HomeMy WebLinkAbout2716-1FONT
ANA,
CALIFORNIA
LANDINGS,
1
91;1171
550 W. ORANGETHORPE
L.L.Q.
PLACENTIA,
CALIFORNIA 92870
a
e
•
�0 kr° sc,9��r`
Loc. No 2"
♦ O r
,1tlF r�
OF Cho
i
1 ,i 1 1 Of FMAM WMS:
INSPECTIONS:
1. It is the Landscape Contractor's responsibility to contact the Engineering Division Landscape Inspector,
(48) hours prior to desired inspection of an item at extension (909) 350-6633.
2. Prior to release of utilities or maintenance period commencement, the following inspections are required:.
a. Pre -Construction meeting(s).
b. Construction of irrigation system in open trench condition (prior to b. Pressure Teat 150
PSI for a three (3) hour continuous period.
C. An irrigation coverage test.
d. Planting, including street trees. Contact the parks Planning and Landscape Development
Section, Engineering Division, for species and locations.
s. Finish grade prior to seeding.
f. Compliance with approved landscape plans.
g. Any special Conditions of Approval attached to proud.
h. Final Inspection.
3. The Owner's representative and Landscape Contractor shall be present at these inspections.
MAINTENANCE GUIDELINES.:
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include, but not
limited to:
1. Cultivation of planted beds at intervals (not to exceed ten (10) days).
2. Regular mowing to maintain a lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants as necessary to control and direct growth.
4. Scheduled maintenance of irrigation controller to assure proper apptication rate of water necessary for
proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of plant material as needed due to death, disease, or lack of growth.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition.
8. Stakes, guys and ties, on trees shall be checked regularly for correct function. Ties are to be adjusted to
avoid abrasions or girdling of trunks or branches.
9. Upon completion of the three (3) months or one (1) year maintenance period, an inspection shaft be
made by the Community Development Department Engineering Division Landscape Inspection staff. The '
landscape shall be maintained in accordance with these landscape maintenance standards.
maintenance bonding shall be released at the end of the appropriate period if the landscape is maintained
according to plans and specifications.
10. The p6vipall bond holder is responsible to contact the City and schedule the maintenance inspection
r
VICINITY MAP SITE PLAN SHEET INDEX
NrAm MAP
SCALE: i'• 1/2 mil*
Ll
EXISTING HIGHLAND AVENUE
COMMERCIAL SITE
W— — •---r• — , — -arm -W
FF
e
wZ 1
� N.A.P.
JJ L.J I
• 1
4-4
— r
N.A.P.PAQW
? .—... • - .—+.. � .• � ` , • , • _ .
Y
SCHOOL SITE
SITE ;
rcf.X
SCALE: 11" -4Q0
L- 1
H'
N
W
Z
O
•
V
L-3
ni
2
a.
J
0
�.�
Z
L- 5
N
O
�
Z
O
LL:5
�
I`CQ00
0
rr
(�
W
I.—
J
0
Z
7
<Z
0
Q
i
OCYIOZ
Z
L-1 0
Z
Q
Z
CL
U
<
J
�
<
o
LO
a_
w
QN
L/W-4
L- 1
H'
N
o
ICLIL
L- 2 -
L-3
ni
L. 4
LAYOUT PLAN
Z
L- 5
�
LAYOUT & DETAILS
0
F-
CONSTRUCTION DETAILS
LL
L- 7
4Q
_
W
L- 9
o0
J
L-1 0
X
x
Q
CL
t,
)�
w
U
0
w
QN
L/W-4
w
Z
W
��
a
�
cc
F'
W
W
Z
Re
r�,�,ONrer
.� ?
0
�„
) Z
Z
Lal.
�'
�r+
c w
m �
U.
Z
t
0
ccCL
a
r m
m
U
0
U
mW
W
Z
a
z
Ne
cc
cin
w
w
z
n
n
U
L- 1
TITLE SHEET
L- 2 -
L-3
GRADING PLANS
L. 4
LAYOUT PLAN
L- 5
ENTRY MONUMENTATION
LAYOUT & DETAILS
L- 6
CONSTRUCTION DETAILS
L- 7
CONSTRUCTION SPECIFICATIONS
L- 6 -
L- 9
IRRIGATION PLANS
L-1 0
t.
IRRIGATION�r
Lwl 1
t,
)�
L -1 2L-
o5
L/W-4
44f 1 /91
1�f�gpw
L_1
Re
r�,�,ONrer
�ce
Fl
�r+
O
t
Tom,,
Q
LO�.
r Z
Q LL
Q
W
W Cf)
X(D Q
Z
U) Z
i
W � �
�.. Q 0
1�-- J Li
r.
Y
Y
Y
A
1
V Z=
ac
v
P
VqW
22
*w4
t 'rte
KW 1" _ 20, .011
~ M 7�—
» TR. 15555
L �
W
,.x
�W