION AND/OR MODIFICATIONS TO THE EXISTING STORM DRAIN SYSTEM WITHIN CITRUS AVENUE
SHALL BE REVIEWED. THE APPLICANT SHALL PREPARE A FINAL HYDROLOGY/HYDRAULIC STUDY WHICH WILL IDENTIFY ALL.
DRAINAGE IMPACTS AND MIGRATION MEASURES. ALL STORM DRAINAGE SYSTEM MODIFICATIONS AND MIGRATIONS SHALL
BE SUBJECT TO FINAL APPROVAL BY THE CITY ENGINEER AND ALL AFFECTED AGENCIES.
7. EXISTING OVERHEAD UTILITY LINES LOCATED WITHIN FOOTHILL BOULEVARD LESS THAN 35 KV SHALL BE UNDERGROUNDED
PURSUANT TO THE CITY'S UNDERGROUND ORDINANCE. PROVISIONS FOR FAIR SHARE FEE BY THE APPLICANT IN LIEU OF
UNDERGROUDING REQUIREMENTS MAY BE CONSIDERED FOR APPROVAL BY THE COMMUNITY DEVELOPMENT DIRECTOR
PURSUANT TO THE CITY'S UNDERGROUND ORDINANCE AND/OR AN IMPLEMENTATION SCHEDULE MAY BE INCLUDED IN A
DEVELOPER/CITY PAYMENT OF SUMS IN LIEU OF AGREEMENT.
8. APPLICANT SHALL HAVE ENGINEERED IMPROVEMENT PLANS PREPARED BY A PROFESSIONAL ENGINEER REGISTERED IN THE
STATE OF CALIFORNIA. ALL REQUIRED PUBLIC IMPROVEMENTS, INCLUDING BUT NOT LIMITED TO: STREETS, STORM DRAIN
SYSTEMS, UTILITIES, TRAFFIC SIGNALS, STREET LIGHTS, STRIPING, SIGNS AND MARKINGS (INCLUDING ANY REQUIRED TRAFFIC
CONTROL AND/OR DETOUR PLANS) SHALL CONFORM TO CITY STANDARDS AND SPECIFICATIONS, AND AS APPROVED BY THE
CITY ENGINEER AND/OR CITY TRAFFIC ENGINEER, AS REQUIRED. STREET PAVEMENT DESIGN SHALL TAKE INTO ACCOUNT THE
SUBGRADE SOIL STRENGTH, THE PROJECTED TRAFFIC LOADING AND HAVE A DESIGN LIFE OF 20 YEARS.
9. PRIOR TO CITY ISSUANCE OF THE BUILDING PERMIT, APPLICANT SHALL PROVIDE A FULLY EXECUTED LAND IMPROVEMENT
AGREEMENT WITH ACCOMPANYING SECURITY FOR ALL PROPOSED PUBLIC IMPROVEMENTS INCLUDING BUT NOT LIMITED TO:
STREETS, STORM DRAIN SYSTEMS, UTILITIES, TRAFFIC SIGNALS, STREET LIGHTS, STRIPING, SIGNS AND MARKINGS (INCLUDING
ANY REQUIRED TRAFFIC CONTROL AND/OR DETOURS).
10. THE PROJECT SHALL BE SERVED BY THE CITY PUBLIC SEWER SYSTEM. ALL SEWER FACILITIES SHALL BE CONSTRUCTED AS
APPROVED BY THE CITY ENGINEER.
11. APPLICANT SHALL PAY ALL APPLICABLE SERVICE AND IMPACT FEES PURSUANT TO THE CITY OF FONTANA MUNICIPAL
CODE. THE ESTIMATED FEES ARE AS FOLLOWS:
A. MASTER STORM DRAINAGE FEE SHALL NOT 13E REQUIRED. MASTER STORM DRAINAGE FEE WAS PAID PER A PRIOR CITY
APPROVAL
B. FLOOD CONTROL FEE IS ESTIMATED TO BE #10,968 (54,405 PER GROSS ACRE *2.49 GROSS ACRES). THE IMPACT FEE SHALL BE
PAID PRIOR TO CERTIFICATE OF OCCUPANCY.
C. SEWER CONNECTION FEE SHALL BE 5600 PER EQUIVALENT DWELLING UNIT (EDU). EDU'S SHALL BE CALCULATED BASED ON
THE PLUMBING FIXTURES BEING INSTALLED AND CONVERTED TO EDU USING THE APPROPRIATE USE FACTOR. THE IMPACT FEE
SHALL BE PAID PRIOR TO CERTIFICATE OF OCCUPANCY.
D. CHINO BASIN MUNICIPAL WATER DISTRICT SEWER EXPANSION FEES SHALL BE 53,350 PE EQUIVALENT DWELLING UNIT
(EDU). EDU'S SHALL BE CALCULATED BASED ON THE PLUMBING FIXTURES BEING INSTALLED AND CONVERTED TO EDU USING
THE APPROPRIATE USE FACTOR. THE NPACT FEE SHALL BE PAID PRIOR TO BURI)ING PERMIT.
BASELINE ROAD
,,-- SI TE
FOOTHILL BLVD.
ARROW RTE.
D
W
ol (N
11 1 1-10 SAN BERNARDINO FWYA
VIC�SCALETTO
NITYMAP t
PAVEMENT SECTION
PER SOILS
NOTE:.• MONX EXPAl WN JOW AT 20'-0' O.C. 10MMUM
WITH 1/2- SATURATED FELT DXPANSION JOINT RLLDR
I
ESTIMATED EARTHWORK QUANTITIES:
CUT = 1172 CY FILL = 1466 CY OVER -EX = 1040 CY
NOTE: QUANTITIES PROVIDED AS A COURTESY AND
CONVENIENCE TO THE OWNER AND ARE FOR BONDING
AND PLAN CHECKING PURPOSES ONLY.
IMPORTANT NOTICE:
SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES A DIG ALERT
IDENTIFICATION NUMBER BE ISSUED BEFORE A "PERMIT TO EXCAVATE" WILL
BE VAUD. FOR YOUR DIG ALERT I.D. NUMBER CALL UNDERGROUND SERVICE
ALERT TOLL FREE 1-800-422-4133 TWO WORKING DAYS BEFORE YOU DiG.
PRIVATE ENGINEER'S NOTICE TO CONTRACTORS:
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE
PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE
THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS
REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOAW ARID ANY
OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS.
ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON OR RELATED TO THESE
PLANS SHALL CONDUCT THEIR OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE PLACE
TO WORK AND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND SUBCONTRACTORS SHALL
COMPLY WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS" OF THE U.S. DEPARTMENT
OF LABOR AND THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS' "CONSTRUCTION
SAFETY ORDERS."
THE CIVIL ENGINEER SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTORS' AND
SUBCONTRACTORS' COMPLIANCE WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS"
OF THE U.S. DEPARTMENT OF LABOR OR WITH THE STATE OF CALIFORNIA DEPARTMENT OF
INDUSTRIAL RELATIONS' "CONSTRUC111QN SAFETY ORDERS.'
CONTRACTOR FURTHER AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY
FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT,
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR
SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY
AND ALL UABIUTY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON
THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGUGENCE OF THE OWNER
OR THE ENGINEER.
UNAUTHORIZED CHANGES AND USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,
UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST
BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
THE CONTRACTOR SHALL BE RESPONSIBLE TO REPORT DISCREPANCIES N PLANS AND/OR FEW
CONDITIONS IMMEDIATELY TO THE DESIGN ENGINEER FOR RESOLUTION PRIOR TO CONSTRUCTION
AND SHALL BE RESPONSIBLE FOR DISCREPANCIES NOT SO REPORTED AND RESOLVED.
CONCRETE CURB &GUTTER (REVERSE
NOTE: PROVIDE DXPANSION JOINT AT 20'-0' O.C. MAXIMUM
WWW 1/2' S+MTJ VjRD FELT DW MSM JOINT RUBL
%,al: TOLL FREE
1-800-422-4133
TWO WORKING DAYS BEFORE YOU DIG
4 CONCRETE CURB do GUTTER
NO.I DATE I DESCRIPTION OF REVISION
24" N.T.S.
6w -l- 12" N.T.S. - - 6" -
"1' 7 I � 3:12 BATTER
VPI
1111=1111 0 ,, R s' ,�4
o ,a -� III -1111
I'll O � CONTINUOUS 4 flEBW
VIII-IIII-IIII- III=IIII=IIII-III-_ TOP k BOTTOM
IA
CONCRETE CHANNEL
2
NOTE: PROVIDE D(P1I GW JOINT AT 20'-0' O.C. MAX MW
WITH 1/2- SATURATED FELT EXPIWSION JOKr FLLER.
7
CONCRETE CURB
Ah-�ul�T Gas -o0
SUBMITTED BY:
SOILS ENGfNEER:
ANTHONY -TAYLOR CONSULTANTS JUL 0 7
2240 VINEYARD AVENUE
ESCONDIDO, CA 92029 DATE:
760-738-8800 APPROVED BY:
PROJECT NO. 98-1091
DATED: SEPTEMBER 10, 1998 W0104A sssc
T•AA W%fx
DATE: Jo
�0 QROFESSpN,�
eye
Fti y
No. 37438
Exp. 6/30/00
s9 civic ��a
of c\i°
CITY OF FONTANA
Q
LA -
to Lo
L U-)
Qa
I\
Q
c
110
O
O �
Q
V) o o
Z
0 U
I
Q
N 00
ct
CL
U
m
( O
w M
�LLJ
O I�
LLL
w X
W
O I
I- W
Q d.
N0000
0O
Q
O
Z
w
O
Q
N
Z
0 U
I
Q
i
00 Lk-
rnO
C
H
wLL
:
I. -
O
O
X>
rn�
LLL
w X
>
Z
I- W
Q d.
�-
o
m
3 Lo
001)
�
W
W a'
IV
(/) Q
0
La
XQ
U LLJ
� w
z
Q
�
W~
Lw
OW
LuF-
r2
W
0O
Q
OLd
Z
w
O
Q
LLJ
Z
0 U
Q
i
00 Lk-
rnO
0O
Z
OLd
F--
�
_
a
ZQ
P-
LL.
H-
Z
Lu
•
wLL
:
I. -
O
O
X>
rn�
LLL
a
U
Z
Q
LL1
Z
W
�-
Z
m
Z
0
O
J
Li
a
Qo
LuF-
H�•-
I
Z
j
.J
>Q
_
O
u-
O
U
0O
LjL
Q
O
�
_
Z
Q
F-
O
U
w0
LL.
r
LA -
wLL
-
0
U
X>
-
LLL
a
U
Z
w
F -
z
d
Q
LLJ
�o
K) (n
L0
O J
�=Q
o~�
o
�0 Q
Z
�
Leo �
Ov-z
�
co O
c� 1
JOB NO. 9845
NOVEMBER 1998
SB 601-G1