Loading...
HomeMy WebLinkAbout2714-55y P6;r�� -TV Horn ^44 c^10- Nc���• FW -'r- -n ct� go&is fropo- coNc�� ��v � t�6• 446 POW& .v*� p P- P05� fteO +AV POW64*40 FP.- POGO �wlc� tet- 9luce Lv*� FNL WwM� pry- IV wav &4 ro",Ao 19Pr?Nl L► /425� 1. ;v' L. le L to• rw T OW I I � � i 4-Y* L44qTl4e� /W)r' i r albwov-*A- ar 4K ep e p.A* 6►2 Ad2► � X •dl 417' �� �� Oji'$► !�� � txt Fmor i�� '/4� A X1'4! . p 6;) 'ra �1Gon �,�( Core. �� • �► ^L- HXP TV 00 RAAPL� F9 paw pcep FNwlt r : - 191101N 1141mv low povow -r 9 vv�Tvp)o". SIN mac- EX ft.� 9121 NG 0 MR. -M IsE046p rvo rKiisw Otl�/r Y� • f -}m -D PoR1wM x- PdST Y�-" QA` iKt.T4 ,�r�l Gp4c4� WWc 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES. 2. CONTRACTOR SHALL VERIFY LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION AND SHALL BE HELD LIABLE FOR ALL DAMAGES INCURRED DURING CONSTRUCTION. 3. CONTRACTOR SHALL OBTAIN A CURRENT STRUCTURAL SOILS REPORT. THIS ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO GOVERNING CODES SOILS REPORT SHALL SUPERSEDE THE RECOMMENDATIONS AND DETAILS SHOWN ON THESE PLANS AND SPECIFICATIONS 4. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL SLEEVING ALL WOOD SHALL BE ROUGH SAWN (ROS) UNLESS OTHERWISE NOTED. (IRRIGATION, ELECTRICAL, AND DRAINAGE) WITH THE APPROPRIATE 3. CONTRACTORS. S. ALL FORMS AND ALIGNMENT OF HARDSCAPE ITEMS SHALL BE INSPECTED AND OTHERWISE NOTED. APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO POURING. 4. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT A MINIMUM OF 48 HOURS PRIOR TO THE INSPECTION. 6. CONTRACTOR SHALL NOT WILLFULLY PROCEED WITH CONSTRUCTION AND OR 6. GRADING WHEN IT IS OBVIOUS THAT UNKNOWN OBSTRUCTIONS AND OR GRADE DIFFERENCES EXIST THAT MAY NOT HAVE BEEN KNOWN DURING PAINTED WITH MINIMUM 2 COATS OF ZINC CHROMATE PRIMER. DESIGN. SUCH CONDITIONS SHALL BE IMMEDIATELY BROUGHT TO THE 7. ATTENTION OF THE OWNER'S AUTHORIZED REPRESENTATIVE. THE ' CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL NECESSARY THE CONTRACTOR SHALL PAINT ALL STRAPS, BRACKETS, HANGERS, ETC. TO REVISIONS DUE TO FAILURE TO GIVE SUCH NOTIFICATION. 7. THE CONTRACTOR SHALL VERIFY ALL MEASUREMENTS AND SHALL BE RESPONSIBLE FOR THE PROPER WORKING OUT OF ALL DETAILS OF ALL BOLTS SHALL BE CADMIUM PLATED, GALVANIZED OR PRIMERED. INSTALLATION. ANY CONSTRUCTION NOT MEETING THE APPROVAL OF THE 10. OWNER OR LANDSCAPE ARCHITECT SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE WITH ACCEPTABLE CONSTRUCTION. S. THE LOCATION OF FEATURES TO BE CONSTRUCTED, NOT SPECIFICALLY 12. DIMENSIONED MAY BE DETERMINED BY SCALE. VERIFY ALL SUCH CONDITIONS WITH OWNER. 9. ALL CURVE TO CURVE AND CURVE TO TANGENT LINES SHALL BE NEAT, TRIM, SMOOTH AND UNIFORM. 10. ALL DIMENSIONS SHALL BE VERIFIED AGAINST EXISTING CONDITIONS AND ANY DISCREPANCIES REPORTED TO THE OWNER'S REPRESENTATIVE. 11. ALL CONSTRUCTION AND INSTALLATION OF LANDSCAPE ITEMS SHALL BE PER LOCAL CODES AND ORDINANCES. 12. THE CONTRACTOR SHALL HAVE SECURED ANY PERMITS OR CERTIFICATIONS REQUIRED BY THE CITY, COUNTY OR STATE AUTHORITIES PRIOR TO CONSTRUCTION. 13. AT THE COMPLETION OF EACH CONSTRUCTION OPERATION, THE PREMISES ARE TO BE LIFT NEAT AN CLEAN. ALL SURPLUS MATERIAL, DEBRIS AND WASTE ARE TO BE REMOVED FROM THE SITE. BROOM AND WASH THE AREA CLEAN. 14. THE CONTRACTOR SHALL TAKE ALL NECESSARY AND PROPER PRECAUTIONS TO PROTECT ADJACENT PROPERTIES FROM ANY AND ALL DAMAGE THAT MAY OCCUR FROM WATER RUN OFF AND OR DEPOSITIONS OF DEBRIS RESULTING FROM ANY AN ALL WORK IN CONNECTION WITH WORK PER THESE PLANS. 15. THE CONTRACTO4R IS RESPONSIBLE FOR THE PROTECTION OF ALL UTILITY LINES, VALVES, METERS, ETC., WITHIN THE LIMITS OF WORK, WHETHER THEY ARE SHOWN ON THESE PLANS OR NOT. 18. ALLOW FOR ADJOINING CONSTRUCTION. 17. REFER TO SPECIFICATIONS FOR ACCEPTED STANDARDS OF MATERIALS AND WORKMANSHIP. A. . 1 oil Log WOOD CONSTRUCTION NOTES 1. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO GOVERNING CODES AND ORDINANCES. 2. ALL WOOD SHALL BE ROUGH SAWN (ROS) UNLESS OTHERWISE NOTED. 3. ALL WOOD SHALL BE DOUGLAS FIR (DF) SELECT GRADE #t1 UNLESS OTHERWISE NOTED. 4. ALL NAILS SHALL BE GALVANIZED IRON. 5. REFER TO UNIFORM BUILDING CODE FOR NAILING SCHEDULES. 6. ALL STRAPS, BRACKETS, HANGERS, ETC., SHALL BE GALVANIZED STEEL OR PAINTED WITH MINIMUM 2 COATS OF ZINC CHROMATE PRIMER. 7. REFER TO PLAN FOR COLOR OF PAINT OR STAIN FOR WOOD STRUCTURE. ' S. THE CONTRACTOR SHALL PAINT ALL STRAPS, BRACKETS, HANGERS, ETC. TO MATCH WOOD FINISH UNLESS OTHERWISE NOTED. 9. ALL BOLTS SHALL BE CADMIUM PLATED, GALVANIZED OR PRIMERED. 10. ALL CONSTRUCTION SHALL BE PLUMB AND TRUE. 11. ALL LUMBER SHALL BE SET CROWN SIDE UP, WHERE APPLICABLE. • 12. THE CONTRACTOR SHALL USE FINISH NAILS ON EXPOSED WOOD SURFACES AND COUNTERSINK HEADS 1/8'. A. . 1